Additional Design Requirements Clause Samples
Additional Design Requirements. Stamped affidavits or drawings are required for the electrical and structural components of the installation.
a. The electrical design of the PV System must be performed by a Professional Engineer (“PE”) licensed in the Commonwealth of Massachusetts.
b. The structural design of the PV System requires a stamped affidavit from a Massachusetts-licensed PE confirming that the underlying structure or bearing stratum, is adequate to withstand the static and dynamic loads of the PV System. The analysis must include all mounted portions of the PV System, including modules, racks, ballast, and other related components. The analysis must also include all mount securing portions of the PV System, including any anchors and penetrating devices.
Additional Design Requirements. [NYT, FC-R]
Additional Design Requirements. In the third bullet point add the words “except where otherwise agreed with Council” after the words “▇▇▇▇▇▇ Street boundary”. Under the sub heading Trees: In the first bullet point delete the figure “80” before the word “sqm” and replace with the figure “65”. In the second bullet point delete the figure “4m” after the words “is no less than” and replace with the figure “3m”.
