MATERIALS AND WORKMANSHIP. (a) All equipment, material, and articles incorporated into the work covered by this Agreement shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this Agreement.
(b) Seller shall obtain Company approval of the machinery and mechanical and other equipment to be incorporated into the work. When required by Company, Seller shall also obtain Company's approval of the material or articles which Seller contemplates incorporating into the work. When so directed, Seller shall submit samples for approval at Seller's expense. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) References in the specifications or drawings to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. Seller may, with Company's written approval, use any equipment, material, article, or process that is equal to that specified, unless the words "No Substitution" follow the listing of the item in the specifications or drawings. Unless otherwise agreed, modifications due to use of “or equal” supplies, is at Seller’s expense.
(d) All work under this Agreement shall be performed in a skillful and workmanlike manner. Company may require, in writing, Seller to remove from the work any employee Company deems incompetent, careless, or otherwise objectionable.
MATERIALS AND WORKMANSHIP. Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.
MATERIALS AND WORKMANSHIP. The Contractor shall be required to furnish all materials, supplies, equipment and/or services necessary to perform Contractual requirements. Materials, supplies and workmanship used in the construction of equipment for this Master Agreement shall conform to all applicable federal, state, and local codes, regulations and requirements for such equipment, specifications contained herein, and the normal uses for which intended. Materials, supplies and equipment shall be manufactured in accordance with the best commercial practices and standards for this type of materials, supplies, and equipment.
MATERIALS AND WORKMANSHIP.
a) Unless otherwise specifically provided in this contract, all equipment, material and articles incorporated in the work covered by this contract are to be new and of the most suitable grade for the purpose intended. Unless otherwise specifically provided in this contract, reference to any equipment, material, article or patented process, by trade name, make or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition, and the contractor may, at the contractor’s option, use any equipment, material, article, or process which, in the judgment of the contracting officer is equal to that named. The contractor shall furnish to the contracting officer for approval the name of the manufacturer, the model number and other identifying data and information respecting the performance, capacity, nature and rating of the machinery and mechanical and other equipment which the contractor contemplates incorporating in the work. When required by this contract or when called for by the contracting officer, the contractor shall furnish the contracting officer for approval, full information concerning the material or articles which the contractor contemplates incorporating the work. When so directed, samples shall be submitted for approval at the contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and articles installed are used without required approval shall be at the risk of subsequent rejection.
b) Contractor shall not incorporate in the work any salvaged material except upon prior written approval of the contracting officer. If salvage material is accumulated during construction or installation, contractor shall adequately store and safeguard the same and shall not remove such material from the premises or site of the work without prior written consent of the contracting officer. Contractor
c) Contractor warrants that no materials imported or produced with Economic Cooperation Act or Mutual Security Act funds in the country where the work is located will be used or incorporated in the construction work.
d) All work under this contract shall be performed in a skillful and workmanlike manner. The contracting officer may, in writing, require the contractor to remove from the work any employee the contracting officer deems incompetent, careless, undesirable for security reasons, or otherwise objectionable.
e) The contractor has sole responsibility for all such material and...
MATERIALS AND WORKMANSHIP. Landlord covenants and agrees that all work performed in connection with the construction of the Premises shall be performed in a good and workmanlike manner and in accordance with all applicable laws and regulations and with the final approved Plans. Landlord agrees to exercise due diligence in completing the construction of the Premises.
MATERIALS AND WORKMANSHIP. 1. All materials, equipment and installations must meet Landlord’s minimum standards for the Building, as may be designated by Landlord from time to time, and all materials shall be new, commercial grade and of first-class quality. Any deviation from these requirements will be permitted only if clearly indicated or specified on Tenant’s Design Submission and approved by Landlord.
2. Alterations shall be constructed in a professional, first-class and workmanlike manner, in accordance with Tenant’s Design Submission.
3. The General Contractor shall guaranty all materials and workmanship against defects for a period of not less than one (1) year from installation. Notwithstanding any limitations contained in such guaranty or in any contract, purchase order or other agreement, during the entire term of the Lease, Tenant shall promptly repair or replace, at Tenant’s cost, any defective aspect of the Alterations except for insubstantial defects that do not adversely effect the Building or the appearance or rental value of the Premises, as determined by Landlord in its sole discretion.
