Class Licence Allowance Gross All-Purpose Wage definition

Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 1 878.35 64.50 41.00 983.85 27.3292 2 918.90 64.50 41.00 1,024.40 28.4556 3 959.45 64.50 41.00 1,064.95 29.5819 4 999.95 64.50 41.00 1,105.45 30.7069 5 1,040.50 64.50 31.00 41.00 1,177.00 32.6944 45.90 1,222.90 33.9694 6 1,081.05 64.50 31.00 41.00 1,217.55 33.8208 45.90 1,263.45 35.0958 7 1,162.10 64.50 31.00 41.00 1,298.60 36.0722 45.90 1,344.50 37.3472 8 1,243.15 64.50 31.00 41.00 1,379.65 38.3236 45.90 1,425.55 39.5986 9 1,283.70 64.50 31.00 41.00 1,420.20 39.4500 45.90 1,466.10 40.7250 10 1,405.30 64.50 31.00 41.00 1,541.80 42.8278 45.90 1,587.70 44.1028 Rates of Pay from 1st March 2009
Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 1 969.00 71.20 1,040.20 27.3737 2 1,013.75 71.20 1,084.95 28.5513 3 1,058.45 71.20 1,129.65 29.7276 4 1,103.20 71.20 1,174.40 30.9053 5 1,147.95 71.20 34.90 1,254.05 33.0013 50.60 1,304.65 34.3330 6 1,192.70 71.20 34.90 1,298.80 34.1789 50.60 1,349.40 35.5107 7 1,282.15 71.20 34.90 1,388.25 36.5329 50.60 1,438.85 37.8646 8 1,371.65 71.20 34.90 1,477.75 38.8882 50.60 1,528.35 40.2199 9 1,416.35 71.20 34.90 1,522.45 40.0645 50.60 1,573.05 41.3962 10 1,550.60 71.20 34.90 1,656.70 43.5974 50.60 1,707.30 44.9291 APPRENTICE RATES 1st Year per Week per Hour 2nd Year per Week per Hour 3rd Year per Week per Hour 4th Year per Week per Hour 1st March 2006 - Base Rate 361.90 9.5236 361.90 9.5236 545.55 14.3565 667.95 17.5776 TAFE Institute Achievement Allowance 160.00 4.2105 160.00 4.2105 160.00 4.2105 Total Rate if All modules passed 361.90 9.5236 521.90 13.7342 705.55 18.5671 827.95 21.7881 1st March 2007 - Base Rate 377.80 9.9421 377.80 9.9421 568.75 14.9671 696.05 18.3171 TAFE Institute Achievement Allowance 165.00 4.3421 165.00 4.3421 165.00 4.3421 Total Rate if All modules passed 377.80 9.9421 542.80 14.2842 733.75 19.3092 861.05 22.6592 1st March 2008 - Base Rate 394.50 10.3815 394.50 10.3815 593.10 15.6078 725.50 19.0921 TAFE Institute Achievement Allowance 170.00 4.4736 170.00 4.4736 170.00 4.4736 Total Rate if All modules passed 394.50 10.3815 564.50 14.8552 763.10 20.0815 895.50 23.5657 1st March 2009 - Base Rate 412.25 10.8486 414.90 10.9184 622.45 16.3802 760.80 20.0210 TAFE Institute Achievement Allowance 175.00 4.6052 175.00 4.6052 175.00 4.6052 Total Rate if All modules passed 412.25 10.8486 589.90 15.5236 797.45 20.9855 935.80 24.6263 1st March 2010 - Base Rate 430.80 11.3368 431.45 11.3539 648.35 17.0618 792.90 20.8657 TAFE Institute Achievement Allowance 185.00 4.8684 185.00 4.8684 185.00 4.8684 Total Rate if All modules passed 430.80 11.3368 616.45 16.2223 833.35 21.9302 977.90 25.7342 ADULT APPRENTICE RATES 1st Year per Week per Hour 2nd Year per Week per Hour 3rd Year per Week per Hour 4th Year per Week per Hour 1st March 2006 - Base Rate 465.65 12.2539 545.55 14.3565 667.95 17.5776 698.50 18.3815 TAFE Institute Achievement Allowance 160.00 4.2105 160.00 4.2105 160.00 4.2105 Total Rate if All modules passed 465.65 12.2539 705.55 18.5671 827.95 21.7881 858.50 22.5921 1st March 2007 - Base Rate 484.30 12.7447 568.75 14.9671 696.05 18.3171 727.85 19.1539 TAFE Institute Achievement Allowance 165.00 4.3421 165.00 4.3...
Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 2 857.85 60.20 33.10 951.15 26.4208 3 895.65 60.20 33.10 988.95 27.4708 4 933.50 60.20 33.10 1,026.80 28.5222 5 971.30 60.20 28.90 33.10 1,093.50 30.3750 41.60 1,135.10 31.5306 6 1,009.10 60.20 28.90 33.10 1,131.30 31.4250 41.60 1,172.90 32.5806 7 1,084.75 60.20 28.90 33.10 1,206.95 33.5264 41.60 1,248.55 34.6819 8 1,160.40 60.20 28.90 33.10 1,282.60 35.6278 41.60 1,324.20 36.7833 9 1,198.25 60.20 28.90 33.10 1,320.45 36.6792 41.60 1,362.05 37.8347 10 1,311.70 60.20 28.90 33.10 1,433.90 39.8306 41.60 1,475.50 40.9861 Rates of Pay from 1st July 2007 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Construction Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 2 857.85 60.20 33.10 951.15 26.4208 3 895.65 60.20 33.10 988.95 27.4708 4 933.50 60.20 33.10 1,026.80 28.5222 5 971.30 60.20 28.90 33.10 1,093.50 30.3750 43.70 1,137.20 31.5889 6 1,009.10 60.20 28.90 33.10 1,131.30 31.4250 43.70 1,175.00 32.6389 7 1,084.75 60.20 28.90 33.10 1,206.95 33.5264 43.70 1,250.65 34.7403 8 1,160.40 60.20 28.90 33.10 1,282.60 35.6278 43.70 1,326.30 36.8417 9 1,198.25 60.20 28.90 33.10 1,320.45 36.6792 43.70 1,364.15 37.8931 10 1,311.70 60.20 28.90 33.10 1,433.90 39.8306 43.70 1,477.60 41.0444 Rates of Pay from 1st October 2007 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Construction Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 1 836.35 61.40 38.45 936.20 26.0056 2 874.90 61.40 38.45 974.75 27.0764 3 913.50 61.40 38.45 1,013.35 28.1486 4 952.05 61.40 38.45 1,051.90 29.2194 5 990.65 61.40 29.50 38.45 1,120.00 31.1111 43.70 1,163.70 32.3250 6 1,029.25 61.40 29.50 38.45 1,158.60 32.1833 43.70 1,202.30 33.3972 7 1,106.40 61.40 29.50 38.45 1,235.75 34.3264 43.70 1,279.45 35.5403 8 1,183.55 61.40 29.50 38.45 1,312.90 36.4694 43.70 1,356.60 37.6833 9 1,222.15 61.40 29.50 38.45 1,351.50 37.5417 43.70 1,395.20 38.7556 10 1,337.85 61.40 29.50 38.45 1,467.20 40.7556 43.70 1,510.90 41.9694 Rates of Pay from 1st March 2008 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Construction Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 2 896.65 62.95 40.70 1,000.30 27.7861 3 936.20 62....

