Alternate Technical Concepts (ATC) Sample Clauses

Alternate Technical Concepts (ATC). During the Design-Builders’ proposal development for this Project, WSDOT may receive requests for acceptance of alternate design concepts which may include design elements and improvements within the Port property, and/or associated with access to the Port property that are not covered by this MOU. The Port acknowledges that WSDOT is required both to keep ATC’s confidential until award and to respond with an acceptance or rejection within 8 working days of receipt of an ATC. WSDOT will provide Port with ATC design plans as early as possible and will schedule and meet with Port to review. The Parties will thereafter work cooperatively to concur with and incorporate the desired revisions and process an amended MOU.
AutoNDA by SimpleDocs

Related to Alternate Technical Concepts (ATC)

  • New Technology When new or updated technology is introduced into a workplace, it will be the responsibility of the employer to provide appropriate and, if necessary, ongoing training to the employees directly affected. Such training will include any health and safety implications or information that will enable employees to operate the equipment without discomfort and will help maintain their general well-being.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.

  • Technical Consultations 1. A Party may initiate technical consultations with another Party through the respective contact points with the aim of resolving any matter arising under this Chapter.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Intellectual Property Rights in Construction Documents, Drawings, and Models The drawings, Specifications and other documents prepared by the Design Professional pursuant to this Contract (including, without limitation, the Construction Documents), are the property of the Owner, whether or not the Project for which they are made commences or completes construction. Neither the Contractor nor any Subcontractor or material or equipment supplier shall own or claim a copyright in such drawings, Specifications, and other similar or related documents; Owner shall retain all common law, statutory, and other intellectual property rights with respect thereto. The Contractor must deliver remaining copies of such documents to the Owner upon request or upon completion of the Work, except that the Contractor may keep one copy of such documents for its files. The Contractor shall only use such drawings, Specifications and other documents for this Project. Neither the Contractor nor any Subcontractor or material or equipment supplier may use such drawings, Specifications, and other documents on other projects without the specific written consent of the Owner. All models are the property of the Owner.

  • Technical Data For the purpose of this Agreement, "TECHNICAL DATA" shall mean all information of the Company in written, graphic or tangible form relating to any and all products which are developed, formulated and/or manufactured by the Company, as such information exists as of the Effective Date or is developed by the Company during the term hereof.

  • TECHNICAL TASKS Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

Time is Money Join Law Insider Premium to draft better contracts faster.