Crop evapotranspiration under extreme weather conditions Sample Clauses

Crop evapotranspiration under extreme weather conditions. Planting date If a simulated future “extreme weather” climate condition (2050+1) is considered (created by adding +1°C to daily temperature of 2050 climate scenario), the following observations on crop cycle length are reported (fig. 11): February Jaunuary 2050+1 late var 2050+1 2050 late_var 2050 2000 December November October 0 50 100 Cycle length (days) 150 200 Fig. 11 – Length of total growing cycle of wheat in Jordan river basin (Jordan) as affected by planting date and variety selection under “present (2000)”, “future (2050)” and “future extreme weather (2050+1)” climate conditions. ‐ with current variety, a further important reduction of the total growing cycle is predicted for quite all planting dates with respect to 2000 and 2050 scenario, because of the further faster accumulation of the required GDD sum; ‐ if a late maturing variety is considered, the total crop cycle length (2050+1 late_var) is partly recovered with respect to present (2000) scenario only in the case of late planting dates (January, February), while it is significantly shortened in all other cases with respect to 2050 late_var and 2000 scenarios. The impact of future “extreme weather” conditions (2050+1) on maximum and effective crop evapotranspiration as well as on net irrigation requirements, also considering the relative effect of selected adaptation strategies (planting dates, variety selection and deficit irrigation strategies), is summarized in the following tables and graphs. In brief, the following observations are reported: ‐ ETc_max is projected to reduce for the current variety under future “extreme weather” (2050+1) scenario as a consequence of the expected further shortening of the crop growing cycle, on average of about ‐9.2% with respect to present conditions (2000); on the contrary, if a late maturing variety (2050+1 late_var) is selected, ETc_max is projected to remain stable or to increase (+2.8% on average) (tab.19); ‐ ETc_max is observed always to increase (in absolute terms) for late (February) planting date with respect to earlier (October) ones, because of the shifting of most of the cycle towards the hotter spring‐summer season (fig. 12 and tab. 19); ‐ the relative effect of the projected variation of rainfall patterns (close to ‐40%) seems to be slightly relevant for the crop water balance, due to their very low absolute values (tab.20); ‐ ETc_eff and NIR are both projected to decrease under 2050+1 scenario if the current variety is used, or again to in...
AutoNDA by SimpleDocs

Related to Crop evapotranspiration under extreme weather conditions

  • INCLEMENT CONDITIONS Section 1.

  • Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:

  • Weather Conditions In the event of temporary suspension of work or during inclement weather or whenever the OWNER shall direct, the CONSTRUCTION MANAGER will, and will cause its Subcontractors to protect carefully its and their work and material against damage or injury from the weather. If, in the opinion of the OWNER, any Work or material shall have been damaged or injured by reason of failure on the part of the CONSTRUCTION MANAGER or any of its Subcontractors so to protect his work, said materials shall be removed and replaced at the expense of the CONSTRUCTION MANAGER.

  • Inclement Weather Days Employees shall not report to work when schools are closed for inclement weather. In an emergency situation (e.g. Board packet day) when an inclement weather closing occurs, an employee(s) may be called in to work if there is a supervisor present in the work location. Said employee(s) shall receive compensatory time off for the time worked.

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • SAFETY CONDITIONS 1.0 The responsibility for providing for safe working conditions that are in conformance with applicable law and which are within fiscal constraints shall be the District’s. Employees shall be responsible for complying with safety procedures and practices and for reporting any unsafe condition, facility, or equipment of which he/she is aware. The District shall be responsible for informing employees of necessary safety procedures and practices. There shall be no reprisal against an employee for reporting any real or potentially unsafe condition, facility, or equipment.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Inclement Weather 24.1 This Inclement Weather clause sets out the full rights, obligations and entitlements of the parties and establishes the conditions under which payment for periods of inclement weather shall be made.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Optional Extended Local Calling Scope Arrangement Traffic (5) special access, private line, Frame Relay, ATM, or any other traffic that is not switched by the terminating Party; (6) Tandem Transit Traffic; (7) Voice Information Service Traffic (as defined in Section 5 of the Additional Services Attachment); or, (8) Virtual Foreign Exchange Traffic (or V/FX Traffic) (as defined in the Interconnection Attachment). For the purposes of this definition, a Verizon local calling area includes a Verizon non-optional Extended Local Calling Scope Arrangement, but does not include a Verizon optional Extended Local Calling Scope Arrangement.

Time is Money Join Law Insider Premium to draft better contracts faster.