Appurtenant Facilities. Those facilities, downstream from the wellhead, to and including the delivery point, that are necessary to make the products acceptable for delivery including, but not limited to, compression, transportation, gathering, separation, treating and certain processing facilities.
Appurtenant Facilities. The proposed XX Xxxxxxxxxx Lock and Dam Project would have an average annual generation of 8 gigawatt- hours. Applicant Contact: Xxxxx Xxxxxxxxxxx, Free Flow Power Corporation, 00 Xxxxxxxxxx Xxxxxx, Xxxxxxxxxx, XX 00000. FERC Contact: Xxxxxxx Xxxxxx, 202– 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice.
Appurtenant Facilities. Xxxx e facilit ies, downstr eam from the wellhead, to and including the delivery point, that are necess ary to make the products acceptable for delivery including, but not limited to, compress ion, trans portation, gathering, s eparation, treat ing and certain processing facilities .
Appurtenant Facilities. Tenant shall, at all times during the Term, and at its sole expense, maintain and repair, making replacements as reasonably necessary, all of the Appurtenant Facilities such that the same are at all times in good working order, repair and condition and in compliance with any and all applicable Laws. The foregoing obligations of Tenant shall also include the obligation to keep the Appurtenant Facilities reasonably free of refuse, and any other obstructions (including those caused by weather conditions), and the obligation to keep all Parking Areas, roadways, walkways, sidewalks and similar Appurtenant Facilities well lit during such hours as Tenant requires and to maintain, upkeep and replace, as appropriate all landscaping in or within the Premises. For the purposes hereof, “Appurtenant Facilities” shall include, without limitation, the following: (a) all parking areas, xxxxxx, xxxxxxxxx, xxxxxxxx, service roads, sidewalks, entrances, exits, walkways, public sidewalks, access ramps of all kinds (whether for regular pedestrian use, for use by handicapped or for use in delivery of merchandise, and including the paving or other surface thereof, and all striping) required for first class vehicular and pedestrian access to the Premises from all entrances and exits to and from the Land and the Building; (b) all facilities and equipment required for provision of electricity, water, sewer, gas and telecommunication and other utilities serving the Premises; (c) sufficient loading and trash compacting areas; (d) lighting facilities (of all types and wherever located) for illumination of all facilities described in clause (a) above in a first class manner; (e) all surface and subsurface drainage facilities and equipment; (f) all traffic control signals and signs (including directional signs at all entrance and exits to the Land) required by any site plan approval or other permit or approval related to the Land; (g) all fencing, retaining walls and the like serving the Land or required by the permits governing the Land; and (h) the plantings and other landscaped areas required by applicable Law or as otherwise necessitated by any permits or approvals or private covenants related to the Land.
Appurtenant Facilities. In addition to the Premises, Tenant shall ---------------------- have the right in common with all other lessees and occupants of the Building to use the Appurtenant Facilities located in the Building as described in Exhibit F annexed hereto, subject to payment by Tenant as Additional Rent of Landlord's standard charge for such use.
Appurtenant Facilities. These facilities bifurcate wildlife habitats and can function as physical barriers to terrestrial wildlife movement. Wildlife may become entrapped and drown in Project waterways. Adverse barrier effects of the Project are greatest on species with limited dispersal ability and patchy distribution (e.g., small mammals and amphibians). Project impoundments have inundated historic wetland habitat and can potentially limit amphibian breeding success through a lack of structural habitat diversity, operating water level fluctuations, and entrainments. Project transmission lines may pose a collision and/or electrocution hazard to migratory birds.
Appurtenant Facilities. The Pit 4 development consists of: (1) The 105-acre Pit 4 Reservoir, with a gross storage capacity of 1,970 acre feet;
Appurtenant Facilities. The Pit 5 development consists of: (1) The 32-acre Pit 5 Reservoir, with a gross storage capacity of 314 acre feet; (2) the Pit 5 Dam, with a concrete gravity overflow structure 340 feet in length and a maximum height of 67 feet; (3) the 19-foot-diameter Tunnel No. 1; (4) the 48-acre Pit 5 Tunnel Reservoir, with a gross storage capacity of 1,044 acre feet;
Appurtenant Facilities. The Premises include all existing improvements situated on the land described in Exhibit “A” and belonging to Lessor. Improvements hereafter constructed shall not be used for residential purposes unless otherwise agreed between Lessor and Lessee in writing.
Appurtenant Facilities. The proposed project would have a rated capacity of 795 kW. The applicant estimates that the total average annual generation would be 3,570,000 kilowatthours.