Common use of Breach of Contract Claims Clause in Contracts

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 11 contracts

Samples: Contract Agreement, Contractor Agreement, Contractor Agreement

AutoNDA by SimpleDocs

Breach of Contract Claims. 12.19.1 (a) To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University UTMB and Contractor Seller to attempt to resolve any claim for breach of contract made by ContractorSeller: 12.19.1.1 Contractor1. Seller’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor Seller will submit written notice, as required by subchapter B of Chapter 2260, to University UTMB in accordance with the notice provisions in this Agreement. ContractorSeller's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract Agreement provision that University UTMB allegedly breached, the amount of damages Contractor Seller seeks, and the method used to calculate the damages. Compliance by Contractor Seller with subchapter B of Chapter 2260 is a required prerequisite to ContractorSeller's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of UniversityUTMB, or another officer of University UTMB as may be designated from time to time by University UTMB by written notice to Contractor Seller in accordance with the notice provisions in this Agreement, will examine ContractorSeller's claim and any counterclaim and negotiate with Contractor Seller in an effort to resolve the claims. 12.19.1.2 2. If the parties are unable to resolve their disputes under Section 12.19.1.1subsection (A)(1), the contested case process provided in subchapter C of Chapter 2260 is ContractorSeller’s sole and exclusive process for seeking a remedy for any and all of ContractorSeller's claims for breach of this Agreement by UniversityUTMB. 12.19.1.3 3. Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Legislature under Chapter 107,

Appears in 3 contracts

Samples: Purchase Order, General Terms and Conditions, Purchase Order Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Legislature under Chapter 107,

Appears in 3 contracts

Samples: Contractor Agreement, Contract Agreement, Contract Agreement

Breach of Contract Claims. 12.19.1 50.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 50.1.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another the other officer of University as may be designated from time to time by University by written notice thereof to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 50.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.150.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 50.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 2 contracts

Samples: Custodial Services Agreement, Custodial Services Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described hereinin this Section, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 . Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 . If the parties are unable to resolve their disputes under Section 12.19.1.19.18.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 . Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,107 of the Texas Civil Practices and Remedies Code. Neither the execution of this Agreement by University nor any other conduct, action or inaction of any representative of University relating to this Agreement constitutes or is intended to constitute a waiver of University's or the state's sovereign immunity to suit. University has not waived its right to seek redress in the courts. The submission, processing and resolution of Contractor’s claim is governed by the published rules adopted by the Texas Attorney General pursuant to Chapter 2260, as currently effective, hereafter enacted or subsequently amended. Except as provided in Chapter 2251, Texas Government Code, neither the occurrence of an event giving rise to a breach of contract claim nor the pendency of a claim constitute grounds for the suspension of performance by Contractor, in whole or in part. Any periods set forth in this Agreement for notice and cure of defaults are not waived. Payment of Debt or Delinquency to the State. Pursuant to Sections 2107.008 and 2252.903, Texas Government Code, any payments owing to Contractor under this Agreement may be applied directly toward any debt or delinquency that Contractor owes the State of Texas or any agency of the State of Texas regardless of when it arises, until the debt or delinquency is paid in full.

Appears in 2 contracts

Samples: Food Service Agreement, Food Service Agreement

Breach of Contract Claims. 12.19.1 49.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 49.1.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another the other officer of University as may be designated from time to time by University by written notice thereof to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 49.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.149.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 49.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Custodial Services Agreement

Breach of Contract Claims. 12.19.1 14.9.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 (a) Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another the other officer of University as may be designated from time to time by University by written notice thereof to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 (b) If the parties are unable to resolve their disputes under Section 12.19.1.113.9.1(a), the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 (c) Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Project Management Temporary Staffing Services Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor The Parties to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 Contractor’s claims for breach of this Agreement that the parties Parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 If the parties Parties are unable to resolve their disputes under Section 12.19.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,Chapter

Appears in 1 contract

Samples: Mobile Application Design Services Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 12.19.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 12.19.2 If the parties are unable to resolve their disputes under Section 12.19.1.112.19.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 12.19.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,Chapter

