Overtime-Eligible Rest Periods The Employer and the Union agree to rest periods that vary from and supersede the rest periods required by WAC 000-000-000. Employees will be allowed rest periods of fifteen (15) minutes for each one-half (1/2) shift of four (4) or more hours worked at or near the middle of each one-half (1/2) shift of four (4) or more hours. Rest periods do not require relief from duty. Rest periods may not be used for late arrival or early departure from work and rest and meal periods will not be combined.
Alternate Rate of Interest If prior to the commencement of any Interest Period for a Eurodollar Borrowing:
Alternate Duty (A) Where an employee is eligible for disability leave with pay under Rules of the State Personnel System as a result of an injury in the line of duty, and is temporarily unable to perform his normal work duties, the Agency Head or designee shall give due consideration to any request by the employee to be temporarily assigned substitute duties within the employee’s medical restrictions. This shall have no effect on the agency’s ability to make a different assignment based upon current medical opinion.
Rest Period After Overtime (a) When overtime work is necessary, it will, wherever reasonably practicable, be so arranged that employees have at least 10 consecutive hours off duty between the work of successive days or shifts, including overtime.
Rental Rates and Wage Rates for Change Orders As soon as is practical, but prior to the completion of the Construction Preparation Period and in any event prior to the commencement of any Work on the Site, the Contractor shall submit in accordance with the style and format of a specimen to be furnished by the Owner for consideration of the Owner the following: (1) a proposal for rental rates on heavy construction equipment that shall apply in the event Change Order Work is performed, and (2) a proposal for wage rates for the types of project labor that shall apply in the event of the execution of any Change Order Work. Under penalty of false swearing, a principal of the contracting firm shall certify that the proposal for rental rates and proposal for wage rates do not exceed current costs for like services. The Owner will in no event consider a rental rate in excess of eighty percent of the rate set forth in the latest edition of the "Compilation of Nationally Averaged Rental Rates for Construction Equipment" of the Associated Equipment Distributors unless the rates proposed in excess of eighty percent are supported by proof satisfactory to the Owner that the excess rates are reasonable. If the equipment is owned by the Contractor the costs shall be charged at a maximum of eighty percent of market monthly rental rates for the amount of time used. If applicable, transportation costs may be included. The decision of the Owner shall be final, binding and conclusive on all parties. Rental rates shall be payable only for the actual time the equipment is required on the Site.
Determination of Interest Rates for the LIBOR Floating Rate Classes The Interest Rates for the LIBOR Floating Rate Classes for each Interest Accrual Period shall be determined by Xxxxxx Xxx or the Paying Agent on the Index Determination Date in the month following the month in which the Settlement Date occurs and on each Index Determination Date thereafter so long as the LIBOR Floating Rate Classes are outstanding on the basis of LIBOR and the applicable formulae specified in the Prospectus Supplement or the Lower Tier Schedule, as the case may be. For any period during which LIBOR for any LIBOR Floating Rate Class is to be determined on the basis of the “LIBO Method” (as defined in the Prospectus), until such Class is paid in full, Xxxxxx Mae shall at all times retain at least four Reference Banks (as defined in the Prospectus). The Paying Agent and Xxxxxx Xxx shall have no liability or responsibility to any Person for (i) the selection of any Reference Bank for purposes of determining LIBOR or (ii) any inability to retain at least four Reference Banks which is caused by circumstances beyond their reasonable control. In determining LIBOR, any Interest Rate for the LIBOR Floating Rate Classes or any Reserve Interest Rate (as defined in the Prospectus), Xxxxxx Mae or the Paying Agent may conclusively rely and shall be protected in relying upon the rates or offered quotations (whether written, oral or disseminated by means of an electronic information system) provided by the sources specified in the Prospectus. Neither Xxxxxx Xxx nor the Paying Agent shall have any liability or responsibility to any Person for (i) the Paying Agent’s selection of New York City banks for purposes of determining any Reserve Interest Rate or (ii) its inability, following a good-faith reasonable effort, to obtain the applicable rates or quotations or to determine the arithmetic mean of such quotations, all as provided for in the Prospectus.
Calculation methodology No adjustment in the Conversion Price need be made unless the adjustment would require an increase or decrease of at least 1% in the Conversion Price then in effect, provided that any adjustment that would otherwise be required to be made shall be carried forward and taken into account in any subsequent adjustment. Except as stated in this Article VI, the Conversion Rate will not be adjusted for the issuance of Common Stock or any securities convertible into or exchangeable for Common Stock or carrying the right to purchase any of the foregoing. Any adjustments that are made shall be carried forward and taken into account in any subsequent adjustment. All calculations under Article V and Section 6.06 hereof and this Section 6.07 shall be made to the nearest cent or to the nearest 1/10,000th of a share, as the case may be.
Alternate Work Schedules Workweeks and work shifts of different numbers of hours may be established for overtime-eligible employees by the Employer in order to meet business and customer service needs, as long as the alternate work schedules meet federal and state law. When there is a holiday, employees may be required to switch from their alternate work schedules to regular work schedules.
Alternate Option If the dates designated by Developer are acceptable to Connecting Transmission Owner, the Connecting Transmission Owner shall so notify Developer and NYISO within thirty (30) Calendar Days, and shall assume responsibility for the design, procurement and construction of the Connecting Transmission Owner’s Attachment Facilities by the designated dates. If Connecting Transmission Owner subsequently fails to complete Connecting Transmission Owner’s Attachment Facilities by the In-Service Date, to the extent necessary to provide back feed power; or fails to complete System Upgrade Facilities or System Deliverability Upgrades by the Initial Synchronization Date to the extent necessary to allow for Trial Operation at full power output, unless other arrangements are made by the Developer and Connecting Transmission Owner for such Trial Operation; or fails to complete the System Upgrade Facilities and System Deliverability Upgrades by the Commercial Operation Date, as such dates are reflected in Appendix B hereto; Connecting Transmission Owner shall pay Developer liquidated damages in accordance with Article 5.3, Liquidated Damages, provided, however, the dates designated by Developer shall be extended day for day for each day that NYISO refuses to grant clearances to install equipment.
Alternate Billed Calls 1.1 The Parties will engage in settlements of intraLATA intrastate alternate-billed calls (e.g., collect, calling card, and third-party billed calls) originated or authorized by their respective Customers in accordance with an arrangement mutually agreed to by the Parties.