{"component": "definition", "props": {"groups": [{"snippet_links": [{"key": "reference-value", "type": "definition", "offset": [10, 25]}, {"key": "power-system", "type": "definition", "offset": [69, 81]}, {"key": "by-the-company", "type": "clause", "offset": [111, 125]}], "samples": [{"hash": "c0AK2HlKp2r", "uri": "/contracts/c0AK2HlKp2r#nominal-voltage", "label": "Ds3 System Services Framework Agreement", "score": 29.0369110107, "published": true}, {"hash": "7OpbyhLfZIv", "uri": "/contracts/7OpbyhLfZIv#nominal-voltage", "label": "Ds3 System Services Framework Agreement", "score": 29.0369110107, "published": true}, {"hash": "8yRfF0xS04e", "uri": "/contracts/8yRfF0xS04e#nominal-voltage", "label": "Ds3 System Services Agreement", "score": 28.9438400269, "published": true}], "snippet": "means the reference value of the Voltage by which any section of the Power System is designated and identified by the Company;", "size": 16, "hash": "952c140137b6b696782342e65e3e0766", "id": 1}, {"snippet_links": [{"key": "connection-to-network", "type": "clause", "offset": [30, 51]}, {"key": "connection-point", "type": "clause", "offset": [91, 107]}, {"key": "the-relevant", "type": "clause", "offset": [112, 124]}, {"key": "generating-unit", "type": "definition", "offset": [137, 152]}], "samples": [{"hash": "kguOuTQeky4", "uri": "https://www.aemc.gov.au/sites/default/files/content/dc57adf5-5b01-4844-af8f-9ac8df4488b3/Chapter-5-Network-Connection.PDF", "label": "www.aemc.gov.au", "score": 2.0, "published": false}, {"hash": "jW7K294Re43", "uri": "https://www.aemc.gov.au/sites/default/files/content/d56fad30-87b6-48ab-863d-cb9942e20e15/Chapter-5-Network-Connection.PDF", "label": "www.aemc.gov.au", "score": 2.0, "published": false}, {"hash": "hTVMhQ8r3X5", "uri": "https://www.aemc.gov.au/sites/default/files/content/0de4c020-7d89-413f-b1d3-31a129188c67/Chapter-5-Network-Connection.PDF", "label": "www.aemc.gov.au", "score": 2.0, "published": false}], "snippet": "means the \u2018Nominal voltage at connection to Network\u2019 (as defined in schedule 5.5.1) at the connection point for the relevant synchronous generating unit.", "size": 4, "hash": "4368560277a148583536a3174d4bfb9a", "id": 2}, {"snippet_links": [{"key": "offered-by", "type": "definition", "offset": [41, 51]}, {"key": "transmission-owner", "type": "definition", "offset": [52, 70]}, {"key": "transmission-system", "type": "clause", "offset": [97, 116]}, {"key": "not-limited", "type": "clause", "offset": [132, 143]}], "samples": [{"hash": "lRNLi7pu1vy", "uri": "/contracts/lRNLi7pu1vy#nominal-voltage", "label": "Distribution Agreement", "score": 21.0, "published": true}, {"hash": "ctSWHd7fW6j", "uri": "/contracts/ctSWHd7fW6j#nominal-voltage", "label": "Distribution Agreement (ITC Holdings Corp.)", "score": 21.0, "published": true}], "snippet": "means an accepted standard voltage level offered by Transmission Owner, at various points on the Transmission System, including but not limited to 34.5 kV, 69 kV, 115 kV, 138 kV, 161 kV, 230 kV, and 345 kV.", "size": 4, "hash": "c2fe5d499e5a115d2d99e32ce0e1f8f9", "id": 3}, {"snippet_links": [{"key": "the-manufacturer", "type": "definition", "offset": [70, 86]}, {"key": "electrical-circuit", "type": "definition", "offset": [102, 120]}], "samples": [{"hash": "e8avYbqeQqn", "uri": "/contracts/e8avYbqeQqn#nominal-voltage", "label": "Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles", "score": 21.0, "published": true}, {"hash": "i6RBiZlx5qT", "uri": "https://unece.org/DAM/trans/doc/2010/wp29grsp/EVPC-2-02e.pdf", "label": "unece.org", "score": 5.0351114273, "published": false}, {"hash": "apBLiTKtnsy", "uri": "https://digitallibrary.un.org/nanna/record/669536/files/%5EE_%5EECE_TRANS_WP.29_GRSP_2009_16-EN.pdf?withWatermark=0&withMetadata=0&version=1&registerDownload=1", "label": "digitallibrary.un.org", "score": 