More Definitions of Class Licence Allowance Gross All-Purpose Wage

Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 2 797.60 50.65 848.25 22.3224 3 832.70 50.65 883.35 23.2461 4 867.75 50.65 918.40 24.1684 5 902.80 50.65 23.10 976.55 25.6987 40.00 1,016.55 26.7513 6 937.85 50.65 23.10 1,011.60 26.6211 40.00 1,051.60 27.6737 7 1,008.00 50.65 23.10 1,081.75 28.4671 40.00 1,121.75 29.5197 8 1,078.10 50.65 23.10 1,151.85 30.3118 40.00 1,191.85 31.3645 9 1,113.15 50.65 23.10 1,186.90 31.2342 40.00 1,226.90 32.2868 10 1,218.35 50.65 23.10 1,292.10 34.0026 40.00 1,332.10 35.0553 Rates of Pay from 1st October 2008 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 1 777.70 51.65 829.35 21.8250 2 813.45 51.65 865.10 22.7658 3 849.25 51.65 900.90 23.7079 4 885.00 51.65 936.65 24.6487 5 920.75 51.65 23.55 995.95 26.2092 40.00 1,035.95 27.2618 6 956.50 51.65 23.55 1,031.70 27.1500 40.00 1,071.70 28.2026 7 1,028.05 51.65 23.55 1,103.25 29.0329 40.00 1,143.25 30.0855 8 1,099.55 51.65 23.55 1,174.75 30.9145 40.00 1,214.75 31.9671 9 1,135.30 51.65 23.55 1,210.50 31.8553 40.00 1,250.50 32.9079 10 1,242.60 51.65 23.55 1,317.80 34.6789 40.00 1,357.80 35.7316 Rates of Pay from 1st March 2009 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 1 795.65 58.85 854.50 22.4868 2 832.35 58.85 891.20 23.4526 3 869.10 58.85 927.95 24.4197 4 905.80 58.85 964.65 25.3855 5 942.50 58.85 28.35 1,029.70 27.0974 40.00 1,069.70 28.1500 6 979.20 58.85 28.35 1,066.40 28.0632 40.00 1,106.40 29.1158 7 1,052.65 58.85 28.35 1,139.85 29.9961 40.00 1,179.85 31.0487 8 1,126.05 58.85 28.35 1,213.25 31.9276 40.00 1,253.25 32.9803 9 1,162.75 58.85 28.35 1,249.95 32.8934 40.00 1,289.95 33.9461 10 1,272.90 58.85 28.35 1,360.10 35.7921 40.00 1,400.10 36.8447 Rates of Pay from 1st July 2009 Grade EW Minimum Weekly Payment Industry Allowance Tool Allowance Gross All-Purpose Wage Supervised Licence per week per hour “A” Class Licence Allowance Gross All-Purpose Wage “A” Class Licence per week per hour 1 795.65 58.85 854.50 22.4868 2 832.35 58.85 891.20 23.4526 3 869.10 58.85 927.95 24.4197 4 905.80 58.85 964.65 25.3855 5 942.50 58.85 28.35 1,029.70 27.0974 41.60 1,071.30 28.1921 6 979.20 58.85 28.35 1,066.40 28.0632 41.60 1,108.00 29.1579 7 1,052.65 58.85 28.35 1,139.85 2...
Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 1 852.30 63.10 915.40 24.0895 2 891.65 63.10 954.75 25.1250 3 930.95 63.10 994.05 26.1592 4 970.30 63.10 1,033.40 27.1947 5 1,009.65 63.10 30.35 1,103.10 29.0289 43.70 1,146.80 30.1789 6 1,049.00 63.10 30.35 1,142.45 30.0645 43.70 1,186.15 31.2145 7 1,127.65 63.10 30.35 1,221.10 32.1342 43.70 1,264.80 33.2842 8 1,206.35 63.10 30.35 1,299.80 34.2053 43.70 1,343.50 35.3553 9 1,245.70 63.10 30.35 1,339.15 35.2408 43.70 1,382.85 36.3908 10 1,363.70 63.10 30.35 