Common use of Adjustment to Contract Price Clause in Contracts

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)

Appears in 3 contracts

Samples: Procurement and Construction Agreement (Cheniere Corpus Christi Holdings, LLC), Procurement and Construction Agreement (Cheniere Energy Inc), Procurement and Construction Agreement (Corpus Christi Pipeline GP, LLC)

AutoNDA by SimpleDocs

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Stage 2 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Stage 2 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Unit Rate (in US$) Item Cost Category Year 2013 2014 2015 2016 2017 2018 Remarks 1 Home Office Home Office job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel. 4 Busing Program $ *** $ *** $ *** $ *** $ *** $ *** Rate to be applied to all direct Construction labor hours for the offsite busing program.

Appears in 2 contracts

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2012 2013 2014 2015 2016 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $*** $*** $*** $*** $*** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel.

Appears in 2 contracts

Samples: Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC), Escrow Agreement (Cheniere Energy Partners LP Holdings, LLC)

Adjustment to Contract Price. The original Contract Price was $ ___________ Net change by previously authorized Change Orders (# ) $ ___________ The Contract Price prior to this Change Order was $ ___________ The Aggregate Equipment Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ ___________ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder Change Order in the amount of $ ___________ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder Change Order in the amount of $ ___________ The new Contract Price including this Change Order will be $ ___________ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Inc)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# #______) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder Change Order in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule Key Dates The following dates Key Dates are modified (list all dates Key Dates modified; insert N/A if no dates Key Dates modified): Adjustment The Key Date for __________________ will be (increased)(decreased) by _______ (__) Days. The Key Date for __________________ as of the date of this Change Order therefore is _________ (__) Days after NTP. (list all Key Dates that are modified by this Change Order using the format set forth above) The Guaranteed Date of __________________ will be (increased)(decreased) by _______ (__) Days. The Guaranteed Date of __________________ as of the effective date of this Change Order therefore is _________ (__) Days after NTP. (list all Guaranteed Dates that are modified by this Change Order using the format set forth above) Attached to this Change Order is an updated Schedule E-1 which shall reflect and highlight any adjustment(s) to the Key Dates agreed to in this Change Order. Impact to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Impact on Payment Schedule (including, as applicable, Payment Milestones): Impact on Maximum Cumulative Payment Schedule: Adjustment to Impact on Minimum Acceptance Criteria: Adjustment to Impact on Performance Guarantees: Adjustment Impact on Basis of Design: Impact on the Total Reimbursement Amount: Any other impacts to Design Basis: Other adjustments to obligation or potential liability or obligation of Contractor or Owner under the EPC Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D):

Appears in 1 contract

Samples: Epc Agreement (NextDecade Corp.)

Adjustment to Contract Price. The original Contract Price was $ USD EUR Net change by previously authorized Change Orders (# ) $ USD EUR The Contract Price prior to this Change Order was $ USD EUR The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ USD EUR The new Contract Price including this Change Order will be $ USD EUR Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Execution Copy Phase 3 Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version Copy Phase 3 SCHEDULE D-2 4-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Driftwood LNG Phase 3 OWNER: Driftwood LNG LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compenrsation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing Execution Copy Phase 3 SCHEDULE 4-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Driftwood LNG Phase 3 OWNER: Driftwood LNG LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing Execution Copy Phase 3 SCHEDULE 4-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2019 2020 2021 2022 2023 2024 2025 2026 1 Home Office Home Office job-hour $*** $ *** $ *** $ *** $ *** $ *** $ *** $ *** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $ *** $ *** $ *** $ *** $ *** $ *** $ *** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Procurement and Construction Agreement (Tellurian Inc. /De/)

Adjustment to Contract Price. The original Contract Price was $ 2,987,000,000 Net change by previously authorized Change Orders (# #0001-00007) $ (1,124,267 ) The Contract Price prior to this Change Order was $ 2,985,875,733 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased783,454 ) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ 2,985,092,279 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) ). N/A Adjustment to Payment Schedule: Yes. See Exhibit D. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ DV Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxx Xxxxxxx Owner Contractor Xx Xxxxxxxx Xxxx Xxxxxxx Name Name SVP LNG E&C Principal Vice President Title Title June 16, 2016 May 5, 2016 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 Re-Orientation of PSV Bypass Valves PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Xxxxxx Xxxx Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: May 4, 2015 CHANGE ORDER NUMBER: CO-00009 DATE OF CHANGE ORDER: May 17, 2016 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Sabine Pass Liquefaction, LLC

