COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.1. The actual wages paid for labor in the direct employ of the Contractor in the performance of the Work. 8.2.2. The actual salaries of Contractor’s employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of material and equipment, and employees from the principal or branch office performing the functions listed below: 8.2.3. The actual cost of all employee benefits and taxes including but not limited to, unemployment compensation, Social Security, health, welfare, retirement and other fringe benefits as required by law, labor agreements, or paid under the Contractor’s standard personnel policy, insofar as such costs are paid to employees of the Contractor who are included in the Cost of the Work under Subparagraphs 8.2, 1 and 8.2, Paragraph 2. 8.2.4. Reasonable transportation, travel and hotel expenses of the Contractor’s personnel incurred in direct connection with the Work. 8.2.5. Cost of all materials, supplies and equipment incorporated in the Work, including costs of inspection, testing, transportation, storage and handling. 8.2.6. Payments made by the Contractor to Subcontractors for work performed under this Agreement. 8.2.7. Fees and expenses for design services procured by the Contractor except as provided by the Architect/Engineer and compensated in Paragraph 7.2. 8.2.8. Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value; and cost less salvage on such items used, but not consumed that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged . 8.2.9. Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the Work, whether rented from the Contractor or others, including installation, repair and replacement, dismantling, removal, maintenance, transportation and delivery costs at rental charges consistent with those prevailing in the area. 8.2.10. Cost of premiums for professional liability insurance and builder’s risk insurance, as required by Article 11. 8.2.11. Sales, use, gross receipts or other taxes, tariffs or duties related to the Work for which the Contractor is liable. 8.2.12. Permits, fees, licenses, tests, except as outlined in Paragraphs 3.3.2, 4.1.2 and Article 5. 8.2.13. All costs associated with establishing, equipping, operation, maintaining and demobilizing the field office. 8.2.14. Reproduction costs, photographs, cost of telegrams, facsimile transmissions, long distance telephone calls, data processing services, postage, express delivery charges, telephone service at the site and reasonable xxxxx cash expenses at the field office. 8.2.15. All water, power and fuel costs necessary for the Work. 8.2.16. Cost of removal of all non-hazardous substances, debris and waste materials. 8.2.17. Costs incurred due to an emergency affecting the safety of persons and/or property. 8.2.18. All costs directly incurred in the performance of the Work or in connection with the Project which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended results.
Appears in 1 contract
Samples: Design Build Agreement
COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.1. The actual wages paid for labor in the direct employ of the Contractor in the performance of 8.2.1 Labor Wages directly employed by Design-Builder performing the Work.;
8.2.2. The actual salaries 8.2.2 Salaries of ContractorDesign-Builder’s employees when stationed at the field office, in whatever capacity employedoffice to the extent necessary to complete the applicable Work, employees engaged on the road expediting the production or transportation of material and equipment, and any employees at or below the Project Management level from the principal or branch office performing when working in any capacity on the functions listed below:project whether at the project site or at the home office or any other location.
8.2.3. The actual cost 8.2.3 Cost of all employee benefits and taxes including but not limited toto workers’ compensation, unemployment compensation, Social Securitysocial security, health, welfare, retirement retirement, and other fringe benefits as required by law, labor agreements, or paid under the ContractorDesign-Builder’s standard personnel policy, insofar as such costs are paid to employees of the Contractor Design-Builder who are included in the Cost of the Work under Subparagraphs 8.2, 1 §8.2.1 and 8.2, Paragraph 2.§8.2.2;
8.2.4. 8.2.4 Reasonable transportation, travel travel, hotel, and hotel moving expenses of the ContractorDesign-Builder’s personnel incurred in direct connection with the Work.;
8.2.5. 8.2.5 Cost of all materials, supplies supplies, and equipment incorporated in the Work, including costs of inspection, testinginspection and testing if not provided by Owner, transportation, storage storage, and handling.;
8.2.6. 8.2.6 Payments made by the Contractor Design-Builder to Subcontractors for work performed under this Agreement.Work;
8.2.7. 8.2.7 Fees and expenses for design services procured or furnished by the Contractor Design-Builder except as provided by the Architect/Engineer Design-Professional and compensated in Paragraph 7.2.§7.1;
8.2.8. 8.2.8 Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed consumed, that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged .Design-Builder;
8.2.9. 8.2.9 Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the WorkWorksite, whether rented from the Contractor Design-Builder or others, including installation, repair repair, and replacement, dismantling, removal, maintenance, transportation transportation, and delivery costs costs. Rental from unrelated third parties shall be reimbursed at rental charges consistent with those actual cost. Rentals from Design-Builder or its affiliates, subsidiaries, or related parties shall be reimbursed at the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment.
