Checking of Load Clause Samples
Checking of Load. After loading the vehicle and before leaving the plant, and employee must:
(a) Check that the slump of the load when fully mixed will be, upon delivery, within the tolerance of the slump specified on the delivery docket;
(b) Immediately report to the Company plant supervisor if the employee thinks that the slump will not comply with the specification; and
(c) Check that the concrete specified on the docket is the same as the concrete in the mixer for those characteristics that can be visually checked. For example, load size and aggregate type.
Checking of Load. After loading the vehicle and before leaving the site or depot, all subcontractors shall:
a) Ensure that the load is appropriately secured by available load restraint equipment
Checking of Load. After loading the Vehicle and before leaving the loading place, the Contract Carrier must:
(a) ensure that the load is secured; and
(b) immediately report to the Principal Contractor if the Contract ▇▇▇▇▇▇▇ believes that the goods do not comply with the specification on the delivery docket or exceeds the maximum legal payload for the Vehicle.
