Personnel Equipment and Material Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the reasonable opinion of County, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the Project when so instructed by County. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than County. Engineer may not change the Project Manager without prior written consent of County.
WORKMANSHIP AND MATERIALS 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment. 1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work. 1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price. 1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building. 1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.
Stored Materials The Department shall not be required to pay for materials stored at the site or stored at other locations absent prior written authorization to do so, which authorization may be withheld at the Department's sole discretion. If the Department expressly agrees to pay for materials stored at the site but not yet incorporated into the Work, the Application for Payment may also include a request for payment of the cost of such materials, if the materials have been delivered to the site, and suitably stored. Such requests shall be documented by appropriate invoices and bills of sale. Payment for stored materials shall be conditioned also on the Design-Builder’s representation that it has inspected the material and found it to be free from defect and otherwise in conformity with this Agreement, and on satisfactory evidence that the materials are insured under the builder’s risk policy. Further, if the Design-Builder requests the Department to allow payments for storage of materials offsite, the Design-Builder shall be required, inter alia, to agree to execution of proper documentation to afford the Department a secured interest in the materials upon payment.
Time and Materials If this contract is designated as a Time and Materials contract, invoicing and payment shall be as follows: (a) Consultant shall submit invoices, not more often than once a month during the term of this agreement, based on the cost for work performed in accordance with the Rate Schedule in the Scope of Work and authorized reimbursable expenses incurred prior to the invoice date. Invoices shall contain the following information: (i) Serial identifications of bills, i.e., Xxxx No. 1; (ii) The beginning and ending dates of the billing period; (iii) A summary containing the total contract amount, the amount of prior xxxxxxxx, the total due this period, percentage of work completed, the remaining balance available for all remaining billing periods, and a brief description of work completed during the billing period. (b) City shall make monthly payments, based on such invoices, for satisfactory progress in completion of the Scope of Work, and for authorized reimbursable expenses incurred.
Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except: