Dedication Criteria Sample Clauses

Dedication Criteria. The Planning Commission shall determine the location of sites dedicated to such public uses and the types of uses to which said sites shall be put. In making these determinations, consideration shall be given to the needs of the community in general and of the residents of the proposed subdivision or other land division, correlation with existing and planned sites and facilities dedicated for such public uses, feasibility and practicality of requiring dedication of land, zoning regulations, and compatibility with a comprehensive community development plan or a park and open space plan. (Ord. 407 – 9/5/06)
AutoNDA by SimpleDocs

Related to Dedication Criteria

  • Selection Criteria Each Contract is secured by a new or used Motorcycle. No Contract has a Contract Rate less than 1.00%. Each Contract amortizes the amount financed over an original term no greater than 84 months (excluding periods of deferral of first payment). Each Contract has a Principal Balance of at least $500.00 as of the Cutoff Date.

  • Evaluation Criteria 5.2.1. The responses will be evaluated based on the following: (edit evaluation criteria below as appropriate for your project)

  • Design Criteria A/E shall prepare all work in accordance with the latest version of applicable County’s procedures, specifications, manuals, guidelines, standard drawings, and standard specifications. A/E shall prepare each Plans, Specifications, and Estimates (PS&E) package in a form suitable for letting through County’s construction contract bidding and awarding process.

  • Desirable Selection Criteria Post registration qualification in the area of specialty or evidence of significant progression towards one.

  • Target Population TREATMENT FOR ADULT (TRA) Target Population

  • Development Milestones In addition to its obligations under Paragraph 7.1, LICENSEE specifically commits to achieving (either itself or through the acts of a SUBLICENSEE) the following development milestones in its diligence activities under this AGREEMENT: (a) (b).

  • General Criteria (a) If general criteria are required as part of the Application, only one (1) set shall be completed. General criteria measure the quality of the Land Manager’s overall OHV program. The Applicants shall answer these questions with respect to the entirety of the OHV operation, including all trails and areas available for OHV Recreation, not just specific Projects or Project Areas. (b) General criteria include, but are not limited to, the following: (1) OHV Opportunity and services provided, (2) Agency contribution to the overall cost of managing and delivering the OHV Opportunity, (3) Management of natural and Cultural Resources, (4) Effective education of rules/regulations, and (5) Past performance in completing and administering Xxxxx funded Projects. (c) Non-land manager Applicants required to complete the general criteria shall cooperate with the Land Manager(s) to obtain the information necessary to complete the general criteria section of the Application. Note: Authority cited: Sections 5001.5 and 5003, Public Resources Code. Reference: Sections 5024.1, 5090.32 and 5090.50, Public Resources Code.

  • Project Goals The schedule, budget, physical, technical and other objectives for the Project shall be defined.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Study Population ‌ Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months post enterostomy closure, following enterostomy closure (12-month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 month of overall study duration).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!