Appears in 1 contract

Samples: Contractor Agreement

Breach of Contract Claims. 12.19.1 a. To the extent that Chapter 2260, Texas 2260,Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will shall be used, as further described herein, by University Owner and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 i. Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will shall be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will shall submit written notice, as required by subchapter B of Chapter 2260, to University Owner in accordance with the notice provisions in this AgreementContract. Contractor's notice will shall specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract Agreement provision that University Owner allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business Chief Business Officer of Owner, or such other officer of University, or another officer of University Owner as may be designated from time to time by University Owner by written notice thereof to Contractor in accordance with the notice provisions in this AgreementContract, will shall examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the such claims. 12.19.1.2 ii. If the parties are unable to resolve their disputes under Section 12.19.1.1subparagraph (a.) of this section, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by UniversityOwner. 12.19.1.3 iii. Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Legislature under Chapter 107,107 of the Texas Civil Practices and Remedies Code. The parties hereto specifically agree that (1) neither the execution of this Agreement by Owner nor any other conduct, action or inaction of any representative of Owner relating to this Agreement constitutes or is intended to constitute a waiver of Owner's or the state's sovereign immunity to suit and (2) Owner has not waived its right to seek redress in the courts. b. The submission, processing and resolution of Contractor’s claim is governed by the published rules adopted by the Texas Attorney General pursuant to Chapter 2260, as currently effective, hereafter enacted or subsequently amended. Owner and Contractor agree that any periods set forth in this Agreement for notice and cure of defaults are not waived.

Appears in 1 contract

Samples: Construction Contract

Breach of Contract Claims. 12.19.1 a. To the extent that Chapter 2260, Texas 2260,Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will shall be used, as further described herein, by University Owner and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 i. Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will shall be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will shall submit written notice, as required by subchapter B of Chapter 2260, to University Owner in accordance with the notice provisions in this AgreementContract. Contractor's notice will shall specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract Agreement provision that University Owner allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business Chief Business Officer of Owner, or such other officer of University, or another officer of University Owner as may be designated from time to time by University Owner by written notice thereof to Contractor in accordance with the notice provisions in this AgreementContract, will shall examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the such claims. 12.19.1.2 ii. If the parties are unable to resolve their disputes under Section 12.19.1.1subparagraph (a.) of this section, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by UniversityOwner. 12.19.1.3 iii. Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,107 of the Texas Civil Practices and Remedies Code. The parties hereto specifically agree that (1) neither the execution of this Agreement by Owner nor any other conduct, action or inaction of any representative of Owner relating to this Agreement constitutes or is intended to constitute a waiver of Owner's or the state's sovereign immunity to suit and (2) Owner has not waived its right to seek redress in the courts. b. The submission, processing and resolution of Contractor’s claim is governed by the published rules adopted by the Texas Attorney General pursuant to Chapter 2260, as currently effective, hereafter enacted or subsequently amended. Owner and Contractor agree that any periods set forth in this Agreement for notice and cure of defaults are not waived.

Appears in 1 contract

Samples: Construction Contract

AutoNDA by SimpleDocs

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described hereinin this Section, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor:. 12.19.1.1 9.18.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 9.18.2 If the parties are unable to resolve their disputes under Section 12.19.1.19.18.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 9.18.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,107 of the Texas Civil Practices and Remedies Code. Neither the execution of this Agreement by University nor any other conduct, action or inaction of any representative of University relating to this Agreement constitutes or is intended to constitute a waiver of University's or the state's sovereign immunity to suit. University has not waived its right to seek redress in the courts. 9.18.4 The submission, processing and resolution of Contractor’s claim is governed by the published rules adopted by the Texas Attorney General pursuant to Chapter 2260, as currently effective, hereafter enacted or subsequently amended. 9.18.5 Except as provided in Chapter 2251, Texas Government Code, neither the occurrence of an event giving rise to a breach of contract claim nor the pendency of a claim constitute grounds for the suspension of performance by Contractor, in whole or in part. Any periods set forth in this Agreement for notice and cure of defaults are not waived.

Appears in 1 contract

Samples: Food Service Agreement

Breach of Contract Claims. 12.19.1 (a) To the extent that Texas Government Code Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement the Contract and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University XXXXX UNIVERSITY and Contractor Supplier to attempt to resolve any claim for breach of contract made by ContractorSupplier: 12.19.1.1 Contractor1. Supplier’s claims for breach of this Agreement the Contract that the parties cannot resolve pursuant to other provisions of this Agreement the Contract or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor Supplier will submit written notice, as required by subchapter B of Chapter 2260, to University XXXXX UNIVERSITY in accordance with the notice provisions in this Agreementherein. ContractorSupplier's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the Supplier’s claim, the specific contract provision that University which XXXXX UNIVERSITY allegedly breached, the amount of damages Contractor Supplier seeks, and the method used to calculate the such damages. Compliance by Contractor Supplier with subchapter B of Chapter 2260 is a required prerequisite to ContractorSupplier's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of UniversityXXXXX UNIVERSITY, or another officer of University XXXXX UNIVERSITY as may be designated from time to time by University XXXXX UNIVERSITY by written notice to Contractor in accordance with the notice provisions in this AgreementSupplier, will examine ContractorSupplier's claim and any counterclaim and negotiate with Contractor Supplier in an effort to resolve the such claims. 12.19.1.2 2. If the parties are unable to resolve their disputes under Section 12.19.1.1a dispute by the manner provided above, the contested case process provided in subchapter C of Chapter 2260 is ContractorSupplier’s sole and exclusive process for seeking a remedy for any and all of ContractorSupplier's claims for breach of this Agreement the Contract by UniversityXXXXX UNIVERSITY. 12.19.1.3 3. Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Texas Legislature under Texas Civil Practices and Remedies Code Chapter 107,. The parties hereto specifically agree that (i) neither the execution of the Contract by XXXXX UNIVERSITY nor any other conduct, action or inaction of any representative of XXXXX UNIVERSITY relating to the Contract constitutes or is intended to constitute a waiver of XXXXX UNIVERSITY's or the State's sovereign immunity to suit, and (ii) XXXXX UNIVERSITY has not waived its right to seek redress in the courts. (a) The submission, processing and resolution of Supplier’s claim is governed by the published rules adopted by the Texas Attorney General pursuant to Chapter 2260, as currently effective, thereafter enacted, or subsequently amended. (b) XXXXX UNIVERSITY and Supplier agree that any periods set forth in the Contract for notice and cure of defaults are not waived.

