Changes to Capital Firm Schemes. 5.1 The Lead Partner may propose changes to any Capital Firm Scheme at any time prior to the Capital Firm Scheme Completion Date. Any such changes must be proposed via IMS and must take account of any Tranche already received by the Lead Partner. 5.2 Where a Pre-Start Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.3 (Changes to Capital Firm Schemes) below. 5.3 If Homes England: 5.3.1 accepts the Pre-Start Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement or proceed with it on the basis of the recalculated Capital Firm Scheme Grant figure or to withdraw the proposed Pre-Start Change. If: (a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will (subject to any invocation by the Relevant Consortium Member and Lead Partner of Clause 8.1 (Capital Firm Scheme substitution and additions) and any resulting operation of Clause 8 (Capital Firm Scheme substitution and additions) withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same; (b) the proposed Pre-Start Change is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), the Lead Partner shall reinstate in IMS the Capital Firm Scheme Details ante the date of the Pre- Start Change and, following Homes England's approval of such reinstated details in IMS, the Capital Firm Scheme shall proceed on the basis of those reinstated Capital Firm Scheme Details; (c) the Lead Partner wishes to proceed with the Capital Firm Scheme, it must immediately amend the Capital Firm Scheme Details in IMS to reflect the Pre-Start Change, the recalculated Capital Firm Scheme Grant figure and any Acquisition Tranche Grant already received. The amended Capital Firm Scheme Details (together with any adjustments to the sum and percentages of the subsequent Tranches due as a result of the recalculated Capital Firm Scheme Grant figure being lower than the original Capital Firm Scheme Grant figure) will be deemed to be effective from the date of their acceptance by Homes England (through IMS); and (d) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Lead Partner to withdraw the Capital Firm Scheme from this Agreement; 5.3.2 accepts the Pre-Start Change (including any change to the Capital Firm Scheme Grant figure) as proposed by the Lead Partner, it will accept the change through IMS and the relevant Capital Firm Scheme Details will be deemed to have been amended with effect from the date of such acceptance; 5.3.3 rejects the Pre-Start Change, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to proceed with the Capital Firm Scheme on the original basis or to withdraw it. If: (a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same; or (b) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Relevant Consortium Member to withdraw the Capital Firm Scheme from this Agreement.
Appears in 2 contracts
Samples: Grant Agreement, Grant Agreement
Changes to Capital Firm Schemes.
5.1 The Lead Partner may propose changes to any Capital Firm Scheme at any time prior to the Capital Firm Scheme Completion Date. Any such changes must be proposed via IMS and must take account of any Tranche already received by the Lead Partner.
5.2 Where a Pre-Start Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.3 (Changes to Capital Firm Schemes) below.
5.3 If Homes England:
5.3.1 accepts the Pre-Start Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement or proceed with it on the basis of the recalculated Capital Firm Scheme Grant figure or to withdraw the proposed Pre-Start Change. If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will (subject to any invocation by the Relevant Consortium Member and Lead Partner of Clause 8.1 (Capital Firm Scheme substitution and additions) and any resulting operation of Clause 8 (Capital Firm Scheme substitution and additions) withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same;
(b) the proposed Pre-Start Change is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), the Lead Partner shall reinstate in IMS the Capital Firm Scheme Details ante the date of the Pre- Start Change and, following Homes England's approval of such reinstated details in IMS, the Capital Firm Scheme shall proceed on the basis of those reinstated Capital Firm Scheme Details;
(c) the Lead Partner wishes to proceed with the Capital Firm Scheme, it must immediately amend the Capital Firm Scheme Details in IMS to reflect the Pre-Start Change, the recalculated Capital Firm Scheme Grant figure and any Acquisition Tranche Grant already received. The amended Capital Firm Scheme Details (together with any adjustments to the sum and percentages of the subsequent Tranches due as a result of the recalculated Capital Firm Scheme Grant figure being lower than the original Capital Firm Scheme Grant figure) will be deemed to be effective from the date of their acceptance by Homes England (through IMS); and
(d) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Lead Partner to withdraw the Capital Firm Scheme from this Agreement;
5.3.2 accepts the Pre-Start Change (including any change to the Capital Firm Scheme Grant figure) as proposed by the Lead Partner, it will accept the change through IMS and the relevant Capital Firm Scheme Details will be deemed to have been amended with effect from the date of such acceptance;
5.3.3 rejects the Pre-Start Change, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to proceed with the Capital Firm Scheme on the original basis or to withdraw it. If:Homes
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same; or
(b) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Relevant Consortium Member to withdraw the Capital Firm Scheme from this Agreement.
Appears in 1 contract
Samples: Grant Agreement
Changes to Capital Firm Schemes.
5.1 The Lead Partner may propose changes to any Capital Firm Scheme (on behalf of the Relevant Consortium Member) at any time prior to the Capital Firm Scheme Completion Date. Any such changes must be proposed via IMS and must take account of any Tranche already received by the Lead Partner.Partner.
