Traffic control definition

Traffic control means the labor, materials and equipment used to control traffic through or around the site of an accident on or adjacent to the highway, including but not limited to signs, barricades, signals, pavement markings, and lighting, channelizing, or hand signaling devices.
Traffic control. Any traffic control assistance beyond what is provided with the use of the facilitySecurity Services – Security services shall be a request to the Chief of Police and the availability of personnel may prohibit this service from being provided. Fire Department • On-site Staff and/or equipment: If the approved event requires Fire Department staff and/or equipment to be on-site due to the nature of the event. Renter Reference Sheet Renter/Organization Name: Requirements (If first time renter): • 3 References from a previous event location in which you hosted an event • References cannot be a part of your organization or event • Each Reference must have complete information The City of Deadwood may contact references to evaluate your performance as a renter.
Traffic control means signs, warning markers and other regulatory devices meeting the standards of the Manual of Uniform Traffic Control Devices.

Examples of Traffic control in a sentence

  • Signs, lights, flags, and other warning and safety devices shall conform to the requirements set forth in Chapter 5 of the current traffic manual, Traffic Control for Construction and Maintenance Work Zones, published by the state of California Department of Transportation.

  • TCP layouts will be prepared on double- banked 11”x17” plan sheets at 1” = 100’ scale All plans will conform to the latest Texas Manual on Uniform Traffic Control Devices (TMUTCD) and Fort Bend County Engineering Design Manual.

  • PLAN (Item 90802 - Traffic Control Plan) Work shall not proceed until all conditions of this section are met.

  • Pipe Culverts 1 1 1 0 1 0 $ 670.00 4 1 4.0 Traffic Control Plans Phasing Layout with General Notes 2 4 0 4 10 0 $ 2,700.00 20 1 20.0 Typical Construction Cross‐sections 4 6 0 4 10 0 $ 3,540.00 24 1 24.0 Advanced Warning Signs Layouts 4 6 0 4 10 0 $ 3,540.00 24 1 24.0 Phase One Layouts (1"=50' scale) 6 14 20 12 30 0 $ 11,460.00 82 7 11.7 Stella Road ‐ Cottonwood School Road to Band Road ‐ Precinct 1 Level of Effort Estimate XxXxxxxxx Engineering Corportation 4/1/2021 Proj.

  • Participants on this “Technical Working Group” (TWG) could include representation from: • Federal Aviation Administration (FAA) o Western Service Office o FAA San Francisco Airports District Office o FAA Part 139 Certification Office o FAA Western Region Runway Safety Office o SJC Air Traffic Control Tower Manager Exhibit A-1 Xxxxxx-Xxxx and Associates, Inc.


More Definitions of Traffic control

Traffic control means the process required to regulate, warn and guide road users and advise them to traverse a section of a road in the proper manner.
Traffic control means devices, such as signs, barricades, pavement markings, and signalization, used to direct traffic in safe orderly use of the highway.
Traffic control means a method used for warning traffic and protecting track work at or near grade crossings.
Traffic control means the use of trained flaggers, law enforcement, signs, barricades, cones, and/or signal devices to direct motor vehicle and non-motorized traffic around a special event. SETOP applicants are responsible for contracting with certified traffic control companies, and/or law enforcement to provide traffic control for their events. Event staff shall work under the supervision of a certified traffic control supervisor.
Traffic control means those activities necessary to safeguard the general public, as well as all workers, during the construction and maintenance of utility facilities within the right-of-way.
Traffic control. The applicable minimum signing standard attached must be adhered to, unless additional signs are required. If work is not commenced within 180 calendar days of the Agreement Approval date, this agreement is automatically void. Expired agreements may be re-approved by the unless resubmission of a new agreement by the utility is necessary due to extensive changes. It is necessary that utility notify the County Road Supervisor , Phone at least 48 hours in advance of any work under this agreement, except for emergency situations. This agreement is subject to compliance with the provisions of the Administrative Rules of Montana 18.7.201 through 18.7.241 including but are not limited to the following conditions and requirements:
Traffic control. The contractor will be allowed to restrict roadside parking adjacent to the site but shall provide and maintain one 12 foot lane for traffic in each direction at all times. Roadside parking shall be restricted with barricades, cones, or curb side signing. o If at any time during the house removal process, activities extend into a public roadway, the contractor shall provide advance warning signs and traffic control devices in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). The contractor must also submit a Traffic Control plan to the City Engineer for approval.  Contract Execution: Work cannot commence prior to June 20th, 2018  Removal must be completed prior to September 1st 2018 III. REQUIRED FORMS FROM CONTRACTOR