Capacity, Standing & Power Sample Clauses

Capacity, Standing & Power. 1.1 The Vendor has full power and authority to enter into this Agreement and to carry out the transactions provided for in this Agreement.
AutoNDA by SimpleDocs

Related to Capacity, Standing & Power

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Number Resources, Rate Center Areas and Routing Points 8.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes. 8.2 It shall be the responsibility of each Party to program and update its own switches and network systems pursuant to information provided in the LERG in order to recognize and route traffic to the other Party’s assigned NXX codes. Except as expressly set forth in this Agreement, neither Party shall impose any fees or charges whatsoever on the other Party for such activities. 8.3 Unless otherwise required by Commission order, the Rate Center Areas will be the same for each Party. During the term of this Agreement, Onvoy shall adopt the Rate Center Area and Rate Center Points that the Commission has approved for Frontier within the LATA and Tandem serving area. Onvoy shall assign whole NPA-NXX codes to each Rate Center Area unless otherwise ordered by the FCC, the Commission or another governmental entity of appropriate jurisdiction, or the LEC industry adopts alternative methods of utilizing NXXs. 8.4 Onvoy will also designate a Routing Point for each assigned NXX code. Onvoy shall designate one location for each Rate Center Area in which the Onvoy has established NXX code(s) as the Routing Point for the NPA-NXXs associated with that Rate Center Area, and such Routing Point shall be within the same LATA as the Rate Center Area but not necessarily within the Rate Center Area itself. Unless specified otherwise, calls to subsequent NXXs of Onvoy will be routed in the same manner as calls to Xxxxx’s initial NXXs. 8.5 Notwithstanding anything to the contrary contained herein, nothing in this Agreement is intended, and nothing in this Agreement shall be construed, to in any way constrain Onvoy’s choices regarding the size of the local calling area(s) that Onvoy may establish for its Customers, which local calling areas may be larger than, smaller than, or identical to Frontier’s local calling areas.

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • Full Power Customer has full power and is duly authorized to execute and deliver this Agreement and to perform its obligations hereunder. Customer has full power to enter into and engage in any and all transactions (i) in any Account with any BNPP Entity or (ii) that is subject to this Agreement. Further, this Agreement has been duly executed and delivered by Customer, and constitutes a valid, binding and enforceable agreement of Customer, enforceable in accordance with its terms, subject to applicable bankruptcy, insolvency and similar laws affecting creditors’ rights generally and general principles of equity.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!