8.2.10. 8.2.10 Cost of the premiums for professional liability all insurance issued specifically for this project (but not for the insurances carried by the Design-Builder for its usual business) and builder’s risk insurancesurety bonds which Design- Builder is required to procure or deems necessary, and approved by Owner, including any additional premium incurred as required by Article 11a result of any increase in the GMP.
8.2.11. 8.2.11 Sales, use, gross receipts receipts, or other taxes, tariffs tariffs, or duties related to the Work for which the Contractor Design-Builder is liable.
8.2.12. 8.2.12 Permits, fees, licenses, tests, except as outlined in Paragraphs 3.3.2, 4.1.2 and Article 5royalties.
8.2.13. 8.2.13 Losses, expenses, or damages to the extent not compensated by insurance or otherwise, and the cost of corrective work or redesign during the Construction Phase and for a one-year period following the Date of Substantial Completion, provided that such corrective work or redesign did not arise from Design-Builder’s negligence.
8.2.14 All costs associated with establishing, equipping, operationoperating, maintaining maintaining, and demobilizing the field office.
8.2.14. Reproduction costs, photographs, cost of telegrams, facsimile transmissions, long distance telephone calls, data processing services, postage, express delivery charges, telephone service at the site and reasonable xxxxx cash expenses at the field office.
8.2.15. 8.2.15 All water, power power, and fuel costs necessary for the Work.
8.2.16. 8.2.16 Cost of removal of all non-hazardous substances, debris debris, and waste materials.
8.2.17. Costs incurred due to an emergency affecting the safety of persons and/or property.
8.2.18. 8.2.17 All costs directly incurred in the performance of the Work or in connection with the Project Project, and not included in Design-Builder’s Fee as set forth in ARTICLE 7, which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended resultsDocuments.
Appears in 1 contract
Samples: Design Build Agreement
COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.1. The actual wages paid Except as otherwise expressly provided herein, the following Items shall be reimbursable Costs of the Work:
8.2.1 Wages for labor in the direct employ of the Contractor in the performance of directly employed by Private Entity performing the Work.
8.2.2. The actual salaries 8.2.2 Salaries of ContractorPrivate Entity’s employees when stationed at the field office, in whatever capacity employedoffice to the extent necessary to complete the applicable Work, employees engaged on the road expediting the production or transportation of material and equipment, and supervisory employees from the principal or branch office performing as mutually agreed by the functions listed below:Parties in writing.
8.2.3. The actual cost 8.2.3 Cost of all employee benefits and taxes including but not limited toto workers’ compensation, unemployment compensation, Social Securitysocial security, health, welfare, retirement retirement, and other fringe benefits as required by law, labor agreements, or paid under the ContractorPrivate Entity’s standard personnel policy, insofar as such costs are paid to employees of the Contractor Private Entity who are included in the Cost of the Work under Subparagraphs 8.2, 1 § 8.2.1 and 8.2, Paragraph 2§ 8.2.2.
8.2.4. 8.2.4 Reasonable transportation, travel travel, hotel, and hotel moving expenses of the ContractorPrivate Entity’s personnel incurred in direct connection with the Work.
8.2.5. 8.2.5 Cost of all materials, supplies supplies, and equipment incorporated in the Work, including costs of inspection, testinginspection and testing if not provided by Owner, transportation, storage storage, and handling.