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #0002) $ 64,232,581 The Contract Price prior to this Change Order was $ 3,964,232,581 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) increased by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ 12,501,325 The new Contract Price including this Change Order will be $ 3,976,733,906 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): : No Change to Project Schedule Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes. See Sections 2.b, 2.c, and Exhibit C of this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title July 18, 2012 July 10, 2012 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 DIESEL FIRED GENERATORS PROJECT NAME: Sabine Pass LNG Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: November 11, 2011 CHANGE ORDER NUMBER: CO-0005 DATE OF CHANGE ORDER: July 10, 2012 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) (see Appendix 1) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder Change Order in the amount of $ The new total Aggregate Provisional Sum Equipment Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new total Aggregate Labor and Skills Price will be $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule Key Dates The following dates Key Dates are modified (list all dates Key Dates modified; insert N/A if no dates Key Dates modified): Adjustment The Key Date for will be (increased)(decreased) by ( ) Days. The Key Date for as of the date of this Change Order therefore is ( ) Days after NTP. (list all Key Dates that are modified by this Change Order using the format set forth above) The Guaranteed Date of will be (increased)(decreased) by ( ) Days. The Guaranteed Date of as of the effective date of this Change Order therefore is ( ) Days after NTP. (list all Guaranteed Dates that are modified by this Change Order using the format set forth above) Attached to this Change Order is an updated Schedule E-1 which shall reflect and highlight any adjustment(s) to the Key Dates agreed to in this Change Order. Impact to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Impact on Payment Schedule (including, as applicable, Payment Milestones): Impact on Maximum Cumulative Payment Schedule: Adjustment to Impact on Minimum Acceptance Criteria: Adjustment to Impact on Performance Guarantees: Adjustment D-1-2 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement Impact on Basis of Design: Impact on the Total Reimbursement Amount: Any other impacts to Design Basis: Other adjustments to obligation or potential liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change changes reflected in this Change Order upon the Changed Change Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Pursuant to Section 6.4 of the Agreement, this Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Change Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change OrdersOrders or any amendments to the Agreement, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. This Change Order represents full and final consideration and/or adjustments for the above change, except as set out above. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version D-1-3 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement Appendix 1 Previously Authorized Change Orders D-1-4 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement Redacted version SCHEDULE D-2 UNILATERAL CHANGE ORDER DIRECTIVE FORM FOR STAGE 2 (for use when only Owner executes issues a Change Directive pursuant to Section 6.1E or 6.2D) D-2-1 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement Redacted version PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility AGREEMENT: Fixed Price Turnkey Agreement for Train 4 OWNER: Rio Grande LNG Train 4, LLC CONTRACTOR: Xxxxxxx Energy Inc. DATE OF AGREEMENT: August 5, 2024 CHANGE DIRECTIVE NUMBER: EFFECTIVE DATE OF CHANGE DIRECTIVE: You are hereby directed to make the following change(s) in the Agreement: (attach additional documentation if necessary) Consideration for the Work specified for this Change Directive shall be paid as provided in the Agreement. When signed by Owner and received by Contractor, this document becomes effective IMMEDIATELY as a Change Directive, and Contractor shall commence with the performance of the change(s) described above within [***] ([***]) Business Days of its receipt unless another time is expressly stated above. This Change Directive is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing D-3-1 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement Execution version SCHEDULE D-3 OWNER’S CHANGE REQUEST FORM D-4-1 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement OWNER’S CHANGE ORDER REQUEST FORM – PART 1 of 2 OWNER NOTIFICATION (To be completed by Owner) D-3-2 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement OWNER’S CHANGE ORDER REQUEST FORM – PART 1 of 2 OWNER NOTIFICATION PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility AGREEMENT: Fixed Price Turnkey Agreement for Train 4 OWNER: Rio Grande LNG Train 4, LLC CONTRACTOR: Xxxxxxx Energy Inc. DATE OF AGREEMENT: August 5, 2024 OWNER’S CHANGE ORDER REQUEST NUMBER: DATE OF THIS CHANGE ORDER REQUEST: Description of the Proposed Change to the Work: Owner requests Contractor to review and respond to this Owner’s Change Order Request, as follows: Reference Documents: Owner: By Name Title Date Contractor shall reply within the time required under Section 6.1 of the Agreement by completing Part 2 of the Change Order pursuant Request Form and submitting it to Section 6.1C Owner. This Change Order Request shall not be considered a Change Order or 6.2DChange Directive to the Agreement. A Change Order may only occur by the Parties executing a Change Order in the form of Schedule D-1 to the Agreement, and a Change Directive may only occur by Owner issuing a Change Directive in the form of Schedule D-2 to the Agreement. RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement OWNER’S CHANGE ORDER REQUEST FORM – PART 2 of 2 CONTRACTOR RESPONSE (To be completed by Contractor) D-3-4 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement OWNER’S CHANGE ORDER REQUEST FORM – PART 2 of 2 CONTRACTOR RESPONSE PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility AGREEMENT: Fixed Price Turnkey Agreement for Train 4 OWNER: Rio Grande LNG Train 4, LLC CONTRACTOR: Xxxxxxx Energy Inc. DATE OF AGREEMENT: August 5, 2024 OWNER’S CHANGE ORDER REQUEST NUMBER: DATE OF THIS CHANGE ORDER REQUEST: Description of the Work to be performed and a program for its execution: Reference Documents: Preliminary assessment of the effect (if any) such request, were it to be implemented by Change Order, would have on the Changed Criteria (including any changes to the Contract Price, Key Dates, the Scope of Work or any other Changed Criteria): (Attach additional documentation if necessary) Contractor shall provide the following as part of Contractor’s preliminary assessment: Commencement Date: Estimated Duration: Change in Contract Price: Change in Aggregate Equipment Price: Change in Aggregate Labor and Skills Price: Change in Total Reimbursement Amount: Change in Payment Schedule: Impact on Key Dates (Y/N), if “yes,” ROM impact on such Key Dates: Owner: Contractor: By By Name Name Title Title Date Date This Change Order Request shall not be considered a Change Order or Change Directive to the Agreement. A Change Order may only occur by the Parties executing a Change Order in the form of Schedule D-1 to the Agreement, and a Change Directive may only occur by Owner issuing a Change Directive in the form of Schedule D-2 to the Agreement. D-3-5 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement SCHEDULE D-4 CONTRACTOR’S CHANGE NOTICE FORM D-6-6 RGLNG T4 – Xxxxxxx – Train 4 EPC Agreement

Appears in 1 contract

Samples: Agreement (NextDecade Corp.)

