Participating TO’s Interconnection Facilities. The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.
Participating TO’s Interconnection Facilities. The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer.
Participating TO’s Interconnection Facilities. The Participating TO shall:
Participating TO’s Interconnection Facilities. Those facilities as described in Section 5(b) of this Attachment 2, as such facilities may be modified during the term of this Agreement.
Participating TO’s Interconnection Facilities. The Participating TO’s Interconnection Facilities are composed of the Customer-Financed Interconnection Facilities and the Potential Location Constrained Resource Interconnection Facilities.
Participating TO’s Interconnection Facilities. The Participating TO shall -
i. Colorado River-Dracker 220kV Transmission Tie-Line: Install an appropriate number of 220kV transmission tower structures including insulator/hardware assemblies, and appropriate number of spans of conductor and OPGW between the Interconnection Customer-owned Last Structure and the substation dead–end structure at the Colorado River 220kV switchyard. The actual number and location of the transmission tower structures and spans of conductor and OPGW will be determined by the Participating TO following completion of final engineering of the Participating TO’s Interconnection Facilities. The Phase II Interconnection Study assumed one (1) transmission tower structure and two (2) spans of conductor and OPGW.
ii. Colorado River Substation: Install the following facilities to terminate the new Colorado River-Dracker 220kV Transmission Tie-Line:
(a) One (1) dead-end substation structure
(b) Three (3) 220kV coupling capacitor voltage transformers with steel pedestal support structures
(c) Three (3) 220kV line drops
(d) Two (2) current differential relays via diversely routed dedicated digital communications channels to the Generating Facility to protect the Colorado River-Dracker 220kV Transmission Line.
(e) Two (2) N60 relays at Colorado River Substation (one each for SPS A and SPS B) to send trip signals to the Generating Facility under the Xxxxxx RAS
iii. Metering Services: Install revenue meters and appurtenant equipment at the Generating Facility required to meter the retail load at the Generating Facility. Notwithstanding that the metering will be located on the Interconnection Customer’s side of the Point of Change of Ownership, Participating TO shall own, operate and maintain the metering as part of the Participating TO’s Interconnection Facilities
iv. Power System Control: Install one (1) RTU at the Generating Facility to monitor the typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status at each Electric Generating Unit as well as the plant auxiliary load. This information will be transmitted to the Participating TO’s grid control center. Notwithstanding that the RTU will be located on Interconnection Customer’s side of the Point of Change of Ownership, Participating TO shall own, operate and maintain the RTU as part of the Participating TO’s Interconnection Facilities.
Participating TO’s Interconnection Facilities. The Participating TO shall:
(i) Phase 1 Interconnection Facilities
A. Windhub Substation – Line Drop:
B. CPC West Project 230 kV Generation Tie-Line:
Participating TO’s Interconnection Facilities. (i) Shared Interconnection Facilities between the Kingbird Solar A Project, TOT545 (Q796) Project, and TOT345 (Q412)
Participating TO’s Interconnection Facilities. (i) The Participating TO shall: Colorado River Substation.
1. Install facilities for a new 220 kV switchrack position to terminate the Generation Tie-Line. This work includes the following:
a. One (1) 220 kV dead-end substation structure.
b. Three (3) 220 kV coupling capacitor voltage transformers (“CCVTs”) with steel pedestal support structures.
c. Three (3) 220 kV line drops.
2. Install the following relays to protect the Generation Tie-Line:
a. Two (2) current differential relays via diversely routed dedicated digital communications channels to the Large Generating Facility.
Participating TO’s Interconnection Facilities. Interconnection Customer has made an initial posting of Interconnection Financial Security of $592,600.00. Pursuant to Section 9 of the LGIP, and Article 11.5 and Appendix B of the LGIA, the Interconnection Customer shall provide additional Credit Support to bring the total amount of Interconnection Financial Security at the time of the second posting to $1,791,900.00 and shall provide additional Credit Support at the time of the third posting to bring the total amount of Interconnection Financial Security to $5,973,000.00 to cover the costs for constructing, procuring and installing the Participating TO’s Interconnection Facilities. Participating TO shall notify the Interconnection Customer of the date and amount of the third posting of Interconnection Financial Security no less than thirty (30) Calendar Days before the commencement of Construction Activities on Participating TO’s Interconnection Facilities. The amount of the required Interconnection Financial Security shall be reduced dollar-for-dollar for payments the Interconnection Customer has made for work on the Participating TO’s Interconnection Facilities under the Letter Agreement and this LGIA. Interconnection Financial Security shall not include any Credit Support posted for estimated tax liability. The disposition of any released Credit Support shall be directed by the Interconnection Customer.