Appears in 1 contract

Samples: General Terms and Conditions

Breach of Contract Claims. 12.19.1 50.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 50.1.1 Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another the other officer of University as may be designated from time to time by University by written notice thereof to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 50.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.150.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 50.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx sue from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Custodial Services Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University A&M System and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 13.1. Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University A&M System in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University A&M System allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of UniversityA&M System, or another officer of University A&M System as may be designated from time to time by University A&M System by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 If the parties are unable to resolve their disputes under Section 12.19.1.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Services Agreement

Breach of Contract Claims. 12.19.1 To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Laws, the dispute resolution process provided for in Chapter 2260 will be used, as further described hereinin this Section, by University and Contractor to attempt to resolve any claim for breach of contract made by Contractor: 12.19.1.1 . Contractor’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor will submit written notice, as required by subchapter B of Chapter 2260, to University in accordance with the notice provisions in this Agreement. Contractor's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract provision that University allegedly breached, the amount of damages Contractor seeks, and the method used to calculate the damages. Compliance by Contractor with subchapter B of Chapter 2260 is a required prerequisite to Contractor's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer Chief Business Officer of University, or another officer of University as may be designated from time to time by University by written notice to Contractor in accordance with the notice provisions in this Agreement, will examine Contractor's claim and any counterclaim and negotiate with Contractor in an effort to resolve the claims. 12.19.1.2 . If the parties are unable to resolve their disputes under Section 12.19.1.19.18.1, the contested case process provided in subchapter C of Chapter 2260 is Contractor’s sole and exclusive process for seeking a remedy for any and all of Contractor's claims for breach of this Agreement by University. 12.19.1.3 Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Food Service Agreement

Breach of Contract Claims. 12.19.1 A. To the extent that Chapter 2260, Texas Government Code, as it may be amended from time to time ("Chapter 2260"), is applicable to this Agreement and is not preempted by other Applicable Lawsapplicable law, the dispute resolution process provided for in Chapter 2260 will be used, as further described herein, by University UTMB and Contractor Seller to attempt to resolve any claim for breach of contract made by ContractorSeller: 12.19.1.1 Contractor1. Seller’s claims for breach of this Agreement that the parties cannot resolve pursuant to other provisions of this Agreement or in the ordinary course of business will be submitted to the negotiation process provided in subchapter B of Chapter 2260. To initiate the process, Contractor Seller will submit written notice, as required by subchapter B of Chapter 2260, to University UTMB in accordance with the notice provisions in this Agreement. ContractorSeller's notice will specifically state that the provisions of subchapter B of Chapter 2260 are being invoked, the date and nature of the event giving rise to the claim, the specific contract Agreement provision that University UTMB allegedly breached, the amount of damages Contractor Seller seeks, and the method used to calculate the damages. Compliance by Contractor Seller with subchapter B of Chapter 2260 is a required prerequisite to ContractorSeller's filing of a contested case proceeding under subchapter C of Chapter 2260. The chief business officer of UniversityUTMB, or another officer of University UTMB as may be designated from time to time by University UTMB by written notice to Contractor Seller in accordance with the notice provisions in this Agreement, will examine ContractorSeller's claim and any counterclaim and negotiate with Contractor Seller in an effort to resolve the claims. 12.19.1.2 2. If the parties are unable to resolve their disputes under Section 12.19.1.1subsection (A)(1), the contested case process provided in subchapter C of Chapter 2260 is ContractorSeller’s sole and exclusive process for seeking a remedy for any and all of ContractorSeller's claims for breach of this Agreement by UniversityUTMB. 12.19.1.3 3. Compliance with the contested case process provided in subchapter C of Chapter 2260 is a required prerequisite to seeking consent to xxx from the Legislature under Chapter 107,

Appears in 1 contract

Samples: Equipment Lease & Support Services Agreement