Laboratory. The factory should have the following: (i) Compression testing machine of capacity minimum 200 MT (ii) Other tools and equipment for testing raw materials and paver blocks. (iii) (1) Systematic record of test results of various paver blocks manufactured in the factory. (2) Concrete Mix Design for desired grade of concrete used for making of paver blocks. 5.2.
Appears in 7 contracts
Samples: સઘįં કામ, સઘįં કામ, 117.240.113.211