Adjustment to Contract Price. The original Contract Price was $ USD EUR Net change by previously authorized Change Orders (# ) $ USD EUR The Contract Price prior to this Change Order was $ USD EUR The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in Orderin the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ USD EUR The new Contract Price including this Change Order will be $ USD EUR Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Execution Copy Phase 2 Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version Copy Phase 2 SCHEDULE D-2 4-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Driftwood LNG Phase 2 CHANGE ORDER NUMBER: OWNER: Driftwood LNG LLC DATE OF CHANGE ORDER: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing Execution Copy Phase 2 SCHEDULE 4-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Driftwood LNG Phase 2 CHANGE ORDER REQUEST NUMBER: OWNER: Driftwood LNG LLC DATE OF CHANGE ORDER REQUEST: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing Execution Copy Phase 2 SCHEDULE 4-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2019 2020 2021 2022 2023 2024 2025 2026 1 Home Office Home Office job-hour *** *** *** *** *** *** *** *** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour *** *** *** *** *** *** *** *** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Procurement and Construction Agreement (Tellurian Inc. /De/)

Adjustment to Contract Price. The original Contract Price was $ 2,987,000,000 Net change by previously authorized Change Orders (# #0001-00009) $ (1,892,788 ) The Contract Price prior to this Change Order was $ 2,985,107,212 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased72,336 ) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ 2,985,034,876 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): N/A Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) ). Adjustment to Payment Schedule: Yes. See Exhibit C. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ DV Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxx Xxxxxxx Owner Contractor Xx Xxxxxxxx Xxxx Xxxxxxx Name Name SVP LNG E&C Principal Vice President Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)June 30, 2016 June 16, 2016

Appears in 1 contract

Samples: Sabine Pass Liquefaction, LLC

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #CO-0002) $ 76,733.96 The Contract Price prior to this Change Order was $ 3,976,733,906 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased6,223,249) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ 3,970,510,657 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): N/A Adjustment to other Changed Criteria (insert N/A Criteria: if no changes or impact; attach additional documentation if necessary) ): N/A Adjustment to Payment Schedule: Yes. See Section 3 and Exhibit C to this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title July 18, 2012 July 10, 2012 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 Flange Reduction and Valve Positioner PROJECT NAME: Sabine Pass LNG Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: November 11, 2011 CHANGE ORDER NUMBER: CO-0006 DATE OF CHANGE ORDER: June 20, 2012 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #CO-0007) $ 68,167,322 The Contract Price prior to this Change Order was $ 3,968,167,322 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) not changed by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ 0 The new Contract Price including this Change Order will be $ 3,968,167,322 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): N/A Adjustment to other Changed Criteria (insert N/A Criteria: if no changes or impact; attach additional documentation if necessary) ): N/A Adjustment to Payment Schedule: N/A Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)July 31, 2012 July 27, 2012

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ 2,987,000,000 Net change by previously authorized Change Orders (# #0001-00008) $ (1,907,721 ) The Contract Price prior to this Change Order was $ 2,985,092,279 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ 14,933 The new Contract Price including this Change Order will be $ 2,985,107,212 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) ). N/A Adjustment to Payment Schedule: Yes. See Exhibit B. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ DV Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxx Xxxxxxx Owner Contractor Xx Xxxxxxxx Xxxx Xxxxxxx Name Name SVP LNG E&C Principal Vice President Title Title June 16, 2016 May 17, 2016 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 Deletion of Chlorine Analyzer PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Xxxxxx Xxxx Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: May 4, 2015 CHANGE ORDER NUMBER: CO-00010 DATE OF CHANGE ORDER: June 15, 2016 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Sabine Pass Liquefaction, LLC

Adjustment to Contract Price. The original Contract Price was $ USD EUR Net change by previously authorized Change Orders (# ) $ USD EUR The Contract Price prior to this Change Order was $ USD EUR The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ USD EUR The new Contract Price including this Change Order will be $ USD EUR Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Execution Copy Phase 4 Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version Copy Phase 4 SCHEDULE D-2 4-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Driftwood LNG Phase 4 CHANGE ORDER NUMBER: OWNER: Driftwood LNG LLC DATE OF CHANGE ORDER: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing Execution Copy Phase 4 SCHEDULE 4-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Driftwood LNG Phase 4 CHANGE ORDER REQUEST NUMBER: OWNER: Driftwood LNG LLC DATE OF CHANGE ORDER REQUEST: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing Execution Copy Phase 4 SCHEDULE 4-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2019 2020 2021 2022 2023 2024 2025 2026 1 Home Office Home Office job-hour $ *** $ *** $ *** $ *** $ *** $ *** $ *** $ *** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $ *** $ *** $ *** $ *** $ *** $ *** $ *** $ *** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Escrow Agreement (Tellurian Inc. /De/)