8.2.6. 8.2.6 Payments made by the Contractor Private Entity to Subcontractors for work Work performed under this Agreementin accordance with the Subcontract terms.
8.2.7. 8.2.7 Fees and expenses for design services procured or furnished by the Contractor Private Entity except as provided by the Architect/Engineer Design Professional and compensated in Paragraph 7.2§ 7.1.
8.2.8. 8.2.8 Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed consumed, that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged Private Entity.
8.2.9. 8.2.9 Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the Work, whether rented from the Contractor or othersWorksite, including installation, repair repair, and replacement, dismantling, removal, maintenance, transportation transportation, and delivery costs. Rental from unrelated third parties shall be reimbursed at actual cost. Rental costs at shall not be reimbursable if the equipment is rented from Private Entity or its affiliates, subsidiaries, or related parties unless Private Entity demonstrates that such rental charges consistent with those prevailing shall be in the areabest interests of the Project and the terms and conditions of the rental are agreed to in a change order.
8.2.10. 8.2.10 Cost of the premiums for professional liability all insurance and builder’s risk insurancesurety bonds which Private Entity is required to procure or deems necessary, and approved by Owner, including any additional premium incurred as required by Article 11a result of any increase in the GMP.
8.2.11. 8.2.11 Sales, use, gross receipts receipts, or other taxes, tariffs tariffs, or duties related to the Work for which the Contractor Private Entity is liable.
8.2.12. 8.2.12 Permits, fees, licenses, tests, except as outlined in Paragraphs 3.3.2, 4.1.2 and Article 5royalties.
8.2.13. 8.2.13 Losses, expenses, or damages to the extent not compensated by insurance or otherwise, and the cost of corrective Work or redesign during the Construction Phase and for a one-year period following the Date of Substantial Completion, provided that such costs are charged prior to Final Payment, provided that deductibles under any program of Subcontract Default Insurance shall not be reimbursable costs of the Work, and deductibles on other insurance shall be limited as set forth in ARTICLE 11.
8.2.14 All costs associated with establishing, equipping, operationoperating, maintaining maintaining, and demobilizing the field office.
8.2.14. Reproduction costs, photographs, cost of telegrams, facsimile transmissions, long distance telephone calls, data processing services, postage, express delivery charges, telephone service at the site and reasonable xxxxx cash expenses at the field office.
8.2.15. 8.2.15 All water, power power, and fuel costs necessary for the Work.
8.2.16. 8.2.16 Cost of removal of all hazardous and non-hazardous substances, debris debris, and waste materials, except for such pre-existing hazardous substances for which Owner is responsible for removal under § 2.16, unless such removal has been added by Change Order.
8.2.17. Costs 8.2.17 Reasonable attorney’s fees, consultant, and other costs incurred due to an emergency affecting complete permitting and to mitigate Subcontractor claims on the safety of persons and/or propertyProject, but no such fees to the extent they involve any conflict between the Owner and the Private Entity.
8.2.18. 8.2.18 All costs directly incurred in the performance of the Work or in connection with the Project Project, and not included in Private Entity’s Fee, which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended resultsDocuments.
Appears in 1 contract
Samples: Comprehensive Agreement
COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.18.2.1 Time and Material Costs per Exhibit No. The actual wages B include but are not limited to:
8.2.2 Wages paid for labor in the direct employ of the Contractor Design-Builder in the performance of the Work.
8.2.2. The actual salaries 8.2.3 Salaries of Contractor’s the Design-Builder's employees when stationed at the field office, in whatever capacity employed, employed and employees engaged on the road expediting the production or transportation of material and equipment, and employees from the principal or branch office performing the functions listed below:.
8.2.3. The actual cost 8.2.4 Cost of all employee benefits and taxes including but not limited toto workers' compensation, unemployment compensation, Social Security, health, welfare, retirement and other fringe benefits as required by law, labor agreements, or paid under the Contractor’s Design-Builder's standard personnel policy, insofar as such costs are paid to employees of the Contractor Design-Builder who are included in the Cost of the Work under Subparagraphs 8.2, 1 8.2.1 and 8.2, Paragraph 28.2.2.
