Test Reports definition

Test Reports means those reports generated by the TCK with respect to a particular Product which identify only configuration information and the successful status of individual or aggregate test executions.
Test Reports means the reports to be produced by the Supplier setting out the results of Tests;
Test Reports means the reports to be produced by the Service Provider setting out the results of Tests.

Examples of Test Reports in a sentence

  • Test Reports: After each test/inspection, promptly submit two copies of report to Architect and to Contractor.

  • SD-06 Test Reports Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements.

  • Test Reports: Certified test reports showing compliance with specified performance requirements.

  • Therefore, the Life Expectancy Test Reports (L10 and MTTF Report) that relate to this fan are only for reference.

  • Contractors are required to PROOF READ all Final Test Reports before submittal to the COTR.


More Definitions of Test Reports

Test Reports the reports to be produced by the Supplier setting out the results of Tests;
Test Reports means the documentation prepared by D&K that includes records of tests conducted and results obtained with respect to both hardware and software components of the Prototypes, or CLIENT products.
Test Reports means the safety agency compliance reports, the environmental qualification reports, the software test and integration reports, the performance test data, and the shipping package design and test data set forth in the Statement of Work.
Test Reports means all documents that refer or relate to testing of a product’s: accreditation, certification, conformance with a standard, specifications, features, design, components, troubleshooting, setup, operation, use, and/or general technical maintenance, including but not limited to, conformance test reports, interoperability test reports, partial test reports, full test reports, annexes, and any other document that UNH-IOL refers to internally as a test report.
Test Reports. Before fabrication of floor grating, floor plates, or stair treads, provide certificates which attest that all material complies with this Section. C. Shop drawings: 1. Include a layout drawing, appropriate sections, location of connections to adjacent grating and supports, and installation details for each item provided. May 2017 C01025C17 Georgetown Wet Weather Treatment Station 05530 - 2 GRATINGS, FLOOR PLATES, AND STAIR TREADS
Test Reports. Before fabrication of handrailing, provide certificates which attest to their material complying with this Section.
Test Reports. For existing surface soil and imported topsoil.