Construction Control Points and Benchmarks. Final design shall include the establishment of permanent horizontal and vertical alignment control points throughout the entire Project limits using United States Geological Survey (USGS) data. The Engineer shall provide a permanent benchmark within two hundred (200) feet of the beginning and ending of the proposed construction. All surveys and control points shall be tied to the City’s GIS control network and datum. 60% Plans and Specifications. Equipment Schedules. Update of Basis of Design Report. Update of Illustrative Drawings (two [2]) renderings and illustrative site plan). 60% Estimate of Probable Construction Costs. Equipment Manual. Equipment Layout Drawings. Safety Certification Checklist. 95% Plans and Specifications. Design Analysis Report. 95% Estimate of Probable Construction Costs. 100%/final plans, specifications and estimates. Final design presentations Geotechnical requirements. Review test lab vouchers. Building permit coordination. Permit applications.
Construction Control Points and Benchmarks. Final design shall include the establishment of permanent horizontal and vertical alignment control points throughout the entire Project limits using United States Geological Survey (USGS) data. The Engineer shall provide a permanent benchmark within two hundred (200) feet of the beginning and ending of the proposed construction. All surveys and control points shall be tied to the City’s GIS control network and datum.