We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.

For more information visit our privacy policy.

Make-Ready definition

Make-Ready means the modification or replacement of a utility pole, or of the lines or equipment on the utility pole, to accommodate additional facilities on the utility pole.
Make-Ready means the modification or replacement of a utility pole, or of the lines
Make-Ready means the transfer, relocation, rearrangement, or alteration of a Pre-Existing Third Party User’s communications equipment, Antenna, line or Facility of any kind necessary to provide space for an Attacher to install an Attachment.

Examples of Make-Ready in a sentence

  • EVSE and Make-Ready parking spaces will support the State’s transition to an electric transportation sector, reducing automobile air pollution, greenhouse gas emissions, and storm water runoff contaminants.

  • The purpose of this ordinance is to promote and encourage the use of electric vehicles by requiring the safe and efficient installation of EVSE and Make-Ready parking spaces through municipal parking regulations and other standards.

  • LQP Factor: A Cooperative formula used for Loads of Questionable Permanence for calculating refunds.Cloverland Electric Cooperative Page | 39 Make-Ready: The modification or replacement of utility pole(s), line(s)/conductor(s), or equipment to accommodate the attachment of additional facilities on a utility pole or other Cooperative facilities.

  • A reasonable deposit shall be required for map preparation, make-ready surveys and Make-Ready Work.

  • In order to potentially qualify for such reimbursement, Attaching Party must provide records detailing the costs of the additional capacity, calculated in a way that is reasonable in light of the full costs of the Make-Ready Work.


More Definitions of Make-Ready

Make-Ready means the pre-wiring of electrical infrastructure at a parking space, or a set of parking spaces, to facilitate easy and cost-efficient future installation of Electric Vehicle Service Equipment (“EVSE”), including, but not limited to, Level-Two EVSEs and DCFCs. More specifically, Make-Ready includes expenses related to service panels, junction boxes, conduit, wiring, etc., necessary to make a particular location able to accommodate EVSE on a “plug and play” basis.
Make-Ready means the pre-wiring of electrical infrastructure
Make-Ready is defined as physical changes to facilities that must be completed by these entities before Xxxx can commence their construction. These facility changes are outside of Xxxx'x control and may introduce 180 days into a construction schedule. Xxxx will use all commercially reasonable means to determine and communicate any changes to the construction schedule that will have an impact on the service delivery date.
Make-Ready means all work necessary or appropriate to make space for or otherwise accommodate new, additional or changed Attachments, including, but not limited to, necessary or appropriate Rearrangements, removal and replacement of the pole, Transfers and other work incident thereto.
Make-Ready means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of Electric Vehicle Supply Equipment or Electric Vehicle Service Equipment, including, but not limited to, Level Two EVSE and direct current fast chargers. Make Ready includes expenses related to service panels, junction boxes, conduit, wiring, and other components necessary to make a particular location able to accommodate Electric Vehicle Supply Equipment or Electric Vehicle Service Equipment on a “plug and play” basis. “Make-Ready” is synonymous with the termcharger ready,” as used in P.L.2019, c.362 (C.48:25-1 et al.).
Make-Ready means the pre-wiring of electrical infrastructure at a parking space, or set of parking spaces, to facilitate easy and cost-efficient future installation of Electric Vehicle Service Equipment, including, but not limited to, Level Two EVSE and DC Fast Chargers. Making a site Charger-Ready includes expenses related to service panels, junction boxes, conduit, wiring, etc., necessary to make a particular location able to accommodate Electric Vehicle Service Equipment on a “plug and play” basis. “Make-Ready” is synonymous with the term “Charger-Ready.”
Make-Ready work: BellSouth inserts the name of BellSouth representative responsible for coordinating make-ready work. 25. Telephone: BellSouth inserts contact number of BellSouth representative responsible for coordinating make-ready work. Sequence Note: BellSouth returns form to Licensee. Licensee completes the Items 26 through 29 and returns form to BellSouth SPOC. Continued on next page. Continued from previous page.