5.0, "published": false}], "snippet": "means the root-mean-square (r.m.s.) value of the voltage specified by the manufacturer, for which the electrical circuit is designed and to which its characteristics are referred.", "size": 3, "hash": "0cd8b5567ad99ccb6a313d2f31790437", "id": 4}, {"snippet_links": [{"key": "to-operate", "type": "definition", "offset": [60, 70]}, {"key": "normal-circumstances", "type": "definition", "offset": [77, 97]}], "samples": [{"hash": "fwEVOaTm0t1", "uri": "https://www.ea.govt.nz/assets/dms-assets/17/17160Full-merged-set-of-the-Rules-1-November-2005-31-December-2005.pdf", "label": "www.ea.govt.nz", "score": 5.737850666, "published": false}, {"hash": "asbLAfcp5y", "uri": "https://www.ea.govt.nz/assets/dms-assets/17/17184Full-merged-set-of-the-Rules-26-October-2006-15-November-2006.pdf", "label": "www.ea.govt.nz", "score": 5.0, "published": false}], "snippet": "means the voltage at which particular equipment is designed to operate under normal circumstances;", "size": 2, "hash": "16ed4ca741d6826fa8b336207532a025", "id": 5}, {"snippet_links": [{"key": "to-operate", "type": "definition", "offset": [57, 67]}], "samples": [{"hash": "6Kx2ZMAkDSR", "uri": "http://www.legislation.vic.gov.au/Domino/Web_Notes/LDMS/PubStatbook.nsf/93eb987ebadd283dca256e92000e4069/23e889e3aae9fd0cca25702e001e9745/$FILE/05-074sr.doc", "label": "www.legislation.vic.gov.au", "score": 10.1704311371, "published": false}, {"hash": "8NcOFbuBHcc", "uri": "http://www.legislation.vic.gov.au/Domino/Web_Notes/LDMS/LTObject_Store/LTObjSt4.nsf/DDE300B846EED9C7CA257616000A3571/560082C9E0045DD7CA2577610035126E/$FILE/05-74sr001.pdf", "label": "www.legislation.vic.gov.au", "score": 10.1704311371, "published": false}], "snippet": "means the voltage at which the electric line is designed to operate;", "size": 2, "hash": "a4bb7c8e5b7b8b11f7ae5606756ac538", "id": 6}, {"snippet_links": [{"key": "operational-measures", "type": "definition", "offset": [70, 90]}], "samples": [{"hash": "9g0U2PESMfm", "uri": "https://www.nersa.org.za/wp-content/uploads/2021/08/Annexure-B_Decision-and-the-Reasons-for-Decision-on-BESF-Code.pdf", "label": "www.nersa.org.za", "score": 10.8206710815, "published": false}, {"hash": "eFMhVp3VNis", "uri": "https://www.nersa.org.za/wp-content/uploads/2021/02/BESF-Consultation-Paper.pdf", "label": "www.nersa.org.za", "score": 8.5345649719, "published": false}], "snippet": "means the utility voltage for which a network is defined and to which operational measures are referred.", "size": 2, "hash": "cb3298cb9dc037efbf209d83b94819d1", "id": 7}, {"snippet_links": [], "samples": [{"hash": "4iekMaCEY2J", "uri": "https://openjicareport.jica.go.jp/pdf/12122842.pdf", "label": "openjicareport.jica.go.jp", "score": 6.7330594063, "published": false}], "snippet": "means the voltage by which a system is designated.", "size": 2, "hash": "3c7b81365af04d060afd7fc6ba2562ca", "id": 8}, {"snippet_links": [{"key": "code-regulations", "type": "definition", "offset": [56, 72]}], "samples": [{"hash": "giIqejXuas3", "uri": "http://www.aerc.nic.in/Draft_AERC_Discom_SOP%20_Regulations_2021.pdf", "label": "www.aerc.nic.in", "score": 10.9014377594, "published": false}], "snippet": "means the nominal voltage as defined in the AERC Supply Code Regulations with permissible deviations.", "size": 1, "hash": "c791519f7d4dd7ebae8662c94f178c06", "id": 9}, {"snippet_links": [{"key": "the-system", "type": "definition", "offset": [6, 16]}, {"key": "operating-voltage", "type": "clause", "offset": [23, 40]}], "samples": [{"hash": "jUHo5Lmxj3S", "uri": "http://www.lewa.org.ls/standards/Standards/QOSSS_Rural_2008.pdf", "label": "www.lewa.org.ls", "score": 3.0, "published": false}], "snippet": "means the system rated operating voltage;", "size": 