1,457.15 38.3461 43.70 1,500.85 39.4961 [Employer] - Electrical Trades Union Enterprise Agreement 2007 – 2010 APPRENTICE RATES 1st Year per Week per Hour 2nd Year per Week per Hour 3rd Year per Week per Hour 4th Year per Week per Hour 1st March 2006 - Base Rate 315.70 8.3078 319.65 8.4118 481.35 12.6671 589.10 15.5026 TAFE Institute Achievement Allowance 140.00 3.6842 140.00 3.6842 140.00 3.6842 Total Rate if All modules passed 315.70 8.3078 459.65 12.0960 621.35 16.3513 729.10 19.1868 1st March 2007 - Base Rate 328.05 8.6328 328.05 8.6328 496.20 13.0578 608.25 16.0065 TAFE Institute Achievement Allowance 150.00 3.9473 150.00 3.9473 150.00 3.9473 Total Rate if All modules passed 328.05 8.6328 478.05 12.5802 646.20 17.0052 758.25 19.9539 1st March 2008 - Base Rate 342.15 9.0039 342.15 9.0039 517.05 13.6065 633.60 16.6736 TAFE Institute Achievement Allowance 155.00 4.0789 155.00 4.0789 155.00 4.0789 Total Rate if All modules passed 342.15 9.0039 497.15 13.0828 672.05 17.6855 788.60 20.7526 1st March 2009 - Base Rate 357.55 9.4092 359.50 9.4605 542.30 14.2710 664.10 17.4763 TAFE Institute Achievement Allowance 160.00 4.2105 160.00 4.2105 160.00 4.2105 Total Rate if All modules passed 357.55 9.4092 519.50 13.6710 702.30 18.4815 824.10 21.6868 1st March 2010 - Base Rate 373.65 9.8328 377.90 9.9447 568.90 14.9710 696.20 18.3210 TAFE Institute Achievement Allowance 165.00 4.3421 165.00 4.3421 165.00 4.3421 Total Rate if All modules passed 373.65 9.8328 542.90 14.2868 733.90 19.3131 861.20 22.6631 ADULT APPRENTICE RATES 1st Year per Week per Hour 2nd Year per Week per Hour 3rd Year per Week per Hour 4th Year per Week per Hour 1st March 2006 - Base Rate 402.25 10.5855 481.35 12.6671 589.10 15.5026 616.05 16.2118 TAFE Institute Achievement Allowance 140.00 3.6842 140.00 3.6842 140.00 3.6842 Total Rate if All modules passed 402.25 10.5855 621.35 16.3513 729.10 19.1868 756.05 19.8960 1st March 2007 - Base Rate 418.35 11.0092 496.20 13.0578 608.25 16.0065 636.30 16.7447 TAFE Institu...
Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 1 747.70 49.65 797.35 20.9829 2 782.10 49.65 831.75 21.8882 3 816.45 49.65 866.10 22.7921 4 850.85 49.65 900.50 23.6974 5 885.20 49.65 22.65 957.50 25.1974 40.00 997.50 26.2500 6 919.55 49.65 22.65 991.85 26.1013 40.00 1,031.85 27.1539 7 988.30 49.65 22.65 1,060.60 27.9105 40.00 1,100.60 28.9632 8 1,057.05 49.65 22.65 1,129.35 29.7197 40.00 1,169.35 30.7724 9 1,091.45 49.65 22.65 1,163.75 30.6250 40.00 1,203.75 31.6776 10 1,194.55 49.65 22.65 1,266.85 33.3382 40.00 1,306.85 34.3908 [Employer] - Electrical Trades Union Enterprise Agreement 2007 – 2010 Rates of Pay from 1st March 2008
Class Licence Allowance Gross All-Purpose Wage. A" Class Licence per week per hour 1 869.25 64.35 933.60 25.9333 2 909.35 64.35 973.70 27.0472

