Common use of Building Permit Issuance Clause in Contracts

Building Permit Issuance. The Owner covenants and agrees not to apply for building permits until: (a) the Site Plan has received approval; (b) this Agreement has been executed by the Owner and filed with the Municipality; (c) the Municipality has confirmed that water, roads, sewage facilities and utilities are available to its satisfaction; (d) the Municipality has confirmed that an adequate water supply for firefighting operations and satisfactory access for firefighting equipment is available to service the Land; (e) the Municipality has confirmed that all development charges, taxes, levies, fees and other payments required under this Agreement have been paid in full or secured by sufficient security; (f) the Municipality has confirmed that all necessary conveyance of land, easements and reserves have been received free and clear of all encumbrances and have been registered against title; and (g) the Municipality has certified that, on lots or blocks on which easements have been imposed or for lots and blocks immediately adjacent to such easements, required municipal services have been installed within the limits of the easements granted to the Municipality. (h) A grading plan has been incorporated into the site approved by the Municipality. (i) Prior to construction beyond the top of foundation a certificate from the Owner’s Engineer is to be provided to the Municipality certifying that the elevation of the top of the foundation is in conformity with the overall lot grading plan and the requirement that all foundations be constructed so as to be completely located a minimum of 0.3m above the seasonal high groundwater level and that the foundation has been located in compliance with zoning setbacks and yards. Lot grading incorporated in the site plans shall contain all information required by the Municipality, including the requirements specified in the Municipality’s engineering standards, and shall at a minimum illustrate the following: (a) The location and dimensions of the proposed buildings and accessory structures and any structures on adjacent lots; (b) The location, size and elevation of the sewage services/sub-surface sewage disposal system on each lot and all pertinent design criteria; (c) The location of water services/xxxxx on the lot and adjacent lots; (d) The seasonal high groundwater elevation; (e) The extent of the disturbed area; existing and proposed grades; and the elevations of the building footings, top of the foundation wall, and the minimum opening; (f) The location of any slopes or hazard areas on the lot; (g) The direction of surface drainage, xxxxxx and other related features and break points for surface drainage; and, (h) Zoning setback requirements and compliance with those requirements. (i) No occupancy shall be granted by the Municipality’s Building Department, and the Owner agrees that no occupancy shall occur, until all of the requirements for occupancy as outlined within this Agreement have been met.

Appears in 2 contracts

Samples: Site Plan Agreement, Site Plan Agreement

AutoNDA by SimpleDocs

Building Permit Issuance. The Owner covenants and agrees not to apply for building permits until: (a) the Site Plan has received approval; (b) this Agreement has been executed by the Owner and filed with the Municipality; (c) the Municipality has confirmed that water, roads, sewage facilities and utilities are available to its it’s satisfaction; (d) the Municipality has confirmed that an adequate water supply for firefighting operations and satisfactory access for firefighting equipment is available to service the LandLands; (e) the Municipality has confirmed that all development charges, taxes, levies, fees and other payments required under this Agreement have been paid in full or secured by sufficient security; (f) the Municipality has confirmed that all necessary conveyance of land, easements and reserves have been received free and clear of all encumbrances and have been registered against title; and (g) the Municipality has certified that, on lots or blocks on which easements have been imposed or for lots and blocks immediately adjacent to such easements, required municipal services have been installed within the limits of the easements granted to the Municipality. (h) A grading plan has been incorporated into the site approved by the Municipality. (i) Prior to construction beyond the top of foundation a certificate from the Owner’s Engineer is to be provided to the Municipality certifying that the elevation of the top of the foundation is in conformity with the overall lot grading plan and the requirement that all foundations be constructed so as to be completely located a minimum of 0.3m above the seasonal high groundwater level and that the foundation has been located in compliance with zoning setbacks and yards. Lot grading incorporated in the site plans shall contain all information required by the Municipality, including the requirements specified in the Municipality’s engineering standards, and shall at a minimum illustrate the following: (a) The location and dimensions of the proposed buildings and accessory structures and any structures on adjacent lots; (b) The location, size and elevation of the sewage services/sub-surface sewage disposal system on each lot and all pertinent design criteria; (c) The location of water services/xxxxx services on the lot and adjacent lots; (d) The seasonal high groundwater elevation; (e) The extent of the disturbed area; existing and proposed grades; and the elevations of the building footings, top of the foundation wall, and the minimum opening; (f) The location of any slopes or hazard areas on the lot; (g) The direction of surface drainage, xxxxxx and other related features and break points for surface drainage; and, (h) Zoning setback requirements and compliance with those requirements. (i) I.1 No occupancy shall be granted by the Municipality’s Building Department, and the Owner agrees that no occupancy shall occur, until all of the requirements for occupancy as outlined within this Agreement have been met.

