Weep hole definition

Weep hole means a small diameter hole or series of holes located in the wall of the supply pipe for a yard hydrant that allow for drainage of accumulated water from the delivery piping. These holes are usually part of a plunger and valve system that seals off the holes during water usage and opens the holes during shutdown. These openings are located below ground level and below the frost line in areas where the threat of freezing exists.
Weep hole means a small diameter hole or series of holes located in the wall of the supply pipe for a yard hydrant that allow for drainage of accumulated

Examples of Weep hole in a sentence

  • Include:.1 Weep hole vents..2 Mortar diverters..3 Grout screens..3 Two flashing material samples, illustrating colour and colour range, size, shape, and profile.

  • Concerts depreciation and amortization expense increased $1.9 million, or 7%, during the three months ended March 31, 2012 as compared to the same period of the prior year.

  • Use low VOC products in compliance with the SCAQMD Rule 1168..4 Weep hole vents: purpose-made galvanized steel..5 Mechanical fasteners: recommended by flashing manufacturer to suit project requirements.

  • Adhesive recommended by manufacturer of flashing material..2 Weep hole vents: Purpose-made PVC grilles designed to drain cavities to exterior.SPEC.

  • Weep hole (not less than 3/16" in diameter) is required to install every 33 inches according to today's standards IRC 2012 R703.7.6 .E.

  • Include: .1 Weep hole vents..2 Mortar diverters..3 Grout screens..3 Two flashing material samples, illustrating colour and colour range, size, shape, and profile.

  • Weep hole inserts of P.V.C. pipe, granular material for weep hole backfill, expansion joint material, fence inserts, handrail inserts, guard rail inserts, and corner bars for plain concrete (gravity) retaining walls shall be considered incidental to the Work.

  • Weep hole nipplesshall be so oriented that in case of safety valve lifting and consequent fire, the flame resulting from LPG coming out from weep hole does not impinge on the sphere or structure.

  • Weep holes Weep hole Dampness present on brick wall Sill detail We believe there is a poor sill detail and there are elements hidden that we cannot see that protect dampness from getting in.

Related to Weep hole

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Public water supply system means a system for the provision to the public of piped water for human consumption, if the system has at least fifteen service connections or regularly serves at least twenty-five individuals. The term includes any source of water and any collection, treatment, storage, and distribution facilities under control of the operator of the system and used primarily in connection with the system, and any collection or pretreatment storage facilities not under such control which are used primarily in connection with the system.

  • Connection Date means the date when the Carrier having received the relevant information from the Company is in a position to and has agreed to commence provision of the Fixed Network Services to the Customer;

  • Gathering System means that portion of Gatherer’s pipeline system, including all appurtenances thereto, related to the provision of gathering and transportation services provided by Gatherer pursuant to this tariff.

  • Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.

  • Stand Alone System Upgrade Facilities means System Upgrade Facilities that a Developer may construct without affecting day-to-day operations of the New York State Transmission System during their construction. NYISO, the Connecting Transmission Owner and the Developer must agree as to what constitutes Stand Alone System Upgrade Facilities and identify them in Appendix A to this Agreement.

  • Centralized Message Distribution System (CMDS) means the industry-wide data collection system, which handles the daily exchange of message details between CMDS participating telephone companies (also known as CMDS Direct Participants). AT&T-21STATE is a CMDS Direct Participant.

  • Fresh water means water, such as tap water, that has not been previously used in a process operation or, if the water has been recycled from a process operation, it has been treated and meets the effluent guidelines for chromium wastewater.

  • Private Cloud System (PCS) A cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the Requester, a third party, or some combination of them, and it may exist on or off premises.

  • Green infrastructure means a stormwater management measure that manages stormwater close to its source by:

  • interval meter means a meter that measures and records electricity use on an hourly or sub-hourly basis;

  • Self-service storage facility or "facility" means any real property designed or used for the purpose of renting or leasing individual storage space to tenants who are to have access to that space for the purpose of storing and removing personal property.

  • Centralized Message Distribution System or "CMDS" means the operation system that Local Exchange Carriers use to exchange outcollect and IABS access messages among each other and other parties connected to CMDS.

  • Generator Operator means the Person that Operates the Generating Facility and performs the functions of supplying electric energy and interconnected operations services within the meaning of the NERC Reliability Standards.

  • Cogeneration unit means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Sewage disposal system means all interceptor sewers, storm sewers, sanitary sewers, combined sanitary and storm sewers, sewage treatment plants, and all other plants, works, instrumentalities, and properties used or useful in connection with the collection, treatment, and disposal of sewage and industrial wastes, and includes a storm water drain system under the jurisdiction and control of a governmental agency.

  • Micro wireless facility means a small cell facility that is not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height and that has an exterior antenna, if any, not longer than 11 inches.

  • Gathering lines means any pipeline, equipment, facility, or building used in the transportation of oil or gas during oil or gas production or gathering operations.

  • Deep sedation means a drug-induced depression of consciousness during which patients cannot be easily aroused but respond purposefully following repeated or painful stimulation. The ability to independently maintain ventilatory function may be impaired. Patients may require assistance in maintaining a patent airway, and spontaneous ventilation may be inadequate. Cardiovascular function is usually maintained.

  • Private sewage disposal system means a system which provides for the treatment or disposal of domestic sewage from four or fewer dwelling units or the equivalent of less than sixteen individuals on a continuing basis.

  • Day-ahead Energy Market means the schedule of commitments for the purchase or sale of energy and payment of Transmission Congestion Charges developed by the Office of the Interconnection as a result of the offers and specifications submitted in accordance with Operating Agreement, Schedule 1, section 1.10 and the parallel provisions of Tariff, Attachment K-Appendix.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • CT gantry means the tube housing assemblies, beam-limiting devices, detectors, and the supporting structures and frames which hold these components.

  • multi-system operator or “MSO” means a cable operator who has been granted registration under rule 11 of the Cable Television Networks Rules, 1994 and who receives a programming service from a broadcaster and re-transmits the same or transmits his own programming service for simultaneous reception either by multiple subscribers directly or through one or more local cable operators;

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.