Adjustment to Contract Price. The original Contract Price was $ 646,936,000 Net change by previously authorized Change Orders (# #SP/BE-002, 007, 009 & 010) $ 22,777,544 The Contract Price prior to this Change Order was $ 669,713,544 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) increased by this a separate Change Order in if Contractor earns the amount Early Completion Bonus or any portion thereof as per the provisions of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): The Target Bonus Date will be unchanged. The Target Bonus Date as of the date of this Change Order therefore is 1,095 Days following NTP. The Guaranteed Substantial Completion Date will be unchanged. The Guaranteed Substantial Completion Date as of the date of this Change Order therefore is 1,247 Days following NTP. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Criteria: None Adjustment to Payment Schedule: A separate Change Order will be required to adjust the Payment Schedule if Contractor earns the Early Completion Bonus or any portion thereof Adjustment to Minimum Acceptance Criteria: None Adjustment to Performance Guarantees: None Adjustment to Design Basis: None Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either N/A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected as described in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)/s/ Xxxxxx Xxxxx /s/ X. Xxxx Xxxxx * Xxxxxx Xxxxx Chairman Contractor

Appears in 1 contract

Samples: Cheniere Energy Inc

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2012 2013 2014 2015 2016 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $*** $*** $*** $*** $*** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel.

Appears in 1 contract

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# #______) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder Change Order in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule Key Dates The following dates Key Dates are modified (list all dates Key Dates modified; insert N/A if no dates Key Dates modified): Adjustment The Key Date for __________________ will be (increased)(decreased) by _______ (__) Days. The Key Date for __________________ as of the date of this Change Order therefore is _________ (__) Days after NTP. (list all Key Dates that are modified by this Change Order using the format set forth above) The Guaranteed Date of __________________ will be (increased)(decreased) by _______ (__) Days. The Guaranteed Date of __________________ as of the effective date of this Change Order therefore is _________ (__) Days after NTP. (list all Guaranteed Dates that are modified by this Change Order using the format set forth above) Attached to this Change Order is an updated Schedule E-1 which shall reflect and highlight any adjustment(s) to the Key Dates agreed to in this Change Order. Impact to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Impact on Payment Schedule (including, as applicable, Payment Milestones): Impact on Maximum Cumulative Payment Schedule: Adjustment to Impact on Minimum Acceptance Criteria: Adjustment to Impact on Performance Guarantees: Adjustment Impact on Basis of Design: Impact on the Total Reimbursement Amount: Any other impacts to Design Basis: Other adjustments to obligation or potential liability or obligation of Contractor or Owner under the EPC Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change changes reflected in this Change Order upon the Changed Change Criteria and shall be deemed to compensate Contractor fully for such change. Initials: _____ Contractor _____ Owner [B] This Pursuant to Section 6.4 of the Agreement, this Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Change Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: _____ Contractor _____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original EPC Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change OrdersOrders or any amendments to the EPC Agreement, all other terms and conditions of the EPC Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. This Change Order represents full and final consideration and/or adjustments for the above change, except as set out above. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER DIRECTIVE FORM FOR STAGE 2 (for use when only Owner executes issues a Change Directive pursuant to Section 6.1E or 6.2D) PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility DATE OF AGREEMENT: May 24th, 2019 AGREEMENT: Fixed Price Turnkey Agreement for Train 3 CHANGE DIRECTIVE NUMBER: OWNER: Rio Grande LNG, LLC EFFECTIVE DATE OF CHANGE DIRECTIVE: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. You are hereby directed to make the following change(s) in the EPC Agreement: (attach additional documentation if necessary) Consideration for the Work specified for this Change Directive shall be paid as provided in the EPC Agreement. When signed by Owner and received by Contractor, this document becomes effective IMMEDIATELY as a Change Directive, and Contractor shall commence with the performance of the change(s) described above within [***] ([***]) Business Days of its receipt unless another time is expressly stated above. This Change Directive is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 OWNER’S CHANGE ORDER REQUEST FORM OWNER’S CHANGE ORDER REQUEST FORM – PART 1 of 2 OWNER NOTIFICATION (To be completed by Owner) PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility DATE OF AGREEMENT: May 24th, 2019 AGREEMENT: Fixed Price Turnkey Agreement for Train 3 OWNER’S CHANGE ORDER REQUEST NUMBER: OWNER: Rio Grande LNG, LLC DATE OF THIS CHANGE ORDER REQUEST: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. Description of the Proposed Change to the Work: Owner requests Contractor to review and respond to this Owner’s Change Order Request, as follows: Reference Documents: Owner: By Name Title Date Contractor shall reply within the time required under Section 6.1 of the EPC Agreement by completing Part 2 of the Change Order pursuant Request Form and submitting it to Section 6.1C Owner. This Change Order Request shall not be considered a Change Order or 6.2DChange Directive to the EPC Agreement. A Change Order may only occur by the Parties executing a Change Order in the form of Schedule D-1 to the EPC Agreement, and a Change Directive may only occur by Owner issuing a Change Directive in the form of Schedule D-2 to the EPC Agreement. OWNER’S CHANGE ORDER REQUEST FORM – PART 2 of 2 CONTRACTOR RESPONSE (To be completed by Contractor) PROJECT NAME: Rio Grande Natural Gas Liquefaction Facility DATE OF AGREEMENT: May 24th, 2019 AGREEMENT: Fixed Price Turnkey Agreement for Train 3 OWNER’S CHANGE ORDER REQUEST NUMBER: OWNER: Rio Grande LNG, LLC DATE OF THIS CHANGE ORDER REQUEST: CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. Description of the Work to be performed and a program for its execution: Description of the Work to be performed and a program for its execution: Reference Documents: Preliminary assessment of the effect (if any) such request, were it to be implemented by Change Order, would have on the Changed Criteria (including any changes to the Contract Price, Key Dates, the Scope of Work or any other Changed Criteria): (Attach additional documentation if necessary) Contractor shall provide the following as part of Contractor’s preliminary assessment: Commencement Date Estimated Duration Change in Contract Price Change in Aggregate Equipment Price Change in Aggregate Labor and Skills Price Change in Total Reimbursement Amount Change in Payment Schedule Impact on Key Dates (Y/N), if “yes,” ROM impact on such Key Dates

Appears in 1 contract

Samples: Epc Agreement (NextDecade Corp.)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Liquefaction Facility CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2012 2013 2014 2015 2016 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $*** $*** $*** $*** $*** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel.