Related to Class Licence Allowance Gross All-Purpose Wage

  • Class Licence Allowance Gross All-Purpose Wage "A" Class Licence per week per hour 1 954.35 70.70 1,025.05 28.4736 2 998.40 70.70 1,069.10 29.6972 3 1,042.50 70.70 1,113.20 30.9222 4 1,086.55 70.70 1,157.25 32.1458 5 1,130.65 70.70 34.00 1,235.35 34.3153 50.60 1,285.95 35.7210 6 1,174.75 70.70 34.00 1,279.45 35.5403 50.60 1,330.05 36.9460 7 1,262.90 70.70 34.00 1,367.60 37.9889 50.60 1,418.20 39.3946 8 1,351.05 70.70 34.00 1,455.75 40.4375 50.60 1,506.35 41.8432 9 1,395.10 70.70 34.00 1,499.80 41.6611 50.60 1,550.40 43.0668 10 1,527.35 70.70 34.00 1,632.05 45.3347 50.60 1,682.65 46.7404 Rates of Pay from 1st October 2010

  • Multi-purpose Lubricant means any lubricant designed for general purpose lubrication, or for use in a wide variety of applications. “Multi-purpose Lubricant” does not include “Multi-purpose Dry Lubricants”, “Penetrants”, or “Silicone-based Multi-purpose Lubricants”.

  • Distribution Licence means a licence issued under section 6(c) of the Electricity Xxx 0000;

  • class licence means a licence granted to all members of a class of persons, being a class specified in the licence;

  • Engineer-In-Charge (EIC means the Engineer officer authorised to direct, supervise and be In-charge of the works for the purpose of this contract who shall supervise and be in charge of the work.

