Major breakdown definition

Major breakdown means a stoppage of operation of an amusement ride or amusement attraction occurring from damage of a structural component.
Major breakdown means an unforeseeable mechanical or electrical failure off CNG of clean fuel dispensing equipment which cannot in the exercise of reasonable diligence be repaired in 72 hours or less.
Major breakdown means stoppage of operation from any cause that results in damage, failure, or breakage in a stress-bearing part of covered equipment.

Examples of Major breakdown in a sentence

  • Major breakdown of pension assets The ratio of each major category to total pension assets is as follows.

  • Exclusion: Major breakdown requiring replacement of whole equipment, such as Transformer, ATS, Submersible pump, HNC pump, Dewatering Pump (Zaran Pump), All types of electrical motor, All types of starter, DG Set , VCB/ACB and HT/LT panel board, Over Head Crane, ele.hoist, HT/LT cable, CI/DIMS pipes, Valves and fittings, etc.

  • If covered equipment is removed from service by the commissioner, the covered equipment shall be returned to service only upon the commissioner’s authorization.61.3(5) Major breakdown report.

  • Exclusion: Major breakdown requiring replacement of whole equipment, such as Transformer, ATS, Submersible pump, HNC pump, Dewatering Pump (Zaran Pump), Alltypes of electrical motor, All types of starter, DG Set , VCB/ACB and HT/LT panel board, Over Head Crane, ele.hoist, HT/LT cable, CI/DIMS pipes, Valves and fittings, etc.

  • However, for a harmonicbias voltage Φsd(t) = Φ cos (ωt), as is illustrated in Fig.

  • Major breakdown or degradation occurred in at least two of these networks and in many countries.

  • Academic dishonesty such as, but not limited to, the following may result in IMMEDIATE dismissal from the MLT program and withdrawal from all MLT courses.

  • Major breakdown is defined as a complete failure of any of the circuits at OMB main location or any location within the 20% of total circuits that customer has defined as critical.

  • Major breakdown calls case of attended and lift shall be brought into operation within 3 days from the date of lodging of complaint.

  • War or War like operations, Riots, Civil commotions, earth quake, strikes, lockout, non-availability of Raw Materials, shut down of Plant(s) Major breakdown of plants epidemical sickness, floods or other natural calamities etc.


More Definitions of Major breakdown

Major breakdown means damage, failure or breakage of a structural or stress bearing part of a device.
Major breakdown means a stoppage of operation resulting from damage, fa ilure , or breakage of a stress bearing part of a ride or device.
Major breakdown means a breakdown (such as due to switchgear failure or cable fault) which results in the interruption of electricity supply that requires substantial time to restore.
Major breakdown means a stoppage of operation from whatever cause resulting in damage, failure, or breakage of a structural or stress-bearing part of a ride.
Major breakdown means damage, failure or breakage of a structural or stress bearing part of a device. "MAJOR MODIFICATION" means any change in either the structural or operational characteristics of the device
Major breakdown means an unforeseeable mechanical or electrical failure off CNG dispensing

Related to Major breakdown

  • Breakdown /“breaks down”/“broken down” means an event during the policy period, that stops the vehicle from being driven because of a mechanical or electrical failure including as a result of battery failure, running out of fuel, flat tyres, but not as a result of a mis-fuel, road traffic collision, fire, flood, theft, acts of vandalism, any driver induced fault, or any key related issue other than keys locked in your vehicle;

  • Force Majeure Failure has the meaning set forth in Section 8.1(d).

  • Persistent Failure means any two (2) or more failures by the Supplier in any rolling period of twelve (12) months to comply with obligations in respect of the Contract Services under the Contract;

  • Service Failure means a failure by the Contractor to provide the Services in accordance with any individual service level described above (measured on a monthly/quarterly/annual basis)

  • Epidemic Failure means a series of repeating failures or defects resulting in at least a 0.5% failure rate for the same Product or Material during any twelve-month period.

  • Lockdown means the period between 23H59 on 26 March 2020, until 23H59 on 30 April 2020;

  • major accident means an incident involving loss of life inside or outside the establishment or ten or more injuries inside and/or one or more injuries outside or release of toxic chemical or explosion or fire or spillage of hazardous chemical resulting in ‘on-site’ or ‘off-site’ emergencies or damage to equipment leading to stoppage of process or adverse effect to the environment;

  • Persistent Breach means a Default which has occurred on three or more separate occasions with a continuous period of six (6) months.

  • Relevant Force Majeure Event means a Force Majeure Event in relation to which an Affected Party is claiming relief under this Clause 17; and

  • Outage has the meaning set forth in the CAISO Tariff.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Premises Total Destruction means damage or destruction to the Premises, other than Lessee Owned Alterations and Utility Installations and Trade Fixtures, which cannot reasonably be repaired in six (6) months or less from the date of the damage or destruction. Lessor shall notify Lessee in writing within thirty (30) days from the date of the damage or destruction as to whether or not the damage is Partial or Total.