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.)

Adjustment to Contract Price. The original Contract Price was $ 7,080,830,000 Net change by previously authorized Change Orders (# 0001-0009) $ 476,534,259 The Contract Price prior to this Change Order was $ 7,557,364,259 The Aggregate Equipment Price will be (increased) (decreased) (unchanged) changed by this Change Order in the amount of $ *** The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) changed by this ChangeOrder Change Order in the amount of $ *** The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) unchanged by this ChangeOrder Change Order in the amount of $ The new Contract Price including this Change Order will be $ 7,563,798,282 Adjustment to Aggregate Equipment Price The original Aggregate Equipment Price was $ *** Net change by previously authorized Change Orders (0001-0009) $ *** The Aggregate Equipment Price prior to this Change Order was $ *** The Aggregate Equipment Price will be changed by this Change Order in the amount of $ *** The new Aggregate Equipment Price including this Change Order will be $ *** Adjustment to Aggregate Labor and Skills Price The original Aggregate Labor and Skills Price was $ *** Net change by previously authorized Change Orders (0001-0009) $ *** The Aggregate Labor and Skills Price prior to this Change Order was $ *** The Aggregate Labor and Skills Price will be increased by this Change Order in the amount of $ *** The new Aggregate Labor and Skills Price including this Change Order will be $ *** Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): No impact to Project Schedule. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes. Exhibit E of this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ MB Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxxx X. Xxxxx Owner Contractor Xx Xxxxxxxx Xxxxx X. Xxxxx Name Name VP LNG Projects Senior Vice President Title Title 11 Aug 2015 01-JULY-2015 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL *** indicates material has been omitted pursuant to a Confidential Treatment Request filed with the Securities and Exchange Commission. A complete copy of this agreement has been filed separately with the Securities and Exchange Commission. CHANGE ORDER FORM FOR STAGE 2 Credit to EPC Contract Value for TSA Work PROJECT NAME: Corpus Christi Stage 1 Liquefaction Facility OWNER: Corpus Christi Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: December 6, 2013 CHANGE ORDER NUMBER: CO-00011 DATE OF CHANGE ORDER: July 7, 2015 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Inc

AutoNDA by SimpleDocs

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #0002-0004) $ 70,510,657 The Contract Price prior to this Change Order was $ 3,970,510,657 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) decreased by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased1,905,486) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ 3,968,605,171 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): No Change to the Project Schedule. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes, see Section 3 and Exhibit B to this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title July 24, 2012 July 12, 2012 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 Relocation of Temporary Facilities, Power Poles Relocation Reimbursement, and Duck Blind Road Improvement Reimbursement PROJECT NAME: Sabine Pass LNG Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: November 11, 2011 CHANGE ORDER NUMBER: CO-0007 DATE OF CHANGE ORDER: July 13, 2012 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #CO-0002) $ 64,232,581 The Contract Price prior to this Change Order was $ 3,964,232,581 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ 0 The new Contract Price including this Change Order will be $ 3,964,232,581 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): N/A Adjustment to other Changed Criteria (insert N/A Criteria: if no changes or impact; attach additional documentation if necessary) ): N/A Adjustment to Payment Schedule: Yes. See Section 5 & 6 and Exhibit C to this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title June 11, 2012 June 7, 2012 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 Addition of Inlet Air Humidification (for use when only Owner executes IAH) PROJECT NAME: Sabine Pass LNG Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: November 11, 2011 CHANGE ORDER NUMBER: CO-0004 DATE OF CHANGE ORDER: July 10, 2012 The Agreement between the Change Order pursuant to Section 6.1C or 6.2DParties listed above is changed as follows: (attach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2015 2016 2017 2018 2019 2020 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $*** $*** $*** $*** $*** $*** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel. 4 Busing Program $*** $*** $*** $*** $*** $*** Rate to be applied to all direct Construction labor hours for the offsite busing program.

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.)

Adjustment to Contract Price. The original Contract Price was $ USD EUR Net change by previously authorized Change Orders (# ) $ USD EUR The Contract Price prior to this Change Order was $ USD EUR The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ USD EUR The new Contract Price including this Change Order will be $ USD EUR Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Execution Copy Phase 1 Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version Copy Phase 1 SCHEDULE D-2 4-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Driftwood LNG Phase 1 OWNER: Driftwood LNG LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing Execution Copy Phase 1 SCHEDULE 4-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Driftwood LNG Phase 1 OWNER: Driftwood LNG LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing Execution Copy Phase 1 SCHEDULE 4-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2019 2020 2021 2022 2023 2024 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Procurement and Construction Agreement (Tellurian Inc. /De/)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Stage 2 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Stage 2 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Unit Rate (in US$) Item Cost Category Year 2013 2014 2015 2016 2017 2018 Remarks 1 Home Office Home Office job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $ *** $ *** $ *** $ *** $ *** $ *** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel. 4 Busing Program $ *** $ *** $ *** $ *** $ *** $ *** Rate to be applied to all direct Construction labor hours for the offsite busing program.