4. Alterations must be compatible with the existing Building Systems. In the event any Alterations shall interfere with the proper functioning of any Building System, Tenant, at Tenant’s sole cost and expense, shall promptly cause such repairs, replacements or adjustments to be made to the Alterations as are necessary to eliminate any such interference.
MATERIALS AND WORKMANSHIP a) All materials and workmanship shall be the best of the respective kind and described in the schedules. The architect’s decision regarding the rates, quantity, and sufficiency of materials and workmanship will be final and binding on the contractor—specific brands mentioned as per the attached schedule. b) The Architects shall have the power to order the removal from any defective materials or work to order substitutions of work materials under this agreement and the schedules. c) Notwithstanding 12 (b) above the architect, may allow, in writing with the owner’s prior written approval, such defective materials and/or work to remain with the owner’s consent and shall fix such lower rates or prices as they deem fit. These shall be binding on the contractor.
MATERIALS AND WORKMANSHIP. All materials used and all work performed under the contract shall conform in all respects to the latest amended rules, regulations and requirements which are set forth in the Uniform Building Code, Uniform Plumbing Code; National Electric Code; California Electric Safety Orders; California Department of Industrial Relations, Division of Industrial Safety regulations; and any other regulatory requirement having jurisdiction over this type of work. Materials, articles or equipment furnished by the Contractor for incorporation into the work shall be new. When the contract documents indicate or require that such materials, articles or equipment are to be furnished, but the quality or kind thereof is not particularly specified, shown or indicated, the Contractor shall furnish materials, articles or equipment at least equal to the class or quality of the materials, articles or equipment that are specified, shown or indicated. Substantiating data of the equal item shall be presented to the State within 35 calendar days after the award of the contract. All work shall be performed in a first class and xxxxxxx-like manner in accordance with the true intent and meaning of the Plans and Specifications. Every part of the work shall be accomplished by the workers, laborers or mechanics especially skilled in the class of work required and workmanship shall be the best. Completed work shall be to the entire satisfaction of the State of California. The State shall be the sole judge as to whether the materials or workmanship is acceptable. Should any portion of the completed work or any materials, articles or equipment delivered fail to comply with the requirements of the contract, such work, materials, articles or equipment shall be rejected. The Contractor shall immediately replace, at his/her own expense, all unacceptable materials and all unacceptable work shall immediately be made satisfactory to the State by the Contractor at no additional expense to the State. Any rejected materials, articles or equipment shall immediately be removed from the premises at the expense of the Contractor.
MATERIALS AND WORKMANSHIP. B.3.1 The intent of the Contract Documents is to provide for the construction and completion in every detail of the Work described. All Work shall be performed in a professional manner and unless the means or methods of performing a task are specified elsewhere in the Contract Documents, Contractor shall employ methods that are generally accepted and used by the industry, in accordance with industry standards.
B.3.2 The Contractor is responsible to perform the Work as required by the Contract Documents. Defective Work shall be corrected at the Contractor's expense.
B.3.3 Work done and materials furnished shall be subject to inspection and/or observation and testing by the Owner's Authorized Representative to determine if they conform to the Contract Documents. Inspection of the Work by the Owner's Authorized Representative does not relieve the Contractor of responsibility for the Work in accordance with the Contract Documents.
B.3.4 Contractor shall furnish adequate facilities, as required, for the Owner's Authorized Representative to have safe access to the Work including without limitation walkways, railings, ladders, tunnels, and platforms. Producers, suppliers, and fabricators shall also provide proper facilities and access to their facilities.
B.3.5 The Contractor shall furnish Samples of materials for testing by the Owner's Authorized Representative and include the cost of the Samples in the Contract Price.
MATERIALS AND WORKMANSHIP. The materials and equipment furnished under this Agreement will be of good quality and new unless otherwise required or permitted by Exhibit “A” attached hereto, the Project will be free from defects and faults in material and workmanship and the Project will conform to the requirements of Exhibit “A;”