8.2.4. 8.2.5 Reasonable transportation, travel travel, hotel and hotel moving expenses of the Contractor’s Design-Builder's personnel incurred in direct connection with the Work.
8.2.5. 8.2.6 Cost of all materials, supplies and equipment incorporated in the Work, including costs of inspection, testinginspection and testing if not provided by the Owner, transportation, storage and handling.
8.2.6. 8.2.7 Payments made by the Contractor Design-Builder to Subcontractors for work performed under this this. Agreement.
8.2.7. 8.2.8 Fees and expenses for design services procured or furnished by the Contractor Design-Builder except as provided by the Architect/Engineer and compensated in Paragraph 7.27.1.
8.2.8. 8.2.9 Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value and/or residual value; and cost less salvage value on such items used, but not consumed that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged Design-Builder.
8.2.9. 8.2.10 Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the WorkWorksite, whether rented from the Contractor Design-Builder or othersOthers, including installation, repair and replacement, dismantling, removal, maintenance, transportation and AND delivery costs costs. Rental from unrelated third parties shall be reimbursed at rental charges consistent with those prevailing actual cost as indicated in the areaTime and Material worksheet.
8.2.10. 8.2.11 Cost of the premiums for professional liability all insurance and builder’s risk insurancesurety bonds that the Design-Builder is required to procure or deems necessary, as required and approved by Article 11the Owner.
8.2.11. 8.2.12 Sales, use, gross receipts or other taxes, tariffs or duties related to the Work for which the Contractor Design-Builder is liable.
8.2.12. Permits, fees8.2.13 Fees, licenses, tests, except royalties, damages for infringement of patents and/or copyrights, including costs of defending related suits for which the Design-Builder is not responsible as outlined set forth in Paragraphs 3.3.2Paragraph 3.7, 4.1.2 and Article 5deposits lost for causes other than the Design-Builder's negligence.
8.2.13. 8.2.14 Losses, expenses or damages to the extent not compensated by insurance OR otherwise, and the cost of corrective work and/or redesign during the Construction Phase and for a period of one year following the Date of Substantial Completion,, provided that such corrective work and/or redesign did not arise from the negligence of the Design-Builder.
8.2.15 All costs associated with establishing, equipping, operationoperating, maintaining and demobilizing the field office.
8.2.14. Reproduction 8.2.16 Reproductions costs, photographs, cost of telegrams, facsimile transmissions, long distance telephone calls, data processing services, postage, express delivery charges, telephone service at the site Worksite and reasonable xxxxx cash expenses at the field office.
8.2.15. 8.2.17 The premium portion of overtime work ordered by the Owner, including productivity impact costs, other than the that required by the Design-Builder to maintain the current Schedule of Work.
8.2.18 Out of town travel by the Engineer in connection with the Work, except between the Engineer's office, the Design-Builder's office, the Owner's office and the worksite as further described in the Design-Builder's separate contract with the selected Engineer.
8.2.19 All water, power and fuel costs necessary for the Work.
8.2.16. 8.2.20 Cost of removal of all non-hazardous substances, debris and waste materials.
8.2.17. 8.2.21 Costs incurred due to an emergency affecting the safety of persons and/or property.
8.2.18. 8.2.22 Legal, mediation and arbitration fees and costs, other than those arising from disputes between the Owner and the Design-Builder, reasonably and properly resulting from the Design-Builder's performance of the Work.
8.2.23 All costs directly incurred in the performance of the Work or in connection with the Project Project, and not included in the Design-Builder's Fee as set forth in Article 7, which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended results.
Appears in 1 contract
COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.1. The actual wages 8.2.1 Wages paid for labor in the direct employ of the Contractor in the performance of the Work.
8.2.2. The actual salaries 8.2.2 Salaries of Contractor’s 's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of material and equipment, and employees from the principal or branch office performing the functions listed below:on the attached Personnel Schedule. Personnel to be charged in accordance with billing rates listed on the attached Personnel Schedule.