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.)

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price Applicable to Subproject 6(a) will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Contract Price Applicable to Subproject 6(b) will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Provisional Sum will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule for Subproject 6(a) The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria for Subproject 6(a): (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Schedule for Subproject 6(a): Adjustment to Minimum Acceptance Criteria: Criteria for Subproject 6(a): Adjustment to Performance Guarantees: Guarantees for Subproject 6(a): Adjustment to Design Basis: Basis for Subproject 6(a): Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Agreement for Subproject 6(a): Adjustment to dates in Project Schedule for Subproject 6(b) The following dates are modified (list all dates modified; insert N/A if no dates modified): Execution Version Adjustment to other Changed Criteria for Subproject 6(b): (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule for Subproject 6(b): Adjustment to Design Basis for Subproject 6(b): Other adjustments to liability or obligation of Contractor or Owner under the Agreement for Subproject 6(b): Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Stage 4 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing Execution Version SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Stage 4 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Adjustment to Contract Price Applicable to Subproject 6(a): Adjustment to Contract Price Applicable to Subproject 6(b): Contract Price Adjustment: Project Schedule Adjustment for Subproject 6(a): Adjustment to Payment Schedule for Subproject 6(a): Adjustment to Minimum Acceptance Criteria for Subproject 6(a): Adjustment to Performance Guarantees for Subproject 6(a): Adjustment to Guarantee Conditions for Subproject 6(a): Adjustment to Design Basis for Subproject 6(a): Other adjustments to liability or obligations of Contractor under the Agreement for Subproject 6(a): Project Schedule Adjustment for Subproject 6(b): Adjustment to Payment Schedule for Subproject 6(b): Adjustment to Design Basis for Subproject 6(b): Other adjustments to liability or obligations of Contractor under the Agreement for Subproject 6(b): Execution Version This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing Execution Version SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2018 2019 2020 2021 2022 2023 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Escrow Agreement (Sabine Pass Liquefaction, LLC)

Adjustment to Contract Price. The original Contract Price was $ 3,900,000,000 Net change by previously authorized Change Orders (# #0001-0006) $ 68,605,171 The Contract Price prior to this Change Order was $ 3,968,605,171 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) decreased by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased437,849) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ 3,968,167,322 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): : No Change to the Project Schedule. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes. See section 4.a and Exhibit B of this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties' duly authorized representatives. representatives /s/ Xx Xxxxxxxx /s/ X.X. Xxxxxxx Owner Contractor Xx Xxxxxxxx X.X. Xxxxxxx Name Name Vice President, LNG Project Management Senior Vice President Title Title July 24, 2012 July 19, 2012 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL Change Order CO-0008 CHANGE ORDER FORM FOR STAGE 2 Delay in Full Placement of Insurance Program PROJECT NAME: Sabine Pass LNG Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: November 11, 2011 CHANGE ORDER NUMBER: CO-0008 DATE OF CHANGE ORDER: July 27, 2012 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Partners, L.P.

Adjustment to Contract Price. The original Contract Price was $ 7,080,830,000 Net change by previously authorized Change Orders (# 0001-00010) $ 482,968,282 The Contract Price prior to this Change Order was $ 7,563,798,282 The Aggregate Equipment Price will be (increased) (decreased) (unchanged) unchanged by this Change Order in the amount of $ *** The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) changed by this ChangeOrder Change Order in the amount of $ *** The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) unchanged by this ChangeOrder Change Order in the amount of $ The new Contract Price including this Change Order will be $ 7,499,394,953 Adjustment to Aggregate Equipment Price The original Aggregate Equipment Price was $ *** Net change by previously authorized Change Orders (0001-00010) $ *** The Aggregate Equipment Price prior to this Change Order was $ *** The Aggregate Equipment Price will be changed by this Change Order in the amount of $ *** The new Aggregate Equipment Price including this Change Order will be $ *** Adjustment to Aggregate Labor and Skills Price The original Aggregate Labor and Skills Price was $ *** Net change by previously authorized Change Orders (0001-00010) $ *** The Aggregate Labor and Skills Price prior to this Change Order was $ *** The Aggregate Labor and Skills Price will be changed by this Change Order in the amount of $ *** The new Aggregate Labor and Skills Price including this Change Order will be $ *** Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): No impact to Project Schedule. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes. See Exhibit B of this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ MB Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxxx X. Xxxxx Owner Contractor Xx Xxxxxxxx Xxxxx X. Xxxxx Name Name VP LNG Projects Senior Vice President Title Title Aug 14, 2015 07-JULY-2015 Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL *** indicates material has been omitted pursuant to a Confidential Treatment Request filed with the Securities and Exchange Commission. A complete copy of this agreement has been filed separately with the Securities and Exchange Commission. CHANGE ORDER FORM FOR STAGE 2 Reduction of Provisional Sum for Operating Spares, Liquid Condensate Tie-In, Automatic Shut-Off Valve in Condensate Truck Fill Line, Firewater Monitor and Hydrant Coverage Test. PROJECT NAME: Corpus Christi Stage 1 Liquefaction Facility OWNER: Corpus Christi Liquefaction, LLC CONTRACTOR: Bechtel Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: December 6, 2013 CHANGE ORDER NUMBER: CO-00012 DATE OF CHANGE ORDER: August 11, 2015 The Agreement between the Parties listed above is changed as follows: (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2Dattach additional documentation if necessary)

