Construction Drawings. By the Construction Drawings Date, Tenant shall: (1) provide all information concerning Tenant's requirements in order for Architect and Engineer to prepare the Construction Drawings, (2) cause Architect and Engineer to complete the Construction Drawings (which shall include at least three (3) mylar sepias, or such other quantity as Landlord may reasonably require), and (3) obtain Landlord's written approval thereof. "Construction Drawings" herein means fully dimensioned architectural construction drawings and specifications, and any required engineering drawings (including mechanical, electrical, plumbing, air-conditioning, ventilation and heating), and shall include any applicable items described above for the Space Plan, and to the extent applicable: (i) electrical outlet locations, circuits and anticipated usage therefor, (ii) reflected ceiling plan, including lighting, switching, and any special ceiling specifications, (iii) duct locations for heating, ventilating and air-conditioning equipment, (iv) details of all millwork, (v) dimensions of all equipment and cabinets to be built in, (vi) furniture plan showing details of space occupancy, (vii) keying schedule, (viii) lighting arrangement, (ix) location of print machines, equipment in lunch rooms, concentrated file and library loadings and any other equipment or systems (with brand names wherever possible) which require special consideration relative to air-conditioning, ventilation, electrical, plumbing, structural, fire protection, life-fire-safety system, or mechanical systems, (x) special heating, ventilating and air conditioning equipment and requirements, (xi) weight and location of heavy equipment, and anticipated loads for special usage rooms, (xii) demolition plan, (xiii) partition construction plan, (xiv) all requirements under the Disabilities Acts and other governmental requirements, and (xv) final finish selections, and any other details or features reasonably required in order to obtain a final cost estimate as described in Section IV or otherwise reasonably requested by Architect, Engineer or Landlord in order for the Construction Drawings to serve as a basis for contracting the Work.
Appears in 3 contracts
Samples: Office Lease (Nextcard Inc), Office Lease (Nextcard Inc), Office Lease (Nextcard Inc)
Construction Drawings. By the Construction Drawings Date, Tenant shall: (1) provide all information concerning Tenant's requirements in order for Architect and Engineer to prepare the Construction Drawings, (2) cause Architect and Engineer to complete the Construction Drawings (which shall include at least three (3) mylar sepias, or such other quantity as Landlord may reasonably require), and (3) submit the Construction Drawings to obtain Landlord's written approval thereof. "Construction Drawings" herein means fully dimensioned architectural construction drawings and specifications, and any required engineering drawings (including mechanical, electrical, plumbing, air-conditioningair‑conditioning, ventilation and heating), and shall include any applicable items described above for the Space Plan, and to the extent applicable: (i) electrical outlet locations, circuits and anticipated usage therefor, (ii) reflected ceiling plan, including lighting, switching, and any special ceiling specifications, (iii) duct locations for heating, ventilating and air-conditioning air‑conditioning equipment, (iv) details of all millwork, (v) dimensions of all equipment and cabinets to be built in, (vi) furniture plan showing details of space occupancy, (vii) keying schedule, (viii) lighting arrangement, (ix) location of print machines, equipment in lunch rooms, concentrated file and library loadings and any other equipment or systems (with brand names wherever possible) which require special consideration relative to air-conditioningair‑conditioning, ventilation, electrical, plumbing, structural, fire protection, life-fire-safety life‑fire‑safety system, or mechanical systems, (x) special heating, ventilating and air conditioning equipment and requirements, (xi) weight and location of heavy equipment, and anticipated loads for special usage rooms, (xii) demolition plan, (xiii) partition construction plan, (xiv) all requirements under the Disabilities Acts and other governmental requirements, and (xv) final finish selections, (xvi) specifications for electrical vehicle charging stations, and (xvii) any other details or features reasonably required in order to obtain a final cost estimate as described in Section IV 4 or otherwise reasonably requested by ArchitectEngineer, Engineer Landlord or Landlord Landlord’s architect or contractor in order for the Construction Drawings to serve as a basis for contracting the Work.
Appears in 1 contract
Samples: Lease (RingCentral Inc)
Construction Drawings. By the Construction Drawings Date, Tenant shall: (1) provide all information concerning Tenant's requirements in order for Architect and Engineer to prepare the Construction Drawings, (2) cause Architect and Engineer to complete the Construction Drawings (which shall include at least three (3) mylar sepias, or such other quantity as Landlord may reasonably require), and (3) obtain Landlord's written approval thereof. "`Construction Drawings" herein means fully dimensioned architectural construction drawings and specifications, and any required engineering drawings (including mechanical, electrical, plumbing, air-conditioning, ventilation and heating), and shall include any applicable items described above for the Space Plan, and to the extent applicable: (i) electrical outlet locations, circuits and anticipated usage therefor, (ii) reflected ceiling plan, including lighting, switching, and any special ceiling specifications, (iii) duct locations for heating, ventilating and air-conditioning equipment, (iv) details of all millwork, (v) dimensions of all equipment and cabinets to be built in, (vi) furniture plan showing details of space occupancy, (vii) keying schedule, (viii) lighting arrangement, (ix) location of print machines, equipment in lunch rooms, concentrated file and library loadings and any other equipment or systems (with brand names wherever possible) which require special consideration relative to air-conditioning, ventilation, electrical, plumbing, structural, fire protection, life-fire-safety system, or mechanical systems, (x) special heating, ventilating and air conditioning equipment and requirements, (xi) weight and location of heavy equipment, and anticipated loads for special usage rooms, (xii) demolition plan, (xiii) partition construction plan, (xiv) all requirements under the Disabilities Acts and other governmental requirements, and (xv) final finish selections, and any other details or features reasonably required in order to obtain a final cost estimate as described in Section IV or otherwise reasonably requested by Architect, Engineer or Landlord in order for the Construction Drawings to serve as a basis for contracting the Work.
Appears in 1 contract
Samples: Office Lease (Zebu)