Cost Proposals and Acceptance Sample Clauses
Cost Proposals and Acceptance. 3.7.1 ACS shall, within twenty (20) business days of approving AFS’ detailed site requirements, provide a cost estimate and implementation schedule for any work to be performed by ACS. The cost estimate will include an itemized list of all labor, materials, equipment, permits, and any other costs for which AFS will be responsible.
3.7.2 Any work to be performed inside the collocation space may be performed by AFS employees or AFS contractors. Any work associated with the construction or preparation of the collocation space and any work to be performed on ACS property outside the caged or physically separate collocation space shall be performed by ACS or its contractors.
3.7.3 AFS equipment that is collocated in a cageless configuration shall be installed either in cabinets provided by AFS or in relay racks provided by ACS as mutually agreed by AFS and ACS. The installation of AFS equipment in these cabinets or racks, including electronic equipment and metallic and optical digital signal cross-connect panels, shall be performed by AFS employees or ACS approved contractors of AFS or, upon written request by AFS, by ACS or its contractors, at AFS’ expense. Installation of support systems infrastructure, such as relay racks, ladder and cable racks and trays, ceiling supports, intra-office inner-ducts, power and grounding leads, and other post-installation work regarding this equipment, shall be performed by ACS or its contractors, at AFS’ expense. ACS shall provide sufficient cable lengths for AFS to terminate power, grounding and signal cables in its equipment.
Cost Proposals and Acceptance. 3.10.7.1 ACS shall, within twenty (20) business days of approving AFS’ detailed site requirements, provide a cost estimate and implementation schedule for all work to be performed by ACS. The cost estimate will include an itemized list of all labor, materials, equipment, permits, maintenance, repair and any other costs for which AFS will be responsible.
3.10.7.2 Any work to be performed utilizing virtual collocation shall be performed by ACS.
Cost Proposals and Acceptance. 3.9.8.1 ACS shall, within twenty (20) business days of approving AFS’ detailed site requirements, provide a cost estimate and implementation schedule for any work to be performed by ACS. The cost estimate will include an itemized list of all labor, materials, equipment, permits, and any other costs for which AFS will be responsible.
3.9.8.2 Any work to be performed inside the collocation space, where such space is enclosed by a cage or other physical separation, may be performed by AFS employees or AFS contractors. Any work associated with the construction or preparation of the collocation space, and any work to be performed on ACS property outside the collocation space, shall be performed by ACS or its contractors.
Cost Proposals and Acceptance. 3.15.1 ACS-ANC shall, within 20 business days of approving LEVEL 3’s detailed site requirements, provide a cost estimate and implementation schedule for any work to be performed by ACS-ANC. The cost estimate will include an itemized list of all labor, materials, equipment, permits, and any other costs for which LEVEL 3 will be responsible.
3.15.2 Any work to be performed inside the collocation space, where such space is enclosed by a cage or other physical separation, may be performed by ▇▇▇▇▇ ▇ employees or LEVEL 3 contractors. Any work associated with the construction or preparation of the collocation space and any work to be performed on ACS- ANC property outside the collocation space must be performed by ACS-ANC.
Cost Proposals and Acceptance. 3.23.1 ACS-ANC shall, within 20 business days of approving LEVEL 3’s detailed site requirements, provide a cost estimate and implementation schedule for all work to be performed by ACS-ANC. The cost estimate will include an itemized list of all labor, materials, equipment, permits, maintenance, repair and any other costs for which LEVEL 3 will be responsible.
3.23.2 Any work to be performed utilizing virtual collocation shall be performed by ACS-ANC.