Appears in 1 contract

Samples: Cheniere Energy Inc

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): The Target Bonus Date will be (increased)(decreased)(unchanged) by ( ) Days. The Target Bonus Date as of the date of this Change Order therefore is , 20 . (attach additional documentation if necessary) The Guaranteed Substantial Completion Date will be (increased)(decreased)(unchanged) by ( ) Days. The Guaranteed Substantial Completion Date as of the date of this Change Order therefore is , 20 . (attach additional documentation if necessary) Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order [shall] [shall not] constitute a full and final settlement and accord and satisfaction of all effects of the change reflected as described in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Receiving, Storage and Regasification Terminal CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: OWNER: Sabine Pass LNG, L.P. CONTRACTOR: Xxxxxxx Corporation DATE OF AGREEMENT: December 18, 2004 You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Receiving, Storage and Regasification Terminal CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: OWNER: Sabine Pass LNG, L.P. CONTRACTOR: Xxxxxxx Corporation DATE OF AGREEMENT: December 18, 2004 Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Target Bonus Date Adjustment: Guaranteed Substantial Completion Date Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Unit Rate (in US$) Item Cost Category Year 2004 2005 2006 2007 2008 Remarks 1 Home Office Home Office Man-Hour $ 123 $ 128 $ 134 $ 140 $ 146 Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual Man-Hour $ 104 $ 106 $ 109 $ 118 Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel.

Appears in 1 contract

Samples: Engineering, Procurement and Construction Agreement (Cheniere Energy Inc)

Adjustment to Contract Price. The original Contract Price was $ USD 7,240,314,232 EUR 375,344,119 Net change by previously authorized Change Orders (# CO-008) $ USD 790,755,313 EUR 78,239,751 The Contract Price prior to this Change Order was $ USD 8,031,069,545 EUR 453,583,870 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) unchanged by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ USD 0 EUR 0 The new Contract Price including this Change Order will be $ Adjustment USD 8,031,069,545 EUR 453,583,870 The Aggregate Provisional Sum prior to this Change Order was USD 539,468,636 EUR 0 The Aggregate Provisional Sum will be increased by this Change Order in the amount of USD 0 EUR 0 The new Aggregate Provisional Sum including this Change Order will be USD 539,468,636 EUR 0 Adjustments to dates in Project Schedule Schedule: The following dates are modified (list all dates modified; insert : N/A if no dates modified): Adjustment to other Changed Criteria (insert Criteria: N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: N/A Adjustment to Provisional Sums: N/A Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ XXXXXX /s/ XXXXXX Owner Contractor XXXXXX XXXXXX Name Name XXXXXX XXXXXX Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)Title

Appears in 1 contract

Samples: Tellurian Inc. /De/

Adjustment to Contract Price. The original Contract Price was $ 7,080,830,000 Net change by previously authorized Change Orders (# 0001-00011) $ 418,564,953 The Contract Price prior to this Change Order was $ 7,499,394,953 The Aggregate Equipment Price will be (increased) (decreased) (unchanged) changed by this Change Order in the amount of $ *** The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) changed by this ChangeOrder Change Order in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ *** The new Contract Price including this Change Order will be $ 7,487,110,941 Adjustment to Aggregate Equipment Price The original Aggregate Equipment Price was $ *** Net change by previously authorized Change Orders (0001-00011) $ *** The Aggregate Equipment Price prior to this Change Order was $ *** The Aggregate Equipment Price will be changed by this Change Order in the amount of $ *** The new Aggregate Equipment Price including this Change Order will be $ *** Adjustment to Aggregate Labor and Skills Price The original Aggregate Labor and Skills Price was $ *** Net change by previously authorized Change Orders (0001-00011) $ *** The Aggregate Labor and Skills Price prior to this Change Order was $ *** The Aggregate Labor and Skills Price will be changed by this Change Order in the amount of $ *** The new Aggregate Labor and Skills Price including this Change Order will be $ *** Adjustment to Aggregate Provisional Sum The original Aggregate Provisional Sum was $ 950,561,351 Net change by previously authorized Change Orders (0001-00011) $ (568,568,905 ) The Aggregate Provisional Sum prior to this Change Order was $ 381,992,446 The Aggregate Provisional Sum will be changed by this Change Order in the amount of $ (12,272,221 ) The new Aggregate Provisional Sum including this Change Order will be $ 369,720,225 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): No impact to Project Schedule. Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Yes. See Exhibit E of this Change Order. Adjustment to Minimum Acceptance Criteria: N/A Adjustment to Performance Guarantees: N/A Adjustment to Design Basis: N/A Other adjustments to liability or obligation of Contractor or Owner under the Agreement: N/A Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ /s/ MV Contractor ____ /s/ EL Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. /s/ Xx Xxxxxxxx /s/ Xxxxxxx XxxxxxXxxx Owner Contractor Xx Xxxxxxxx Xxxxxxx XxxxxxXxxx Name Name VP LNG Projects Project Manager Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)9/22/2015 11 AUG 2015

