Pipelines Sample Clauses

Pipelines. Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
AutoNDA by SimpleDocs
Pipelines. The down payment will be deducted from the calculation of the total payment. The balance of the consideration due, if any, will be paid within thirty (30) days of the completion of a final survey of the pipelines as installed. In the event it is necessary to place an additional line or lines, not to exceed four (4) lines, in a new lateral Right of Way, then Grantee agrees to pay Owner $ per rod for the placement of each additional pipeline that is placed in the lateral Right of Way. Grantee agrees to pay, in addition to the aforementioned payment, either (i) One Thousand Dollars and no/100 ($1,000.00) per mile, or (ii) the established yield as determined by the Farm Service Agency office per mile of growing or planted crops, or hay land, where applicable, within the right of way under the ROW Agreement which were destroyed as a direct result of the initial construction and installation of the Facilities. If said Grantor owns less interest in the above described land than the entire and undivided fee simple estate therein, then the payments herein provided for shall be paid the said Grantor only in the proportion which Grantor’s interest bears to the whole and undivided fee. It is expressly understood and agreed that the above specified payment for the ROW Agreement is contingent upon construction. SPECIFIC TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH BRACKETS AND THREE ASTERISKS [***] Owner: Grantee: Oasis Midstream Services LLC Name: Title: Oasis Midstream Partners LP Name: Title: SPECIFIC TERMS IN THIS EXHIBIT HAVE BEEN REDACTED BECAUSE CONFIDENTIAL TREATMENT FOR THOSE TERMS HAS BEEN REQUESTED. THE REDACTED MATERIAL HAS BEEN SEPARATELY FILED WITH THE SECURITIES AND EXCHANGE COMMISSION, AND THE TERMS HAVE BEEN MARKED AT THE APPROPRIATE PLACE WITH BRACKETS AND THREE ASTERISKS [***] EXHIBIT D CONFLICTING DEDICATIONS AND EXCLUDED XXXXX Xxxxx Subject to Conflicting Dedications:
Pipelines. 18.01 Lessee shall refill to contour all ditches or other excavations caused by the construction, operation, and maintenance, or removal of pipelines; construct cross ditches; lime, fertilize, and seed or replant the right-of-way; keep the pipeline and right-of-way in good repair and appearance, and take such other measures as may be deemed necessary by Department to control erosion and sedimentation and to maintain or restore the natural and aesthetic values as directed by Department.
Pipelines. Quantities delivered into or out of pipelines shall be measured by pipeline meters if available. Tank Truck/Cars: Quantities delivered into or out of tank trucks/cars shall be based on meters or shore tanks or scales located at or near the delivery point. Seller shall permit Buyer to review and copy relevant meter proving records and witness proving tests as requested. Samples of Product transferred hereunder shall be retained for ninety (90) days.
Pipelines. The pipelines listed on Exhibit “A” to this Schedule 2.1 (the “Pipelines”).
Pipelines. (a) The construction and operation of a pipeline within the JPDA for the purposes of exporting petroleum from the JPDA shall be subject to the approval of the Joint Commission. Australia and East Timor shall consult on the terms and conditions of pipelines exporting petroleum from the JPDA to the point of landing.
Pipelines. Safely operates Driox transfer pumps, fills 02 and N2 TS tanks. Understands pipeline pressure control scheme. Understands significance of customer supply. Hot Water System Understands boiler operation and can troubleshoot basic system problems. Understands water treatment system including theory and can maintain within limits. Miscellaneous Understands operation and maintenance of all above equipment so as to be able to recognize problems, and perform emergency repairs as required. Assigned housekeeping area is kept up to date. Is familiar with the Stores/Inventory system. Can understand all plant P & ID drawings and has an understanding of the FIX32 OIU and the different process controls. Level 2 - Successful completion of Praxair Operating Training Manual Modules 6, 9, 10, 11, 12 and 13. BLOC's/BOC’s Understands design and layout. Can safely start up and place them on line without purity upset. Can run in on nitrogen per procedure. Is completely knowledgeable on all compressor indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. Understands ROCPASS theory and can perform normal manipulation of same. BLNC's Understands design and layout. Can safely start up and place on line without purity upset. Is completely knowledgeable on all compressor indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. TURBINE/GENERATORS Understands design and layout. Can safely start up and place on line. Is completely knowledgeable on all turbine and generator indications and their significance to the machine. Variances from normal are noted and acted upon. Has complete knowledge of all oil and cooling systems. WARM END AIR Understands ASFH operation including filter changes and PP bed system Understands PHX operation, significance of midpoint control, balancing scheme, streams through the PHX, can troubleshoot problems and understands operation of the pre-purifiers. COOLING WATER Understands system including pump and fan switching, and can troubleshoot. Understands water treatment system and its theory, performs tests and reports problems. CHILLED WATER SYSTEM Understands the theory and operation including the starting, stopping and adjusting for optimization. MISCELLANEOUS Understands fire water system. Understands water systems and supplies. Understands effluent systems. Unders...
AutoNDA by SimpleDocs
Pipelines. Tenant shall maintain on the Premises as-built drawings that identify the precise position of any pipelines, utilities or improvements of any type Tenant places on the Premises, whether placed above or below ground, if any. Tenant shall at its sole cost and expense and within the time period required by Applicable Law whatever measures are reasonably necessary, including subsurface exploration for any pipeline or any other substructure under Xxxxxx's control or servicing Tenant's operation within the Premises granted herein, to precisely locate the position of such items if City considers such as-built drawings insufficient to locate such items. Tenant agrees any work necessary to locate such items or any damage which may result from the location being incorrectly described, whether incurred by Tenant or City, shall be borne exclusively by Tenant. Exploration and preparation of all documentation recording the location of lines or structures shall be completed within the time specified in said notice. The subsurface exploration shall verify the vertical as well as horizontal location of all pipelines and substructures. Documentation reflecting the results of said exploration shall be filed with the Harbor Engineer.
Pipelines. Schedule 4.1.19 contains a true, complete and accurate list of all pipelines serving (by either carrying products to or from) the Facilities.
Pipelines. If a transportation pipeline, including a pipeline for the transportation of natural gas, natural gas liquids, synthetic gas, liquefied petroleum gas, petroleum or a petroleum product or hazardous substance, is located on or within the Real Property, Seller shall give Buyer statutory notice regarding such pipeline(s) as required by Section 5.010 of the Texas Property Code.
Time is Money Join Law Insider Premium to draft better contracts faster.