35% Design Development Submission Clause Samples
POPULAR SAMPLE Copied 2 times
35% Design Development Submission. Following receipt of Owner’s approval of the Schematic Design submission, the Private Entity shall prepare a 35% Design Development submission including updated drawings and specifications. Private Entity shall submit the 35% Design Development submission to the Owner for review and approval in accordance with the Project Schedule shown in Exhibit G. The Owner review period will be in accordance with the Project Schedule shown in Exhibit G. This submission shall include details regarding the structural and mechanical, electrical and plumbing (MEP) components of the design, and cost estimate consistent with the Association for the Advancement of Cost Engineering (AACE) practices (detailed labor and material estimate by Construction Specification Institute (CSI) division).
35% Design Development Submission. Following receipt of Owner’s approval of the 10% Schematic Design submission, the Contractor shall prepare a 35% Design Development submission in accordance with Exhibit K. Contractor shall submit the 35% Design Development submission to the Owner for review and approval in accordance with the Project Schedule shown in Exhibit E. It is understood that the Owner has the option in its sole discretion to perform a value engineering study during this period. The 65% Construction Documents submission shall reflect value engineering revisions directed by the Owner at no additional cost to Owner. The Owner review period will be in accordance with the Project Schedule shown in Exhibit E.