5.2 Where a Pre-Start First Claim Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.3 (Changes to Capital Firm Schemes) below.below.
5.3 If Homes England:England:
5.3.1 accepts the Pre-Start First Claim Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement or proceed with it on the basis of the recalculated Capital Firm Scheme Grant figure or to withdraw retract the proposed Pre-Start First Claim Change. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will (subject to any invocation by the Relevant Consortium Member and Lead Partner of Clause 8.1 (Capital Firm Scheme substitution and additions) and any resulting operation of Clause 8 (Capital Firm Scheme substitution and additions)) withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the samecommensurately;
(b) the proposed Pre-Start First Claim Change is withdrawn retracted by the Lead Partner (on behalf of the Relevant Consortium Member), the Lead Partner shall reinstate in IMS the Capital Firm Scheme Details ante the date of the Pre- Start First Claim Change and, following Homes England's approval of such reinstated details in IMS, the Capital Firm Scheme shall proceed on the basis of those reinstated Capital Firm Scheme Details;
(c) the Lead Partner wishes to proceed with the Capital Firm Scheme, it must immediately amend the Capital Firm Scheme Details in IMS to reflect the Pre-Start First Claim Change, the recalculated Capital Firm Scheme Grant figure and any Acquisition Tranche Grant already receivedfigure. The amended Capital Firm Scheme Details (together with any adjustments to the sum and percentages of the subsequent Tranches due as a result of the recalculated Capital Firm Scheme Grant figure being lower than the original Capital Firm Scheme Grant figure) will be deemed to be effective from the date of their acceptance by Homes England (through IMS); andand
(d) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Lead Partner to withdraw the Capital Firm Scheme from this Agreement;
5.3.2 accepts the Pre-Start First Claim Change (including any change to the Capital Firm Scheme Grant figure) as proposed by the Lead Partner, it will accept the change through IMS and the relevant Capital Firm Scheme Details will be deemed to have been amended with effect from the date of such acceptance;
5.3.3 rejects the Pre-Start First Claim Change, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to proceed with the Capital Firm Scheme on the original basis or to withdraw it. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the samecommensurately; or
(b) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Relevant Consortium Member to withdraw the Capital Firm Scheme from this Agreement.
5.4 Where a Pre-Final Claim Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.5 (Changes to Capital Firm Schemes) below.
5.5 If Homes England:
5.5.1 accepts the Pre-Final Claim Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement, proceed with the Capital Firm Scheme on the basis of the recalculated Capital Firm Scheme Grant figure or to retract the Pre-Final Claim Change. If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the balance of the Capital Firm Scheme Grant allocated to such scheme and the Relevant Consortium Member must repay Homes England a sum equivalent to such part of the Capital Firm Scheme Grant as has then been received by it, such repayment to be made within fifteen
Appears in 1 contract
Samples: Grant Agreement
Changes to Capital Firm Schemes.
5.1 The Lead Partner may propose changes to any Capital Firm Scheme at any time prior to the Capital Firm Scheme Completion Date. Any such changes must be proposed via IMS and must take account of any Tranche already received by the Lead Partner.Partner.
5.2 Where a Pre-Start Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.3 (Changes to Capital Firm Schemes) below.below.
5.3 If Homes England:England:
5.3.1 accepts the Pre-Start Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement or proceed with it on the basis of the recalculated Capital Firm Scheme Grant figure or to withdraw the proposed Pre-Start Change. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will (subject to any invocation by the Relevant Consortium Member and Lead Partner of Clause 8.1 (Capital Firm Scheme substitution and additions) and any resulting operation of Clause 8 (Capital Firm Scheme substitution and additions) withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same;
(b) the proposed Pre-Start Change is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), the Lead Partner shall reinstate in IMS the Capital Firm Scheme Details ante the date of the Pre- Start Change and, following Homes England's approval of such reinstated details in IMS, the Capital Firm Scheme shall proceed on the basis of those reinstated Capital Firm Scheme Details;
(c) the Lead Partner wishes to proceed with the Capital Firm Scheme, it must immediately amend the Capital Firm Scheme Details in IMS to reflect the Pre-Start Change, the recalculated Capital Firm Scheme Grant figure and any Acquisition Tranche Grant already received. The amended Capital Firm Scheme Details (together with any adjustments to the sum and percentages of the subsequent Tranches due as a result of the recalculated Capital Firm Scheme Grant figure being lower than the original Capital Firm Scheme Grant figure) will be deemed to be effective from the date of their acceptance by Homes England (through IMS); andand
(d) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Lead Partner to withdraw the Capital Firm Scheme from this Agreement;
5.3.2 accepts the Pre-Start Change (including any change to the Capital Firm Scheme Grant figure) as proposed by the Lead Partner, it will accept the change through IMS and the relevant Capital Firm Scheme Details will be deemed to have been amended with effect from the date of such acceptance;
5.3.3 rejects the Pre-Start Change, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to proceed with the Capital Firm Scheme on the original basis or to withdraw it. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the same; or
(b) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Relevant Consortium Member to withdraw the Capital Firm Scheme from this Agreement.
