Common use of Computation of Fixed Charge Clause in Contracts

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive shall be payable in accordance with the provisions of Clause 11.6.1. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.

Appears in 2 contracts

Samples: Procurement Agreement, Procurement Agreement

AutoNDA by SimpleDocs

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) [during Peak Hours]20 computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference 19 The words in square parenthesis may be omitted if the procurement of electricity is not to be confined to Peak Hours. $ This amount shall be the amount specified in the Bid, which shall not less than Re. 1 (Rupee one) per kWh in any case or such minimum amount as may be specified in the RFP. 20 The words in square parenthesis in Clauses 11.4.2 and 11.4.3 may be added if procurement of electricity is to be confined to Peak Hours. beyond such 85% (eighty five per cent)) [during Peak Hours], Incentive shall be payable in accordance with the provisions of Clause 11.6.1. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof [during Peak Hours], and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.

Appears in 1 contract

Samples: Procurement Agreement

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive shall be payable in accordance with the provisions of Clause 11.6.1. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.

Appears in 1 contract

Samples: Procurement Agreement

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive shall be payable in accordance with the provisions of Clause 11.6.1. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof thereof, and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of FuelWater, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel Water caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.

Appears in 1 contract

Samples: Procurement Agreement

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall 11.3shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the Capacity(the “Capacity Charge”). Provided, however, that $ This amount shall be the amount specified in the event Bid, which shall not less than Re. 1 (Rupee one) per kWh in any case or such minimum amount as may be specified in the RfS. Provided that the Availability to be considered for calculation of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive Fixed Charges shall be payable in accordance with the provisions of Clause 11.6.1reconciled annually on cumulative basis. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in intra state transmission between system in accordance with the Point provision of Grid Connection and Delivery PointClause 5.3, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Utilities or Buyers, as the case may be, and to the extent of full or part Non- Non-Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.411.4.3. Provided further that sharing of gain from sale of such power shall be in the same manner as provided for sale of un-requisitioned power in applicable rules issued by the Ministry of Power, as amended from time to time. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Non-Availability hereunder.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility GRIDCO to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that $ This amount shall be the amount specified in the event Bid, which shall not less than Re. 1 (Rupee one) per kWh in any case or such minimum amount as may be specified in the RFP. Provided that the Availability to be considered for calculation of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive Fixed Charges shall be payable in accordance with the provisions of Clause 11.6.1reconciled annually on cumulative basis. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility GRIDCO occurs on account of deficiency in intra state transmission between system in accordance with the Point provision of Grid Connection and Delivery PointClause 5.3, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Utilities or Buyers, as the case may be, and to the extent of full or part Non- Non-Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility GRIDCO shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.Clause

Appears in 1 contract

Samples: Procurement Agreement

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting YearDeleted. 11.4.2 The obligations of the Utility Aggregator to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect inrespect of the Normative Availability of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive shall be payable in accordance with the provisions of Clause 11.6.1. $ This amount shall be the amount specified in the Bid, which shall not less than Re. 1 (Rupee one) per kWh in any case or such minimum amount as may be specified in the RFP. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof thereof, and in the event it supplies electricity to the Utility Aggregator in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility Aggregator occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility Aggregator shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Non-Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplierarising as a consequence thereof. 11.4.5 In the event that any shortfall in supply of electricity to the Utility Aggregator occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Aggregator shall not be liable to payment of any Fixed Charge for the Non- Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunderFuel.

Appears in 1 contract

Samples: Procurement Agreement

Computation of Fixed Charge. (Not as the part of the Tariff as the rate quoted is Xxx Xxx) 11.4.1 Subject to the provisions of this Clause 11.4, the Base Fixed Charge, as corrected for variation in WPI Index in accordance with Clause 11.3 shall be the Fixed Charge payable for Availability in each month of the relevant Accounting Year. 11.4.2 The obligations of the Utility to pay Fixed Charges in any Accounting Year shall in no case exceed an amount equal to the Fixed Charge due and payable for and in respect of the Normative Availability (Month wsise) of 85% (eighty five per cent) computed with reference to the Contracted Capacity (the “Capacity Charge”). Provided, however, that in the event of Despatch of the Power Station with reference to beyond such 85% (eighty five per cent), Incentive shall be payable in accordance with the provisions of Clause 11.6.1. 11.4.3 Pursuant to the provisions of Clause 11.4.4, the Supplier shall not, for and in respect of any day, be entitled to receive payment of Fixed Charge for Availability exceeding 85% (eighty five per cent) thereof and in the event it supplies electricity to the Utility in excess of such 85% (eighty five per cent), such excess supply shall be eligible only for payment of Variable Charge, save and except the payment of Incentive due under the provisions of Clause 11.4.2. 11.4.4 In the event that any shortfall in supply of electricity to the Utility occurs on account of deficiency in transmission between the Point of Grid Connection and Delivery Point, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.2 and the Non-Availability arising as a consequence thereof shall, for the purposes of payment of Fixed Charge, be deemed to be Availability to the extent of 50% (fifty per cent) of the Non-Availability hereunder. Provided, however, that the Supplier may, in its sole discretion, Despatch the Power Station to the extent of full or part Non-Availability hereunder for supply to other Buyers, and to the extent of full or part Non- Availability hereunder for supply to other Buyers, and to the extent of such Despatch, the Utility shall not be liable to payment of any Fixed Charge due and payable in accordance with the provisions of this Clause 11.4.4. For the avoidance of doubt, the Parties expressly agree that if such deficiency in transmission is caused by an action or omission attributable to the Supplier, it shall not be reckoned for the purposes of computing Availability hereunder. The Parties further agree that any and all revenues received from Buyers shall be applied first towards reduction of Fixed Charge payable by the Utility hereunder and only the balance remaining shall be appropriated by the Supplier. 11.4.5 In the event that any shortfall in supply of electricity to the Utility occurs on account of shortage of Fuel, Availability shall be deemed to be reduced in accordance with the provisions of Clause 11.5.3. Provided, however, that the Non-Availability arising as a consequence of shortage of Fuel caused by any event of Force Xxxxxx shall, for the purpose of payment of Fixed Charge, be deemed to be availability to the extent of 30% (thirty per cent) of the Non- Availability hereunder.

Appears in 1 contract

Samples: Procurement Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!