Back-Up Power System Sample Clauses

Back-Up Power System. 40.01. Landlord shall maintain the Back-Up Power System in compliance with Legal Requirements and otherwise in working order in accordance with the performance specifications set forth in the Maintenance Schedule or better. The Back-Up Power System shall include, but not be limited to, one or more diesel generators and chiller units, including but not limited to the one (1) Caterpillar 1500 KW diesel stand-by generator currently located within the Basement (herein called the “Back-Up Power System”). 40.02. Landlord agrees that, subject to all applicable Legal Requirements, Tenant, at Tenant’s sole cost and expense, shall have the right to install on any one or more portions of the Premises, and thereafter upgrade, replace, maintain, repair, and operate one or more battery-powered uninterruptible power systems, including, without limitation, the two (2) MGE 225 KVA single module UPS systems currently located on the 12th floor of the Building (each herein called a “UPS Battery System”), in a portion or portions of the Premises to be designated by Tenant (each such portion herein called a “UPS Area”); provided that in connection with such installation of the UPS Battery System Tenant hereby covenants and agrees that: (i) such installation shall be performed in accordance with all applicable Legal Requirements and with all of the applicable provisions of this lease; (ii) Tenant shall promptly repair any damage caused to the UPS Area by reason of such installation, including any repairs, restoration, maintenance, renewal or replacement thereof necessitated by or in any way caused by or relating to such installations except to the extent such damage has resulted from the negligence or willful misconduct of Landlord, its agents, contractors or employees; and (iii) Tenant shall pay as and when due, and shall be solely responsible for, any and all taxes, fees, license charges or other amounts imposed upon Tenant, Landlord or the Real Property, if any, in connection with the UPS Battery System. 40.03. Landlord hereby acknowledges and consents to the existing connection of certain Tenant’s systems to Landlord’s emergency generator system for the Building (such emergency generator system being referred to herein collectively as the “Emergency Generator System”). Further, Landlord shall not unreasonably withhold, condition, or delay Landlord’s consent to an Alteration consisting of the connecting of additional Tenant’s systems, or alteration of Tenant’s existing connec...
Back-Up Power System. 40.01. Landlord agrees that, subject to all applicable Legal Requirements, Tenant, at Tenant’s sole cost and expense, shall have the right to install on any one or more portions of the Building (together with any shaftways, closets and conduits of the Building) and thereafter maintain, repair, and operate: (i) one or more battery-powered uninterruptible power systems, including, without limitation, the Liebert UPS currently located on the 5th floor of the Building (each herein called a “UPS Battery System”), in a portion or portions of the Premises to be designated by Tenant (each such portion herein called a “UPS Area”) and (ii) one or more diesel generators and chiller units, including, without limitation, the two (2) Caterpillar 1500 KW diesel generators currently located on the 5th floor of the Building, three (3) fuel tanks currently located in the loading dock (herein collectively called the “Diesel Generator”), and the 270 ton and 450 ton train chillers located on the 5th floor (the “Chillers”), in a portion or portions of the Premises designated by Tenant (herein called the “Generator Area”, the UPS Battery System, the
Back-Up Power System. 98 Back-Up Power System Area...............................................................................98
Back-Up Power System. 40.01. Landlord agrees that, subject to all applicable Legal Requirements, Tenant, at Tenant’s sole cost and expense, shall have the right to install on any one or more portions of the Premises, including any Retained Common Areas (together with any shaftways, closets and conduits of the Building), and thereafter maintain, repair, and operate: (i) one or more battery-powered uninterruptible power systems, including, without limitation, the Liebert UPS currently located within the Fifth Floor Mechanical Rooms (each herein called a “UPS Battery System”), in a portion or portions of the Premises to be designated by Tenant (each such portion herein called a “UPS Area”) and (ii) one or more diesel generators and chiller units, including the one (1) Caterpillar 1500 KW diesel stand-by generator currently located within the Fifth Floor Mechanical Rooms (herein collectively called the “Diesel Generator”), in a portion or portions of the Premises designated by Tenant (herein called the “Generator Area”, the UPS Battery System and the Diesel Generator are sometimes herein collectively called the “Back-Up Power System”; the UPS Area and the Generator Area are sometimes herein collectively called the “Back-Up Power System Area”); provided that in connection with such installation of the Back-Up Power System Tenant hereby covenants and agrees that:

Related to Back-Up Power System

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Onvoy’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.