5.4 Where a Post-Start Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.5 (Changes to Capital Firm Schemes) below.
5.5 If Homes England:
5.5.1 accepts the Post-Start Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement, proceed with the Capital Firm Scheme on the basis of the recalculated Capital Firm Scheme Grant figure or to retract the Post-Start Change. If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the balance of the Capital Firm Scheme Grant allocated to such scheme and the Relevant Consortium Member must repay Homes England a sum equivalent to such part of the Capital Firm Scheme Grant as has then been received by it, such repayment to be made within fifteen
Appears in 1 contract
Samples: Grant Agreement
Changes to Capital Firm Schemes.
5.1 The Lead Partner may propose changes to any Capital Firm Scheme (on behalf of the Relevant Consortium Member) at any time prior to the Capital Firm Scheme Completion Date. Any such changes must be proposed via IMS and must take account of any Tranche already received by the Lead Partner.Partner.
5.2 Where a Pre-Start First Claim Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.3 (Changes to Capital Firm Schemes) below.below.
5.3 If Homes England:England:
5.3.1 accepts the Pre-Start First Claim Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement or proceed with it on the basis of the recalculated Capital Firm Scheme Grant figure or to withdraw retract the proposed Pre-Start First Claim Change. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will (subject to any invocation by the Relevant Consortium Member and Lead Partner of Clause 8.1 (Capital Firm Scheme substitution and additions) and any resulting operation of Clause 8 (Capital Firm Scheme substitution and additions)) withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the samecommensurately;
(b) the proposed Pre-Start First Claim Change is withdrawn retracted by the Lead Partner (on behalf of the Relevant Consortium Member), the Lead Partner shall reinstate in IMS the Capital Firm Scheme Details ante the date of the Pre- Start First Claim Change and, following Homes England's approval of such reinstated details in IMS, the Capital Firm Scheme shall proceed on the basis of those reinstated Capital Firm Scheme Details;
(c) the Lead Partner wishes to proceed with the Capital Firm Scheme, it must immediately amend the Capital Firm Scheme Details in IMS to reflect the Pre-Start First Claim Change, the recalculated Capital Firm Scheme Grant figure and any Acquisition Tranche Grant already receivedfigure. The amended Capital Firm Scheme Details (together with any adjustments to the sum and percentages of the subsequent Tranches due as a result of the recalculated Capital Firm Scheme Grant figure being lower than the original Capital Firm Scheme Grant figure) will be deemed to be effective from the date of their acceptance by Homes England (through IMS); andand
(d) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Lead Partner to withdraw the Capital Firm Scheme from this Agreement;
5.3.2 accepts the Pre-Start First Claim Change (including any change to the Capital Firm Scheme Grant figure) as proposed by the Lead Partner, it will accept the change through IMS and the relevant Capital Firm Scheme Details will be deemed to have been amended with effect from the date of such acceptance;
5.3.3 rejects the Pre-Start First Claim Change, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to proceed with the Capital Firm Scheme on the original basis or to withdraw it. If:If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the Capital Firm Scheme Grant allocated to such scheme and the Allocated Capital Grant figure will be reduced commensurately and the Lead Partner must repay Homes England a sum equivalent to the Acquisition Tranche Grant received by it, such payment to be made within fifteen (15) Business Days of receipt of Homes England's written demand for the samecommensurately; or
(b) a Notification Failure occurs, Homes England shall be entitled (but not obliged) to treat such failure as a decision by the Relevant Consortium Member to withdraw the Capital Firm Scheme from this Agreement.
5.4 Where a Pre-Final Claim Change is proposed, Homes England will be entitled to accept or reject such change or to accept it subject to adjustment by Homes England in accordance with the procedure set out in Clause 5.5 (Changes to Capital Firm Schemes) below.
5.5 If Homes England:
5.5.1 accepts the Pre-Final Claim Change in principle, it shall be entitled to recalculate the Capital Firm Scheme Grant allocated to the Capital Firm Scheme by reference to the proposed change. Where the result of that recalculation is a lower Capital Firm Scheme Grant figure than that set out in the Capital Firm Scheme Details, Homes England will notify the Lead Partner and the Lead Partner will have twenty (20) Business Days from the date of receipt of Homes England's notification to advise Homes England as to whether the Relevant Consortium Member wishes to withdraw the Capital Firm Scheme from this Agreement, proceed with the Capital Firm Scheme on the basis of the recalculated Capital Firm Scheme Grant figure or to retract the Pre-Final Claim Change. If:
(a) the Capital Firm Scheme is withdrawn by the Lead Partner (on behalf of the Relevant Consortium Member), Homes England will permanently withdraw the balance of the Capital Firm Scheme Grant allocated to such scheme and the Relevant Consortium Member must repay Homes England a sum equivalent to such part of the Capital Firm Scheme Grant as has then been received by it, such repayment to be made within fifteen