Definitive Interconnection System Impact Study. 2.1 Interconnection Customer elects and Transmission Provider shall cause to be performed a Definitive Interconnection System Impact Study Phase One analysis, consistent with Section 8 of the GIP in accordance with the Tariff. 2.2 If the Interconnection Customer elects, Transmission Provider shall cause to be performed a Definitive Interconnection System Impact Study Phase Two analysis, consistent with Section 8. of this GIP in accordance with the Tariff. 2.3 The scope of the Definitive Interconnection System Impact Study shall be subject to the assumptions set forth in Attachment B to this Agreement. 2.4 The Definitive Interconnection System Impact Study will be based upon the technical information provided by Interconnection Customer. Transmission Provider reserves the right to request additional technical information from Interconnection Customer as may reasonably become necessary consistent with Good Utility Practice during the course of the Definitive Interconnection System Impact Study. If Interconnection Customer modifies its designated Point of Interconnection, Interconnection Request, or the technical information provided therein is modified, the time to complete the Definitive Interconnection System Impact Study may be extended. 2.5 The Definitive Interconnection System Impact Study report shall provide the following information: (i) identification of any circuit breaker short circuit capability limits exceeded as a result of the interconnection; (ii) identification of any thermal overload or voltage limit violations resulting from the interconnection; (iii) identification of any instability or inadequately damped response to system disturbances resulting from the interconnection; (iv) description and non-binding, good faith estimated cost of and schedule for facilities required to interconnect the Generating Facility to the Transmission System and to address the identified short circuit, instability, and power flow issues; and (v) will include a Facilities Analysis as specified in Section 8.4.4 of the GIP that will provide cost estimates for Transmission Owner’s Interconnection Facilities and Network Upgrades at the Point of Interconnection.
Appears in 7 contracts
Samples: Generator Interconnection Study Agreement, Generator Interconnection Study Agreement, Generator Interconnection Study Agreement