Common use of AND LIQUIDATED DAMAGES Clause in Contracts

AND LIQUIDATED DAMAGES. (5-21-13) 108 SP1 G14 I The Contractor shall complete the work required of installing each new inductive loop after the removal of each existing loop by the milling, patching or resurfacing operations and shall place and maintain traffic on same. The date of availability for this intermediate contract time for each inductive loop installation will be the date when the Contractor elects to disturb the existing inductive loop. The completion date for this intermediate contract time for each inductive loop installation will be the date which is seven (7) consecutive calendar days after the date of availability. The liquidated damages are Five Hundred Dollars ($ 500.00) per calendar day.

Appears in 2 contracts

Samples: Roadway Contract, Roadway Contract

AutoNDA by SimpleDocs

AND LIQUIDATED DAMAGES. (5-21-13) 108 SP1 G14 I The Contractor shall complete the work required of installing each new inductive loop after the removal of each existing loop by the milling, patching or resurfacing operations and shall place and maintain traffic on same. The date of availability for this intermediate contract time for each inductive loop installation will be the date when the Contractor elects to disturb the existing inductive loop. The completion date for this intermediate contract time for each inductive loop installation will be the date which is seven (7) consecutive calendar days after the date of availability. The liquidated damages are One Thousand Five Hundred Dollars ($ 500.001,500.00) per calendar day.

Appears in 1 contract

Samples: Roadway Contract

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!