Appears in 1 contract

Samples: Cheniere Energy Inc

Adjustment to Contract Price. The original Contract Price was $ 646,936,000 Net change by previously authorized Change Orders (# #SP/BE-002) $ 1,500,000 The Contract Price prior to this Change Order was $ 648,436,000 The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) changed by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ 0 The new Contract Price including this Change Order will be $ 648,436,000 Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): The Target Bonus Date will be unchanged. The Guaranteed Substantial Completion Date will be unchanged Adjustment to other Changed Criteria (insert Criteria: N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: None Adjustment to Minimum Acceptance Criteria: None Adjustment to Performance Guarantees: None Adjustment to Design Basis: None Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] None This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected as described in this Change Order upon the Changed Criteria and therefore shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)/s/ Xxxxxx Xxxxx /s/ X. Xxxx Xxxxx * Xxxxxx Xxxxx Chairman Contractor

Appears in 1 contract

Samples: Cheniere Energy Inc

Adjustment to Contract Price. The original Contract Price was $ Net change by previously authorized Change Orders (# ) $ The Contract Price prior to this Change Order was $ The Aggregate Equipment Contract Price will be (increased) (decreased) (unchanged) by this Change Order in the amount of $ The Aggregate Labor and Skills Price will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The Aggregate Provisional Sum will be (increased) (decreased) (unchanged) by this ChangeOrder in the amount of $ The new Contract Price including this Change Order will be $ Adjustment to dates in Project Schedule The following dates are modified (list all dates modified; insert N/A if no dates modified): Adjustment to other Changed Criteria (insert N/A if no changes or impact; attach additional documentation if necessary) Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Design Basis: Other adjustments to liability or obligation of Contractor or Owner under the Agreement: Select either A or B: [A] This Change Order shall constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner [B] This Change Order shall not constitute a full and final settlement and accord and satisfaction of all effects of the change reflected in this Change Order upon the Changed Criteria and shall not be deemed to compensate Contractor fully for such change. Initials: ____ Contractor ____ Owner Upon execution of this Change Order by Owner and Contractor, the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Parties’ duly authorized representatives. Owner Contractor Name Name Title Title Date of Signing Date of Signing Execution Version SCHEDULE D-2 UNILATERAL CHANGE ORDER FORM FOR STAGE 2 (for use when only Owner executes the Change Order pursuant to Section 6.1C or 6.2D)) PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER NUMBER: DATE OF CHANGE ORDER: You are hereby directed to make the following additions or modifications to, or deductions from, the Work (attach additional documentation if necessary) Compensation for the changes specified in this Change Order is on a time and materials basis as provided in Section 6.1C and 6.2D of the Agreement. Contractor shall commence with the performance of the change(s) described above [insert date]. This Change Order is signed by Owner’s duly authorized representative. Owner Name Title Date of Signing SCHEDULE D-3 CONTRACTOR’S CHANGE ORDER REQUEST FORM/ CONTRACTOR’S RESPONSE TO A CHANGE ORDER PROPOSED BY OWNER (For use by Contractor (i) pursuant to Section 6.2B of the Agreement, when Contractor requests a proposed Change Order, and (ii) pursuant to Section 6.1A of the Agreement, in responding to a Change Order proposed by Owner) PROJECT NAME: Sabine Pass LNG Stage 3 Liquefaction Facility OWNER: Sabine Pass Liquefaction, LLC CONTRACTOR: Xxxxxxx Oil, Gas and Chemicals, Inc. DATE OF AGREEMENT: CHANGE ORDER REQUEST NUMBER: DATE OF CHANGE ORDER REQUEST: Contractor proposes the following change(s) in the Agreement: (attach additional documentation, if necessary) OR (as applicable) Owner proposes the following change(s) in the Agreement: attach additional documentation, if necessary) Detailed Reasons for Proposed Change(s) (provide detailed reasons for the proposed change, and attach all supporting documentation required under the Agreement) Proposed Adjustments to Agreement (attach additional documentation, if necessary) Contract Price Adjustment: Project Schedule Adjustment: Adjustment to Payment Schedule: Adjustment to Minimum Acceptance Criteria: Adjustment to Performance Guarantees: Adjustment to Guarantee Conditions: Adjustment to Design Basis: Other adjustments to liability or obligations of Contractor under the Agreement: This request for Change Order is signed by Contractor’s duly authorized representative. Contractor Name Title Date of Signing SCHEDULE D-4 UNIT RATES FOR CHANGE ORDERS PERFORMED ON A TIME AND MATERIALS BASIS Item Cost Category Unit Rate (in US$) Remarks Year 2015 2016 2017 2018 2019 2020 1 Home Office Home Office job-hour $*** $*** $*** $*** $*** $*** Includes all home office labor and other direct costs except travel. 2 Field Non-Manual Field Non-Manual job-hour $*** $*** $*** $*** $*** $*** Includes all field non-manual labor, other direct costs including relocation and temporary assignments, except business travel. 3 Construction Direct and Indirect Labor Direct Construction Labor job-hour $*** $*** $*** $*** $*** $*** Includes all construction direct labor and indirect labor, temporary facilities, material and small tools and consumables. Does not include large tools, Construction Equipment, or manual travel. 4 Busing Program $*** $*** $*** $*** $*** $*** Rate to be applied to all direct Construction labor hours for the offsite busing program.

Appears in 1 contract

Samples: Escrow Agreement (Cheniere Energy Partners, L.P.)