1, "hash": "dd278aaafec5ef420548e9a147440092", "id": 10}], "next_curs": "ClwSVmoVc35sYXdpbnNpZGVyY29udHJhY3RzcjgLEhpEZWZpbml0aW9uU25pcHBldEdyb3VwX3Y1NiIYbm9taW5hbC12b2x0YWdlIzAwMDAwMDBhDKIBAmVuGAAgAA==", "definition": {"snippet": "means the reference value of the Voltage by which any section of the Power System is designated and identified by the Company;", "size": 40, "title": "Nominal Voltage", "id": "nominal-voltage", "examples": ["Dynamic Reactive Response (DRR) is the ability of a Providing Unit connected to the Power System to deliver Reactive Current for Voltage Dips in excess of 30% of the <strong>Nominal Voltage</strong> at the Connection Point.", "The volume of Reactive Current required is that which would achieve at least a Reactive Power in Mvar at <strong>Nominal Voltage</strong> at the Connection Point equivalent in magnitude to 31% of the Registered Capacity of the Providing Unit.", "Service Provider to provide PQ diagram for Providing Unit in format below illustrating Reactive power range across Active Power range at <strong>Nominal Voltage</strong>.", "As long as The Power Generation Company keeps bus bar voltage at relevant time zone [Set value of relevant time +/- 1.5% of Bus Bar <strong>Nominal Voltage</strong>] within control band, it shall be deemed to have provided reactive power support service.", "Number of main transformers: \u0007\u0003 \b <strong>Nominal Voltage</strong> for each winding (Low/High): \u0007\u0003 \b / \u0007\u0003 \b kV Winding Connections (Low/High): / Available tap positions: \u0007\u0003 \b / \u0007\u0003 \b / \u0007\u0003 \b / \u0007\u0003 \b / \u0007\u0003 \b kV or \u0007\u0003 \b % \u0007\u0003 \b # of taps.", "The general electrical characteristics at the interconnection point are as follows: <strong>Nominal Voltage</strong>: 138 kV Rated Frequency: 60.00 Hz Circuit #1: 287 MVA, (1905Amps) FPL Conductor: 1431 ACSR/AZ @ 115C Circuit #2: 287 MVA, (1260Amps) FPL Conductor: 1431 ACSR/AZ @ 115C This is what FPL is designing for; however, the new Transmission Line will not be rated at 1905A due to limiting factors on existing Line.", "The parameters that characterize the different types of \u2587\u2587\u2587\u2587 are the following: \u2022 Nominal Capacity [Ah] \u2022 Nominal Energy [Wh] \u2022 <strong>Nominal Voltage</strong> [V] \u2022 Energy Density [Wh/Kg] \u2022 Nominal Impedance [\u03a9] \u2022 Cycle Life [n.", "The Offeror shall use TABLE 3 CELL PERFORMANCE PARAMETERS to provide the following information as it is related to the selection of the proposed cell to be used in the CWB: TABLE 3 C ELL PERFORMANCE PARAMETERS Cell Part number from manufacturer N/A <strong>Nominal Voltage</strong> Volts Cell Weight grams Discharge curves (voltage vs.", "<strong>Nominal Voltage</strong>: 27.2 V Operating Voltage Range: 16- 27.2V Recommended charge Max Voltage allowable: 28.8 V Comply [**] Series configuration of the ANR26650M1 form factor cells with plastic top &amp; bottom housing, end caps, sense springs.", "The integrated switchgear assembly will be provided with an external nameplate indicating the manufacturer&#x27;s drawing number and the following: Voltage Rating (KV, Nominal; KV, Maximum Design; KV, BIL); Main Bus Continuous Rating (Amperes); Short Circuit Ratings (Amperes, RMS Symmetrical and MVA Three-Phase Symmetrical at Rated <strong>Nominal Voltage</strong>); and the Momentary and Fault-Closing Ratings (Amperes, RMS Asymmetrical)."], "related": [["high-voltage", "high voltage", "high voltage"], ["voltage", "voltage", "voltage"], ["rated-voltage", "Rated Voltage", "Rated Voltage"], ["low-voltage", "low voltage", "low voltage"], ["medium-voltage", "medium voltage", "medium voltage"]], "related_snippets": [], "updated": "2025-07-17T04:25:46+00:00"}, "json": true, "cursor": ""}}