8.2.3. The actual cost 8.2.3 Cost of all employee benefits and taxes including but not limited toto workers' compensation, unemployment compensation, Social Security, health, welfare, retirement and other fringe benefits as required by law, labor agreements, or paid under the Contractor’s 's standard personnel policy, insofar as such costs are paid to employees of the Contractor who are included in the Cost of the Work under Subparagraphs 8.2, 1 8.2.1 and 8.2, Paragraph 28.2.2.
8.2.4. 8.2.4 Reasonable transportation, travel travel, hotel and hotel moving expenses of the Contractor’s 's personnel incurred in direct connection with the Work.
8.2.5. 8.2.5 Cost of all materials, supplies and equipment incorporated in the Work, including costs of inspection, testing, transportation, storage and handling.
8.2.6. 8.2.6 Payments made by the Contractor to Subcontractors for work performed under this Agreement.
8.2.7. 8.2.7 Fees and expenses for design services procured by the Contractor except as provided by the ArchitectA/Engineer E and compensated in Paragraph 7.2.
8.2.8. 8.2.8 Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value; and cost less salvage value on such items used, but not consumed that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged .
8.2.9. 8.2.9 Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the Work, whether rented from the Contractor or others, including installation, repair and replacement, dismantlingdis- mantling, removal, maintenance, transportation and delivery costs at rental charges consistent with those prevailing in the area.
8.2.10. 8.2.10 Cost of the premiums for professional liability all insurance and builder’s risk insurance, as surety bonds which the Contractor is required by Article 11to procure or deems necessary.
8.2.11. 8.2.11 Sales, use, gross receipts or other taxes, tariffs or duties related to the Work for which the Contractor is liable.
8.2.12. 8.2.12 Permits, fees, licenses, tests, except royalties, damages for infringement of patents and/or copyrights, including costs of defending related suits for which the Contractor is not responsible as outlined set forth in Paragraphs 3.3.2Paragraph 3.5, 4.1.2 and Article 5deposits lost for causes other than the Contractor's negligence.
8.2.13. 8.2.13 Losses, expenses or damages to the extent not compensated by insurance or otherwise, and the cost of corrective work during the Construction Phase and for a period of one year following the date of Substantial Completion.
8.2.14 All costs associated with establishing, equipping, operationoperating, maintaining and demobilizing the field office.
8.2.14. 8.2.15 Reproduction costs, photographs, cost of telegrams, facsimile transmissions, long distance telephone calls, data processing services, postage, express delivery charges, telephone service at the site and reasonable xxxxx cash expenses at the field office.
8.2.15. 8.2.16 All water, power and fuel costs necessary for the Work.
8.2.16. 8.2.17 Cost of removal of all non-hazardous nonhazardous substances, debris and waste materials.
8.2.17. 8.2.18 Costs incurred due to an emergency affecting the safety of persons and/or property.
8.2.18. 8.2.19 Legal, mediation and arbitration fees and costs, other than those arising from disputes between the Owner and Contractor, reasonably and properly resulting from the Contractor's performance of the Work.
8.2.20 All costs directly incurred in the performance of the Work or in connection with the Project Project, and not included in the Contractor's Fee as set forth in Article 7, which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended results.
Appears in 1 contract
COST ITEMS FOR CONSTRUCTION PHASE SERVICES. 8.2.1. The actual wages 8.2.1 Wages paid for labor in the direct employ of the Contractor Design-Builder in the performance of the Work.
8.2.2. The actual salaries 8.2.2 Salaries of Contractor’s the Design-Builder's employees when stationed at the field office, in whatever capacity employed, employees engaged on the road expediting the production or transportation of material and equipment, and supervisory employees from the principal or branch office performing the functions listed below:
8.2.3. The actual cost 8.2.3 Cost of all employee benefits and taxes including but not limited toto workers' compensation, unemployment compensation, Social Securitysocial security, health, welfare, retirement and other fringe benefits as required by law, labor agreements, or paid under the Contractor’s Design-Builder's standard personnel policy, insofar as such costs are paid to employees of the Contractor Design-Builder who are included in the Cost of the Work under Subparagraphs 8.2, 1 subsections 8.2.1 and 8.2, Paragraph 28.2.2.
