Pipeline Construction definition

Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.
Pipeline Construction means the initial construction and installation of the Pipeline within the Pipeline ROW Area.
Pipeline Construction means activity associated with installation, relocation, replacement, removal, or operation or maintenance of a pipeline that disturbs agricultural land, but shall not include work performed during an emergency, tree clearing, or topsoil surveying completed on land under easement with written approval from the landowner. Emergency means a condition involving clear and immediate danger to life, health, or essential services, or a risk of a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

Examples of Pipeline Construction in a sentence

  • Trans Mountain shall, upon completion of the Pipeline Construction and following any other exercise of the Easement Rights thereafter, as soon as weather and soil conditions permit, and to the extent it is practicable to do so, complete the related Pipeline ROW Area Restoration and, if applicable, Temporary Workspace Area Restoration except as otherwise agreed to by the Owner.

  • Beaver Pipeline Construction Limited Bechtel Canada Limited Xxxx Location Clearing Ltd.

  • Trans Mountain shall, upon completion of the Pipeline Construction and following any other exercise of the Easement Rights thereafter, as soon as weather and soil conditions permit, and to the extent it is practicable to do so, complete the related Temporary Workspace Area Restoration except as otherwise agreed to by the Owner.

  • Marine Pipeline Construction of Canada Limited McCaws Drilling & Blasting Ltd.

  • Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction) Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.


More Definitions of Pipeline Construction

Pipeline Construction means the same as defined in Iowa Administrative Code 199-9.1(2) and, unless otherwise defined in that rule, means activity associated with installation, relocation, replacement, removal, or operation or maintenance of a pipeline that disturbs agricultural land, but shall not include work performed during an emergency, tree clearing, or topsoil surveying completed on land under easement with written approval from the landowner.
Pipeline Construction means the initial construction and installation of the Pipeline within the area identified in the Individual Ownership Plan attached as Appendix "A" as "Area to be used for TMEP within Existing TMPL R/W".
Pipeline Construction means the initial construction and installation of the Pipeline
Pipeline Construction means installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condi- tion where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in ac- cordance with these rules.
Pipeline Construction means the initiation of any excavation or other disturbance of property for the purpose of installation, construction, maintenance, repair, replacement, modification or removal of a pipeline.
Pipeline Construction means the initial construction and installation of the Pipeline within the Pipeline ROW Areaarea identified in the Individual Ownership Plan attached as Appendix "A" as "Existing R/W".
Pipeline Construction. Refer to the attached Exhibit C 1.11 for Price List information. Contractor agrees to apply a [omitted - confidential] discount on equipment rentals and a [omitted - confidential] discount on personnel as reductions from this Price List and show such discount on every invoice issued by Contractor to Company for this particular service.