Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “the Excess ANG”). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production of the Crude Oil from the Contract Area, and whether the Contractor intends to so exploit the Excess ANG. 21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s policy, or elsewhere, the proposed plans for such exploitation. 21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2. 21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any cost/charge. 21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4: (a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities; (b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee; (c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee); (d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and (e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production. 21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort. 21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 8 contracts
Samples: Production Sharing Agreement, Production Sharing Agreement, Production Sharing Contract (Geoglobal Resources Inc)
Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “"the Excess ANG”"). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production of the Crude Oil from the Contract Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s 's policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2.
21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4:
(a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee;
(c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee);
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 4 contracts
Samples: Production Sharing Contract (Geoglobal Resources Inc.), Production Sharing Contract (Geoglobal Resources Inc.), Production Sharing Contract (Geoglobal Resources Inc.)
Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “"the Excess ANG”"). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production of the Crude Oil from the Contract Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s 's policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2.
21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4:
(a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee;
(c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee);
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-off- take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 3 contracts
Samples: Production Sharing Contract, Production Sharing Contract, Production Sharing Contract
Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “the Excess ANG”). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production of the Crude Oil from the Contract Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2.
21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4:
(a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee;
(c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee);
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 2 contracts
Samples: Model Production Sharing Contract, Production Sharing Contract
Associated Natural Gas (ANG). 21.4.1 a) In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 1028, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 31.2 (such excess being hereinafter referred to as the “the Excess ANG”). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract Agreement along with the Commercial Production of the Crude Oil from the Contract Agreement Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 b) Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjectedre-injected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 c) If the Contractor wishes to exploit the Excess ANG, subject to Article 21.131.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government PRDC in accordance with in Article 21.4.231.4 b) above.
21.4.4 d) Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3paragraph c)n above, the Government PRDS shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 e) If the Government PRDS elects to take the Excess ANG as provided in Article 21.4.4:31.4 d):-
(ai) the Contractor shall deliver such Excess ANG to the Government PRDS (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(bii) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government PRDS or its nominee;
(c) , the cost nature and construction of all such facilities installed pursuant being subject to paragraph (b) above shall be borne acceptance by the Government (or its nominee)PRDS;
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 1 contract
Samples: Model Petroleum Resources Agreement
Associated Natural Gas (ANG). 21.4.1 a) In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 1028, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 31.2 (such excess being hereinafter referred to as the “the Excess ANG”). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract Agreement along with the Commercial Production of the Crude Oil from the Contract Agreement Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 b) Based on the principle of full utilisation and minimum flaring of ANG, a proposed field development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjectedre-injected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 c) If the Contractor wishes to exploit the Excess ANG, subject to Article 21.131.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government PRDC in accordance with in Article 21.4.231.4 b) above.
21.4.4 d) Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3paragraph c)n above, the Government PRDC shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 e) If the Government PRDC elects to take the Excess ANG as provided in Article 21.4.4:31.4 d):-
(ai) the Contractor shall deliver such Excess ANG to the Government PRDC (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(bii) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government PRDC or its nominee;
(c) , the cost nature and construction of all such facilities installed pursuant being subject to paragraph (b) above shall be borne acceptance by the Government (or its nominee)PRDC;
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 1 contract
Samples: Model Petroleum Resources Agreement
Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “"the Excess ANG”"). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production commercial production of the Crude Oil from the Contract Development Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan Development Plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s 's policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2.
21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any costcosts/charge.
21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4:
(a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee;
(c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee);
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 1 contract
Samples: Production Sharing Contract
Associated Natural Gas (ANG). 21.4.1 In the event that a Discovery of Crude Oil contains ANG, the Contractor shall declare in the proposal for the declaration of the said Discovery as a Commercial Discovery as specified in Article 10, whether (and by what amount) the estimated production of ANG is anticipated to exceed the quantities of ANG which will be used in accordance with Article 21.2 (such excess being hereinafter referred to as “"the Excess ANG”"). In such an event the Contractor shall indicate whether, on the basis of the available data and information, it has reasonable grounds for believing that the Excess ANG could be commercially exploited in accordance with the terms of this Contract along with the Commercial Production of the Crude Oil from the Contract Area, and whether the Contractor intends to so exploit the Excess ANG.
21.4.2 Based on the principle of full utilisation and minimum flaring of ANG, a proposed development plan for an Oil Discovery shall, to the extent practicable, include a plan for utilisation of the ANG including estimated quantities to be flared, reinjected, and to be used for Petroleum Operations; and, if the Contractor proposes to commercially exploit the Excess ANG for sale in the domestic market in accordance with Government’s 's policy, or elsewhere, the proposed plans for such exploitation.
21.4.3 If the Contractor wishes to exploit the Excess ANG, subject to Article 21.1, the Contractor shall be free to explore markets for the commercial exploitation of the said Excess ANG and submit its proposals for such exploitation to the Government in accordance with Article 21.4.2.
21.4.4 Where the Contractor is of the view that the Excess ANG cannot be commercially exploited and chooses not to exploit the said Excess ANG, or is unable to find a market for the Excess ANG pursuant to Article 21.4.3, the Government shall be entitled to take and utilise such Excess ANG free of any cost/charge.
21.4.5 If the Government elects to take the Excess ANG as provided in Article 21.4.4:
(a) the Contractor shall deliver such Excess ANG to the Government (or its nominee) free of any cost/charge, at the downstream flange of the Gas/Oil separation facilities;
(b) the Contractor shall, based on sound petroleum engineering practices, install such facilities as would facilitate, insofar as practicable, uninterrupted delivery of such Excess ANG to the Government or its nominee;
(c) the cost of all facilities installed pursuant to paragraph (b) above shall be borne by the Government (or its nominee);
(d) the Government or its nominee shall bear all costs including gathering, treating, processing and transporting costs beyond the downstream flange of the Gas/Oil separation facilities; and
(e) the delivery of such Excess ANG shall be subject to procedures to be agreed between the Government or its nominee and the Contractor prior to such delivery, such procedures to include matters relating to timing of off-take of such Excess ANG. Parties shall endeavour that such procedures do not restrict Oil production.
21.4.6 The Excess ANG which is not commercially exploited by the Contractor, or taken by the Government or its nominee pursuant to this Article 21, shall be returned to the subsurface structure or flared or otherwise disposed off as approved by the bythe Government in the context of the Development Plan, provided that flaring will be resorted to only for small quantities and as a last resort.
21.4.7 As soon as practicable after the submission of the proposed development proposeddevelopment plan, the Contractor and the Government or its nominee shall meet to discuss the sale and/or disposal of any ANG discovered with a view to giving effect to the provisions of this Article 21 in a timely manner.
Appears in 1 contract
Samples: Production Sharing Contract