Examples of Water Tank in a sentence
The “Corporation” shall mean and include the registered office at Building No. 2, Block: LB 2, Sector-III, Salt Lake City, Kolkata – 700 106 (Land Mark: 16 No. Water Tank) all its branches, as the case may be, authorized to deal with all matters relating to this contract on its behalf.
The “Built Up Area” includes entire covered area/ usable area/carpet area of therespective unit including proportionate loading of common area on the particular floorplus the proportionate share of building/tower and project common areas such as; Passage, Staircase, Lifts, Lift Lobbies, Substation, DG Room, Electric/ Fire Control Room, Pump Room, Underground Water Tank, AC Plant room, Control Room, attached architectural features/ covered balconies etc.
The “Built Up Area” includes entire covered area/ usable area/carpet area of the respective unit including proportionate loading of common area on the particular floor plus the proportionate share of building/tower and project common areas such as; Passage, Staircase, Lifts, Lift Lobbies, Substation, DG Room, Electric/ Fire Control Room, Pump Room, Underground Water Tank, AC Plant room, Control Room, attached architectural features/ covered balconies etc.
The WyoLink Office tracks usage on the system (including busies) to keep aware of possible issues on WyoLink both now and in the future, and is observing heavy loading on two sites in south east Wyoming – 85 South and Cheyenne Water Tank.
Yarra Ranges Council’s Indigenous Art on Water Tank working group will provide general assistance to ensure the successful delivery of the project.
Date Label The unit can be used in the Clean Air Mode without putting water in the Water Tank.
When unit is not in use, dispose of the water in the Water Tank and Humidifying Tray.
When using the Clean Air & Humidify Mode, or the Quick Clean Mode, the Water Tank should be filled with water.REFILLING THE WATER TANK 1Remove the Water Tank by unlatching the top.
Courthouse Water Tank, Ebenezer Church Pump Station and Centerport Sewer Extension is underway Claiborne Run Sewer Interceptor Replacement came back high staff is proceeding with plan adjustments to rehabilitate a portion of the main in lieu of replacement which will reduce the cost of the project.
The contractor would also need to enter the name on the first sheet of the BoQs of the Elevated Water Tank, top right corner greyish cell, and the contractors name would be captured on other sheet.