Common use of Acceptance for Interconnection Clause in Contracts

Acceptance for Interconnection. Each application and Generator is evaluated individually and accepted or denied for interconnection with the Cooperative’s Area EPS. Any Cooperative evaluation is from the perspective of the impact of the interconnection on the Cooperative and its system. The Member is solely responsible for ensuring the safe installation and operation of the Generator. Generators shall not be interconnected until the requirements and process described in this Standard have been satisfied. The acceptance for interconnection is for the original applicant only. Subsequent owners or occupants of a site with an interconnected generator must submit a new Application to the Cooperative. The existing member assumes the responsibility of ensuring a new member is aware the new member must re-apply and obtain the Cooperative’s written acceptance or the equipment must be removed or disabled to prevent future interconnection and/or operation. The application fee for the re-applying new member is waived and the technical requirements may be grandfathered for subsequent owners as long as the Generator’s maximum output capacity has not been changed and/or the interconnection protection system has not been modified.

Appears in 6 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Acceptance for Interconnection. Each application and Generator Distributed Resource is evaluated individually and accepted or denied for interconnection with the Cooperative’s Area EPSCES. Any Cooperative evaluation is from the perspective of the impact of the interconnection on the Cooperative and its system. The Member is solely responsible for ensuring the safe installation and operation of the GeneratorDistributed Resource. Generators Distributed Resource shall not be interconnected until the requirements and process described in this Standard have been satisfied. The acceptance for interconnection is for the original applicant only. Subsequent owners or occupants of a site with an interconnected generator must submit a new Application to the Cooperative. The existing member Member assumes the responsibility of ensuring a new member Member is aware the new member Member must re-apply and obtain the Cooperative’s written acceptance or the equipment must be removed or disabled to prevent future interconnection and/or operation. The application fee for the re-applying new member Member is waived and the technical requirements may be grandfathered for subsequent owners as long as the GeneratorDistributed Resource’s maximum output capacity has not been changed and/or the interconnection protection system has not been modified.

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Acceptance for Interconnection. Each application and Generator Distributed Resource is evaluated individually and accepted or denied for interconnection with the Cooperative’s Area EPSCES. Any Cooperative evaluation is from the perspective of the impact of the interconnection on the Cooperative and its system. The Member is solely responsible for ensuring the safe installation and operation of the GeneratorDistributed Resource. Generators Distributed Resource shall not be interconnected until the requirements and process described in this Standard have been satisfied. The acceptance for interconnection is for the original applicant only. Subsequent owners or occupants of a site with an interconnected generator must submit a new Application to the Cooperative. The existing member Member assumes the responsibility of ensuring a new member Member is aware the new member Member must re-apply and obtain the Cooperative’s written acceptance or the equipment must be removed or disabled to prevent future interconnection and/or operation. The application fee for the re-re- applying new member Member is waived and the technical requirements may be grandfathered for subsequent owners as long as the GeneratorDistributed Resource’s maximum output capacity has not been changed and/or the interconnection protection system has not been modified.

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.