Compaction Control Tests Sample Clauses

Compaction Control Tests. 1. Determination of in-place density and percent compaction of standard density shall be by: In-place Density and Moisture Content of Soil and Soil-aggregate by Nuclear Methods (Shallow Depth) per AASHTO T-310. The testing frequency for materials placed in a roadway section shall be 1 test per each 300 liner feet of roadway and 1 test per 10,000 square feet of general fill and embankment areas for each lift.
AutoNDA by SimpleDocs

Related to Compaction Control Tests

  • Alcohol Testing Alcohol testing will be conducted by using an evidential breath testing device (EBT) approved by the National Highway Traffic Safety Administration. Non-EBT devices may be used for initial screening tests. A screening test will be conducted first. If the result is an alcohol concentration level of less than 0.02, the test is considered a negative test. If the alcohol concentration level is 0.02 or more, a second confirmation test will be conducted. Levels of .04 or greater on the confirmation test will be considered positive.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • DRUG/ALCOHOL TESTING 11.1 The parties agree that the maintenance of a drug/alcohol free work place is a goal of both the College and the Union. Employees are prohibited from possession, consumption and/or being under the influence of a controlled substance/alcohol while on the College’s premises or during time paid by the employer. Violations of this prohibition may result in a disciplinary action up to and including termination.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Data Access Control Persons entitled to use data processing systems gain access only to the Personal Data that they have a right to access, and Personal Data must not be read, copied, modified or removed without authorization in the course of processing, use and storage. Measures: • As part of the SAP Security Policy, Personal Data requires at least the same protection level as “confidential” information according to the SAP Information Classification standard. • Access to Personal Data is granted on a need-to-know basis. Personnel have access to the information that they require in order to fulfill their duty. SAP uses authorization concepts that document grant processes and assigned roles per account (user ID). All Customer Data is protected in accordance with the SAP Security Policy. • All production servers are operated in the Data Centers or in secure server rooms. Security measures that protect applications processing Personal Data are regularly checked. To this end, SAP conducts internal and external security checks and penetration tests on its IT systems. • SAP does not allow the installation of software that has not been approved by SAP. • An SAP security standard governs how data and data carriers are deleted or destroyed once they are no longer required.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

Time is Money Join Law Insider Premium to draft better contracts faster.