ACTION SUBMITTALS. A. Product Data: For each type of product.
ACTION SUBMITTALS. Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. Engineer will stamp each submittal with an action stamp and will xxxx xxxxx appropriately to indicate action taken.
ACTION SUBMITTALS. 1. Product Data: For each type of product.
a. Include construction details, material descriptions, dimensions of individual components and profiles, weights and finishes.
b. Manufacturers' specifications and other data required to demonstrate compliance with the specified requirements. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
c. Complete material list of all items proposed to be furnished and installed under this Section, including but not limited to the following items: Foundations, structural steel, purlins, PV module attachment hardware, grounding devices, WEEBS, lighting systems, and all other products required to properly install the canopies.
d. Manufacturers' recommended installation procedures which, when approved by the Owner, shall become the basis for inspecting and accepting or rejecting actual installation procedures used on the work.
e. Samples of module attachment hardware.
f. Sample lighting fixture
2. Shop Drawings: For structures and attachments
ACTION SUBMITTALS. A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for electrical identification products.
ACTION SUBMITTALS. A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for EV charging equipment.
2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
ACTION SUBMITTALS. A. Product Data: For each of the following.
1. Portland cement.
2. Fly ash.
3. Slag cement.
4. Blended hydraulic cement.
ACTION SUBMITTALS. A. Product Data: For each of the following:
1. Forms for cylindrical columns.
2. Form ties.
3. Waterstops.
4. Form-release agent.
B. Shop Drawings: Prepared by a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.
1. For exposed vertical concrete walls, indicate dimensions and form tie locations.
2. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301 (ACI 301M).
a. Location of construction joints is subject to approval of the Architect.
3. Indicate location of waterstops.
4. Indicate proposed schedule and sequence of stripping of forms, shoring removal, and reshoring installation and removal.
ACTION SUBMITTALS. A. Product Data: For each type of canopy component.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.
B. Shop Drawings: Include the following:
1. Complete erection drawings showing attachment system, column and gutter beam framing, transverse cross sections, covering and trim details, and any optional installation details to clearly indicate proper assembly of components. Drawings shall be sealed by a State Registered Structural Engineer in the state of Delaware.
ACTION SUBMITTALS. A. Product Data: For each type of enclosed switch, circuit breaker, accessory, and component indicated. Include nameplate ratings, dimensioned elevations, sections, weights, and manufacturers' technical data on features, performance, electrical characteristics, ratings, accessories, and finishes.
1. Enclosure types and details for types other than NEMA 250, Type 1.
2. Current and voltage ratings.
3. Short-circuit current ratings (interrupting and withstand, as appropriate).
4. Include evidence of a nationally recognized testing laboratory (NRTL) listing for series rating of installed devices.
5. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices, accessories, and auxiliary components.
ACTION SUBMITTALS. A. Product Data: For each type of product indicated.
B. Delegated-Design Submittal: For PV System grounding system. Include analysis data indicating compliance with performance requirements and the NEC signed and sealed by the qualified professional engineer responsible for their preparation.