  • Generation Licence means an electricity generation licence granted or treated as granted pursuant to section 6(1)(a) of the EA 1989 that authorises a person to generate electricity;

  • Retail charge agreement means that term as defined in section 2 of the retail installment sales act, MCL 445.852.

  • Distribution Licensee means a licensee authorised to operate and maintain a distribution system for supplying electricity to the consumers in his area of supply;

  • Customer-Funded Upgrade means any Network Upgrade, Local Upgrade, or Merchant Network Upgrade for which cost responsibility (i) is imposed on an Interconnection Customer or an Eligible Customer pursuant to Tariff, Part VI, section 217, or (ii) is voluntarily undertaken by a New Service Customer in fulfillment of an Upgrade Request. No Network Upgrade, Local Upgrade or Merchant Network Upgrade or other transmission expansion or enhancement shall be a Customer-Funded Upgrade if and to the extent that the costs thereof are included in the rate base of a public utility on which a regulated return is earned. Customer Interconnection Facilities:

  • medium term expenditure framework ’ means a budgeting framework applied by the National Treasury which—

  • income-related employment and support allowance means an income-related allowance under Part 1 of the Welfare Reform Act 2007;

  • PJM Interchange Energy Market means the regional competitive market administered by the Office of the Interconnection for the purchase and sale of spot electric energy at wholesale in interstate commerce and related services established pursuant to Operating Agreement, Schedule 1, and the parallel provisions of Tariff, Attachment K - Appendix. PJM Interchange Export:

  • Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.

  • General purpose equipment means equipment, which is not limited to research, medical, scientific or other technical activities. Examples include office equipment and furnishings, modular offices, telephone networks, information technology equipment and systems, air conditioning equipment, reproduction and printing equipment, and motor vehicles.

  • Off-vehicle charging hybrid electric vehicle (OVC-HEV) means a hybrid electric vehicle that can be charged from an external source.

  • Not off-vehicle charging hybrid electric vehicle (NOVC-HEV) means a hybrid electric vehicle that cannot be charged from an external source.

  • Solid film lubricant means a very thin coating consisting of a binder system containing as its chief pigment material one or more of molybdenum disulfide, graphite, polytetrafluoroethylene (PTFE) or other solids that act as a dry lubricant between faying surfaces.

  • Liquidation Process Regulations means, the Insolvency and Bankruptcy Board of India (Liquidation Process) Regulations 2016 as amended from time to time;

  • Major medical equipment means medical equipment which is used for the provision of medical and other health services and which costs in excess of the capital expenditure minimum, except that such term does not include medical equipment acquired by or on behalf of a clinical laboratory to provide clinical laboratory services if the clinical laboratory is independent of a physician's office and a hospital and it has been determined under Title XVIII of the Social Security Act to meet the requirements of paragraphs (10) and (11) of Section 1861(s) of such Act. In determining whether medical equipment has a value in excess of the capital expenditure minimum, the value of studies, surveys, designs, plans, working drawings, specifications, and other activities essential to the acquisition of such equipment shall be included.

  • own-source revenue means adjusted underlying revenue other than revenue that is not under the control of council (including government grants)

  • Assigned Annual Special Tax means the Special Tax of that name described in Section D.

  • Class I renewable energy means electric energy produced from

  • €STRi-pTBD means, in respect of any TARGET Business Day falling in the relevant Interest Accrual Period, the €STR for the TARGET Business Day falling “p” TARGET Business Days prior to the relevant TARGET Business Day “i”;

  • Best available control technology or “BACT” means an emissions limitation, including a visible emissions standard, based on the maximum degree of reduction for each regulated NSR pollutant which would be emitted from any proposed major stationary source or major modification which the reviewing authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combination techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 567—subrules 23.1(2) through 23.1(5) (standards for new stationary sources, federal standards for hazardous air pollutants, and federal emissions guidelines), or federal regulations as set forth in 40 CFR Parts 60, 61 and 63 but not yet adopted by the state. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard or combination thereof may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation and shall provide for compliance by means which achieve equivalent results.

  • On-premise banquet license means a license issued in accordance with