Tree Protection Sample Clauses

Tree Protection. Under no circumstances may any tree, regardless of size or species, be removed from any designated wetland or conservation easement. Trees proposed to be maintained on -site must comply with LDC requirements. No construction activity, equipment or material is permitted inside a tree protection barrier.
AutoNDA by SimpleDocs
Tree Protection. Except for lands used for silviculture, if any, which shall be controlled by State regulations and Beaufort County’s BMP’s, Owner, its successors and assigns, including the Developer, shall comply with the provisions of ZDSO appertaining to trees.
Tree Protection. Before the commencement of Works, a Tree Protection Zone/s (TPZ) must be established around all tree/s to be retained within the site boundary. Tree protection must be maintained in accordance with the AS 4970-2009: Protection of Trees on Development Sites. The tree protection measures and zones offered by the Entrant must be approved by the Land Owners Representative prior to works commencing. Each TPZ must have: • Mulch installed and maintained to a depth of 75mm for the duration of Works; and The following works shall be excluded from within any TPZ: • Soil cut or fill including excavation and trenching; • Soil cultivation, disturbance or compaction; • Stockpiling or storage of bulk materials including soil, gravel, sand or similar materials; • The movement and storage of plant, equipment and vehicles; • The disposal of any toxic liquids including paint, solvents, cement slurry, fuel and oil; • The disposal or storage of building materials; • The erection of site offices or sheds; and • Any action likely to the impact on tree health or structure. The Entrant shall be responsible for notifying the Land Owners Representative prior to any Works within the Tree Protection Zone of any tree. The Entrant must obtain written approval from the Land Owners Representative prior to the removal or pruning of any tree. Approval must be obtained from the Land Owners Representative before cutting any roots >50mm diameter. All roots to be cut are to be cut by hand and covered with topsoil, hessian or similar biodegradable matter to buffer drying and cement contamination. If, in the Land Owners Representative’s opinion, the Entrant has cut the roots to the detriment of the tree, the Entrant will be required to replace the damaged tree with a new 500Lt tree approved by the Land Owners Representative. A penalty of $15,000 shall apply in the event that: • The Entrant is responsible for the damage or removal of any existing trees; • The Entrant is responsible for unauthorised root system damage or removal; and/or • The Entrant fails to notify the Land Owners Representative of uncovered root systems.
Tree Protection. Tenant will use best management practices recommended by Texas A&M Forest Service (“Best Management Practices”) for the protection of existing community trees during Construction Work. Such practices shall include implementation of Tree Protection Zones around trees being retained on the Land and all trees on any Construction Lay-down Area. Tenant shall prohibit within Tree Protection Zones (i) stockpiling of any type, including construction material, debris, soil and mulch, (ii) altering of soils, including grade changes, surface treatment and compaction due to vehicle, equipment and foot traffic, (iii) trenching for utility installation or repair or irrigation system installation and (iv) attachment of anything to trunks or use of equipment that causes injury to the tree.
Tree Protection. Under no circumstances shall any tree, regardless of size or species, be removed from any designated wetland or Conversation Easement. Trees proposed to be maintained on site shall meet the Town of Xxxxx in the Hills LDR’S. No construction activity, equipment or material shall be permitted inside the tree protection barrier.
Tree Protection. If there is a requirement for tree protection, reference should be made to the Queen’s standard detail, in conjunction with any other regulatory requirements.
Tree Protection. Before the commencement of Works, a Tree Protection Zone/s (TPZ) must be established around all tree/s to be retained within the site boundary. Tree protection must be maintained in accordance with the AS 4970-2009: Protection of Trees on Development Sites. The tree protection measures and zones offered by the Entrant must be approved by the Land Owners Representative prior to works commencing. Each TPZ must have: • Mulch installed and maintained to a depth of 75mm for the duration of Works; and The following works shall be excluded from within any TPZ: • Soil cut or fill including excavation and trenching; • Soil cultivation, disturbance or compaction; • Stockpiling or storage of bulk materials including soil, gravel, sand or similar materials; • The movement and storage of plant, equipment and vehicles; • The disposal of any toxic liquids including paint, solvents, cement slurry, fuel and oil;
AutoNDA by SimpleDocs
Tree Protection. Installation of snow fencing, silt fence, or polyethylene laminate safety netting shall be placed at the Critical Root Zone of Significant and Heritage Trees to be preserved on or adjacent to the property being developed. (Wayzata City Code 906.07)
Tree Protection. Under no circumstances may any tree, regardless of size or species, be removed from any designated wetland or conservation easement. Trees proposed to be maintained on site must comply with LDC requirements. No construction activity, equipment or material is permitted inside a tree protection barrier. Citrus trees are excluded from Town tree-protection requirements. However, where citrus grove exists in an open-space area on the Conceptual Land Use Plan, all or a portion of the grove, as determined by the Town Manager, must remain in the open-space area as a community-garden type activity.
Tree Protection. The Contractor shall make due allowance to include root and tree limb protection to existing trees. This work will consist of cutting all tree roots/limbs of any size to sound wood by lopping shears or sawn cut. Should backfilling not take place immediately, the tree root system shall be covered to protect against root system dying out immediately.
Time is Money Join Law Insider Premium to draft better contracts faster.