Appears in 1 contract

Samples: Site Plan Agreement

AutoNDA by SimpleDocs

Building Permit Issuance. 1. The Owner covenants and agrees shall not to apply for or be entitled to building permits permits, except for any model homes which the Township has specifically authorized, until: (a) this Agreement has been registered on title to the Site Plan has received approvalLands; (b) this Agreement the Plan of Subdivision has been executed by the Owner and filed with the MunicipalityRegistered; (c) the Municipality Director of Engineering has confirmed that satisfactory water, roads, road and sewage facilities and utilities are available to its satisfactionservice the Lands and all roads are paved with base course asphalt; (d) the Municipality Township’s Fire Chief has confirmed that an adequate water supply for firefighting operations and satisfactory access for firefighting equipment is available to service the LandLands; (e) the Municipality Director of Engineering has confirmed that “Unassumed Road” signs, temporary street name and regulatory signs have been installed in accordance with this Agreement; (f) the Director of Finance has confirmed that all applicable development charges, taxes, levies, fees and other payments required under this Agreement have been paid in full or secured by sufficient security; (fg) the Municipality Township’s solicitor has confirmed that all necessary conveyance conveyances of land, easements and reserves have been received free and clear of all encumbrances Encumbrances and have been registered against title; and; (gh) the Municipality Director of Engineering has certified that, on lots or blocks on which easements have been imposed or for lots and blocks immediately adjacent to such easements, required municipal services Municipal Services have been installed within the limits of the easements granted to the Municipality. (h) A grading plan has been incorporated into the site approved by the Municipality.Township; (i) Prior the Owner is capable of satisfying all requirements related to construction beyond the top of foundation a certificate from the Owner’s Engineer is to be provided to the Municipality certifying that the elevation of the top of the foundation is any other applicable law in conformity accordance with the overall lot grading plan and the requirement that all foundations be constructed so as to be completely located a minimum of 0.3m above the seasonal high groundwater level and that the foundation has been located in compliance with zoning setbacks and yards. Lot grading incorporated in the site plans shall contain all information required by the MunicipalityBuilding Code Act, including the requirements specified in the Municipality’s engineering standards1992, and shall at a minimum illustrate the following: (a) The location and dimensions of the proposed buildings and accessory structures and any structures on adjacent lotsS.O. 1992, c.23; (bj) The locationdetailed lot grading and siting plans showing the lot drainage and grading, size location of all utilities (storm, sanitary and elevation water), as well as the depth at the connection on the street line have been submitted to the Chief Building Official, stamped by an Ontario Land Surveyor or the Consulting Engineer, and approved in accordance with the requirements of the sewage services/sub-surface sewage disposal system on each lot and all pertinent design criteriaTownship; (ck) The location of water services/xxxxx on the lot Owner has complied with all matters specified in Schedule “J” and adjacent lots;Schedule “N” (where applicable); and (dl) The seasonal high groundwater elevation; (e) The extent of the disturbed area; existing and proposed grades; and the elevations of the all building footings, top of the foundation wall, and the minimum opening; (f) The location of any slopes or hazard areas on the lot; (g) The direction of surface drainage, xxxxxx and other related features and break points for surface drainage; and, (h) Zoning setback requirements and compliance with those requirements. (i) No occupancy shall be granted by the Municipality’s Building Department, and the Owner agrees that no occupancy shall occur, until all of the requirements for occupancy as outlined within this Agreement permit fees have been metpaid to the Township.

Appears in 1 contract

Samples: Subdivision Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!