8.2.4. 8.2.4 Reasonable transportation, travel travel, hotel and hotel moving expenses of the Contractor’s Design -Builder's personnel incurred in direct connection with the Work.
8.2.5. 8.2.5 Cost of all materials, supplies and equipment incorporated in the Work, including costs of inspection, testinginspection and testing if not provided by the Owner, transportation, storage and handling.
8.2.6. 8.2.6 Payments made by the Contractor Design-Builder to Subcontractors for work performed under this Agreement.
8.2.7. 8.2.7 Fees and expenses for design services procured or furnished by the Contractor Design -Builder except as provided by the Architect/Engineer Design-Professional and compensated in Paragraph 7.2section 7.1.
8.2.8. 8.2.8 Cost, including transportation and maintenance of all materials, supplies, equipment, temporary facilities and hand tools not owned by the workers that are used or consumed in the performance of the Work, less salvage value or residual value; and cost less salvage value on such items used, but not consumed that remain the property of the Contractor. The Contractor shall reimburse the Owner for the salvage value of items used or salvaged Design-Builder.
8.2.9. 8.2.9 Rental charges of all necessary machinery and equipment, exclusive of hand tools owned by workers, used at the site of the WorkWorksite, whether rented from the Contractor Design-Builder or othersOthers, including installation, repair and replacement, dismantling, removal, maintenance, transportation and delivery costs costs. Rental from unrelated third-parties shall be reimbursed at rental charges consistent with those actual cost. Rentals from the Design-Builder or its affiliates, subsidiaries or related parties shall be reimbursed at the prevailing rates in the arealocality of the Worksite up to eighty-five percent (85%) of the value of the piece of equipment.
8.2.10. 8.2.10 Cost of the premiums for professional liability all insurance and builder’s risk insurancesurety bonds which the Design-Builder is required to procure or deems necessary, and approved by the Owner, including any additional premium incurred as required by Article 11a result of any increase in the GMP.
8.2.11. 8.2.11 Sales, use, gross receipts or other taxes, tariffs or duties related to the Work for which the Contractor Design-Builder is liable.
8.2.12. 8.2.12 Permits, fees, licenses, tests, except as outlined in Paragraphs 3.3.2, 4.1.2 and Article 5royalties.
8.2.13. 8.2.13 Losses, expenses or damages to the extent not compensated by insurance or otherwise, and the cost of corrective work or redesign during the Construction Phase and for a one-year period following the Date of Substantial Completion, provided that such corrective work or redesign did not arise from the Design-Builder’s negligence.
8.2.14 All costs associated with establishing, equipping, operationoperating, maintaining and demobilizing the field office.
8.2.14. 8.2.15 Reproduction costs, photographs, cost of telegrams, facsimile transmissions, long long-distance telephone calls, data processing services, postage, express delivery charges, data transmission, telephone service service, and computer-related costs at the site Worksite, to the extent such items are used and reasonable xxxxx cash expenses at consumed in the field officeperformance of the Work or are not capable of use after completion of the Work.
8.2.15. 8.2.16 All water, power and fuel costs necessary for the Work.
8.2.16. 8.2.17 Cost of removal of all non-hazardous substances, debris and waste materials.
8.2.17. 8.2.18 Costs incurred due to an emergency affecting the safety of persons and/or or property.
8.2.18. 8.2.19 Legal, mediation and arbitration fees and costs, other than those arising from disputes between the Owner and the Design-Builder, reasonably and properly resulting from the Design- Builder's performance of the Work.
8.2.20 All costs directly incurred in the performance of the Work or in connection with the Project Project, and not included in the Design-Builder's Fee as set forth in ARTICLE 7, which are customary for the project location or reasonably inferable from the Contract Documents as necessary to produce the intended resultsDocuments.