Metering Point definition

Metering Point means, for meters that do not use instrument transformers, the point at which the billing meter is connected. For meters that use instrument transformers, the point at which the instrument transformers are connected.
Metering Point means the physical location at the Facility where the Facility Meter is situated. “Monthly Settlement Date” has the meaning set forth in Section H of this Service Classification. “MW” means megawatt.
Metering Point means Metering Point for each plot shall be at GETCO substation 66 kV terminal point.

Examples of Metering Point in a sentence

  • Metering Point [Drafting note: the shortlisted Proponent is required to provide this information as part of its Financial Value Bid in Stage B of the Tender Process.] means [insert].


More Definitions of Metering Point

Metering Point in this context means each MPAN with the exception of customers taking complex supplies which require two MPANs to function. Such customers will see the above detailed charge levied once for each unique Radio Telemeter controlled supply.
Metering Point means the point at which energy shall be measured and supplied to GUVNL and shall be at the interconnecting bus bar of the GETCO / CTU substation.
Metering Point means points where metering shall be provided for Project and shall be as follows:
Metering Point means the point at which a Utility is metered prior to supply to your Premises, and at which title and risk in Energy passes to you. There may be more than one Metering Point at each Premises;
Metering Point means the point where CEB metering of Seller's Energy Output and Energy Input to the seller initially takes place and where title to electricity delivered by Seller passes to CEB. The Metering Point is shown as Point M on Exhibit A.
Metering Point means a location where electricity passing through an electrical installation is measured; [RT I, 28.06.2012, 1 – entry into force 08.07.2012]
Metering Point means the point at 220 kV side of 400/220 kV grid Sub-Station of CTU. However, meters has to be installed as per clause 8.8 of this Agreement. The Metering and connected equipment shall be provided by Solar Power Developers at their cost and they shall abide by the relevant CERC Regulations, Grid Code, and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended from time to time in accordance with clause 8.8 of this agreement.