Common use of Allocation of Capital Costs Among Contractors Clause in Contracts

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 11 contracts

Samples: water.ca.gov, water.ca.gov, water.ca.gov

AutoNDA by SimpleDocs

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 5 contracts

Samples: Contract, water.ca.gov, water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-1 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to 49 Amended: Amendment 15, 16 receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. TABLE B‌ <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 2 contracts

Samples: water.ca.gov, water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.contractors.‌ TABLE B‌ <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In 40In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.with

Appears in 1 contract

Samples: s3-us-west-2.amazonaws.com

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the 38 Amended: Amendment No. 21 maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-144 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among 43 Amended: Amendment No. 18 44 Amended: Amendment No. 12 contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values 38 Amended: Amendment 23 shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyAgency , pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyAgency . Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: www.vcpublicworks.org

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in 44 Amended: Amendment No. 16 accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-145 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-141 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set 40 Amended: Amendment No. 15 and 16 41 Amended: Amendment No. 16 forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. TABLE B <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be 38 Amended: Amendment No. 21 paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity capacity‌ 45 Amended: Amendment No. 1 46 Amended: Amendment No. 18 provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the 38 Amended: Amendment 17 maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: Contract

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyAgency , pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyAgency . Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. TABLE B‌ <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the 39 Amended: Amendment 16 maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

AutoNDA by SimpleDocs

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-141 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set set‌ 40 Amended: Amendment No. 15 and 16 41 Amended: Amendment No. 16 forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. TABLE B <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to 39 Amended: Amendment 16 receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity 45 Amended: Amendment No. 1 46 Amended: Amendment No. 18 provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the AgencyDistrict. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to 41 Amended: Amendment 17 receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or 38 Amended: Amendment 6, 13, and 15 through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-1 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. > In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency District pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency District as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the AgencyDistrict, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. District.‌ Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.. TABLE B‌ <PLACEHOLDER: TABLE B WITHOUT VALUES SHOWN IN ORIGINAL CONTRACT> <TABLE B PUBLISHED AS TABLES X-0 XXX X-0 XX XXXXXXXX 000>

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years 35 Amended: Amendment 16 shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or 39 Amended: Amendment 14 through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or 38 Amended: Amendment 6, 13, and 15 through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-1 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B B-145 of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: water.ca.gov

Allocation of Capital Costs Among Contractors. In 37In the first step, the total amount of capital costs of each aqueduct reach to be returned to the State shall be allocated among all contractors entitled to delivery of project water from or through the reach by the proportionate use of facilities method of cost allocation and in accordance with (1) and (2) below. The measure of the proportionate use of each contractor of each reach shall be the average of the following two ratios: (i) the ratio of the contractor’s maximum annual entitlement to be delivered from or through the reach to the total of the maximum annual entitlements of all contractors to be delivered from or through the reach from the year in which charges are to be paid through the end of the project repayment period and (ii) the ratio of the capacity provided in the reach for the transport and delivery of project water to the contractor to the total capacity provided in the reach for the transport and delivery of project water to all contractors served from or through the reach from the year in which charges are to be paid through the end of the project repayment period. Allocations of capital costs to the Agency pursuant hereto shall be on the basis of relevant values which will be set forth in Table B of this contract by the State as soon as designs and cost estimates are prepared by it subsequent to receipt of requests from the Agency as to the maximum monthly delivery capability to be provided in each aqueduct reach of the project transportation facilities for the transport and delivery of project water to the Agency, pursuant to Article 17(a): Provided, That these values shall be subject to redetermination by the State in accordance with Article 28: Provided further, That the principles and procedures set forth in this subdivision shall be controlling as to allocations of capital costs to the Agency. Proportionate use of facilities factors for prior years shall not be adjusted by the State in response to changes or transfers of entitlement among contractors unless otherwise agreed by the State and the parties to the transfer and unless there is no impact on past charges or credits of other contractors.

Appears in 1 contract

Samples: www.slocounty.ca.gov