Boarding bridges Sample Clauses

Boarding bridges. Guarantee The start of provisioning the first boarding bridge within 2 minutes from AIBT (aircraft stop at the stop line or within the limit distance from it) or only after the handling agent has given his signal to provide a boarding bridge, whichever occurs later. The operator of the boarding bridge is obliged to be present at the boarding bridge at the CIBT time. The availability of arrival corridors upon arrival of aircrafts (arrival door) will be ensured prior to arrival of the first passengers by employees of Prague Airport BEK. The start of the removal of the first boarding bridge at the departure is guaranteed within 5 minutes from the submission of the request for the removal to CDP dispatching. In case it is necessary to provide the boarding bridge to the airplane again, Prague Airport shall start this activity within 5 minutes from the submission of the request for provision. However, the current operating requirement may be stalled due to capacity reasons at the CDP dispatching in case that the current time of request submission is smaller than TSAT - 10 minutes for the required departure. The boarding bridge operator will not be needlessly blocked on a single flight for more than 10 minutes of their arrival. If the aircraft is towed, the boarding bridge must be prepared / removed within 10 minutes of handling over a request to CDP dispatching for preparing or removing a bridge. Boarding bridges must always be prepared with a functional power unit of 400 Hz and a functional air-conditioning unit (if required by the crew and if included in the relevant boarding bridge). The boarding bridges shall be cleaned in compliance with the contractually established parameters of cleaning. Checking procedure The Carrier or Handling Partner will hand over information on any failure to observe the boarding bridge standard of service by phoning the CDP dispatching (I. 7000) or, if ground power is involved, TPT dispatching (l. 6000) as early as possible; however, within 24 hours from the aircraft ALDT or ATOT. CDP and TPT dispatching must keep records of each failure to observe the standard of service. In the case of blocking the boarding bridge operator for more than 15 minutes, i.e. from receiving the Carrier’s request, the CDP dispatching will inform the Carrier within 60 minutes from ATOT about this matter on the telephone number specified by the Carrier. Specification of the service Providing boarding bridges includes their availability in the required nu...
AutoNDA by SimpleDocs

Related to Boarding bridges

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Red Hat Directory Server Use Cases Subscription Services are provided for Red Hat Directory Server only when used for its supported Use Case in accordance with the terms of this Exhibit and Table 3.1 below.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Standards for Network Elements 1.8.1 BellSouth shall comply with the requirements set forth in the technical references, as well as any performance or other requirements identified in this Agreement, to the extent that they are consistent with the greater of BellSouth’s actual performance or applicable industry standards.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services.

  • Procurement of Small Works Works estimated to cost less than $100,000 equivalent per contract, up to an aggregate amount not to exceed $1,150,000 equivalent, may be procured under lump-sum, fixed-price contracts awarded on the basis of quotations obtained from three (3) qualified domestic contractors in response to a written invitation. The invitation shall include a detailed description of the works, including basic specifications, the required completion date, a basic form of agreement acceptable to the Association, and relevant drawings, where applicable. The award shall be made to the contractor who offers the lowest price quotation for the required work, and who has the experience and resources to complete the contract successfully. Part D: Review by the Association of Procurement Decisions

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!