  • Excused Downtime means the number of minutes in the Charging Period, rounded to the nearest minute that the link state of Customer’s Port is ‘down’ due to:

  • Excused Outage means any disruption to or unavailability of Services caused by or due to (i) Scheduled Maintenance,

  • Landlord Delay shall occur if either: (i) Landlord fails to complete the Base Building and/or other improvements on the Project that are required by the DDA, the Parking REA and/or the CC&Rs, and as a direct result of such failure Tenant is unable to obtain a temporary or permanent certificate of occupancy for the Premises upon substantial completion of the Tenant Improvements; or (ii) substantial completion of the Warm Shell Improvements or Tenant Improvements is delayed directly and solely as a result of any of the following and such delay could not have been mitigated by Tenant using commercially reasonable measures, which delay occurs after the Delivery Date and before the Commencement Date and does not result from Tenant's interference or delay in connection with completion of the Tenant Improvements or after a Tenant Default or Work Letter Draw Event: (a) subject to Paragraph 8 above, unreasonable interference by Landlord or Landlord's Contractor with the construction of the Warm Shell Improvements or the Tenant Improvements; (b) Landlord's failure to comply with any deadlines for response to, or submissions from, Tenant as required by this Work Letter; (c) any material Discretionary Changes to Landlord's Plans or the Warm Shell Plans after their final approval by applicable governmental entities (other than Tenant Modifications) that directly affect Tenant's Plans or the Tenant Improvements; and/or (d) Landlord failure to complete portions of the Base Building and/or other improvements on the Project that are Landlord's obligation to complete hereunder, and as a direct result of such failure Tenant and Tenant's contractors do not have access to the Premises to the extent required to complete the Warm Shell Improvements and/or Tenant Improvements. Tenant shall give Landlord at least five (5) days prior notice if Tenant becomes aware that Landlord is in danger of causing a Landlord Delay, and if Landlord takes appropriate measures to prevent such delay within such five (5) day period, no adjustment to the Commencement Date shall be made on account of such Landlord; provided, however, that if such delay was not reasonably foreseeable by Tenant, the five (5) day period for prior notice and opportunity to mitigate provided above shall be changed to forty-eight (48) hours after Tenant becomes aware of such delay or potential delay.

  • Premises Building Total Destruction means if the Building of which the Premises are a part is damaged or destroyed to the extent that the cost to repair is fifty percent (50%) or more of the then Replacement Cost of the Building.

  • Service Level Failure means a failure to perform the Software Support Services fully in compliance with the Support Service Level Requirements.

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Tenant Delay as used in the Lease or this Agreement shall mean any delay that Landlord may encounter in the performance of Landlord’s obligations under the Lease or this Agreement because of any act or omission of any nature by Tenant or its agents or contractors, including any: (1) delay attributable to changes in or additions to the Approved Plans or to the Landlord’s Work requested by Tenant; (2) delay attributable to the postponement of any Landlord’s Work at the request of Tenant; (3) delay caused by a Change Order requested by Tenant; (4) delay attributable to the failure of Tenant to pay, when due, any amounts required to be paid by Tenant pursuant to the Lease; or (5) delay attributable to a failure of Tenant to employ union labor for Tenant’s work at the Premises during the time the Landlord’s Work is being constructed. Tenant shall pay all actual costs and expenses incurred by Landlord which result from any Tenant Delay and the Commencement Date of the Lease shall be accelerated one (1) day for each day the Premises is not Ready for Occupancy as a result of a Tenant Delay. No Tenant Delay shall be deemed to have occurred unless Landlord gives Tenant prior written notice or written notice within five (5) days of the occurrence, as reasonable under the circumstances, specifying the claimed reasons for such Tenant Delay, and Tenant shall fail to promptly correct or cure such Tenant Delay. There shall be excluded from the number of days of any Tenant Delay, or any of the following events of force majeure: labor disputes, fire, unusual delay in transportation, adverse weather conditions not reasonably anticipatable, unavoidable casualties, delays in obtaining permits or governmental approvals or any other causes beyond Landlord’s or its contractor’s reasonable control (and other than for financial reasons) (collectively, “Force Majeure Delays”).

  • Congenital Anomaly means a condition which is present since birth, and which is abnormal with reference to form, structure or position.

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Major Tenant means a tenant of a Loan Party under a lease of Property which entitles it to occupy 15,000 square feet or more of the net rentable area of such Property.

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Major renovation means the renovation of a building where:

  • Price Failure means, with respect to a particular date of determination, the VWAP of the Common Stock on any Trading Day during the seven (7) Trading Day period ending on the Trading Day immediately preceding such date of determination fails to exceed the Floor Price (as adjusted for stock splits, stock dividends, stock combinations, recapitalizations or other similar transactions occurring after the date hereof). All such determinations to be appropriately adjusted for any stock splits, stock dividends, stock combinations, recapitalizations or other similar transactions during any such measuring period.

  • Planned Downtime means planned downtime for upgrades and maintenance to the Services scheduled in advance of such upgrades and maintenance.