Delivery Point Pressure Sample Clauses

Delivery Point Pressure. (a) Service Provider will maintain Pipeline System pressures so that the delivery pressure at a Delivery Point does not:
AutoNDA by SimpleDocs
Delivery Point Pressure. Delivery point pressure from Niagara Mohawk shall be between three hundred forty (340) psig minimum and three hundred eighty (380) psig maximum.
Delivery Point Pressure 

Related to Delivery Point Pressure

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Delivery Pressure Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Electricity 14.01 Tenant shall obtain electricity for the Demised Premises on a direct meter basis, Tenant shall be responsible for and pay to the applicable utility all charges for electricity as measured by such meter. Landlord shall not in any way be liable or responsible to Tenant for any loss or damage or expense which Tenant may sustain or incur if either the quantity or character of electric service is changed or is no longer available or suitable for Tenant’s requirements. Any additional riser or risers to supply Tenant’s electrical requirements, upon written request to Tenant, will be installed by Landlord, at the sole cost and expense of Tenant, unless, in Landlord’s reasonable judgment, the same will cause permanent damage or injury to the Building or the Demised Premises or cause or create a dangerous or hazardous condition or interfere with or disturb other tenants or occupants. In addition to the installation of such riser or risers, Landlord will also at the sole cost and expense of Tenant, install all other equipment proper and necessary in connection therewith subject to the aforesaid terms and conditions. Tenant covenants and agrees that at all times its use of electric current shall never exceed the capacity of the feeders to the Building or the risers or wiring installation which Landlord represents is sufficient for ordinary office use. It is further covenanted and agreed by the Tenant that all the aforesaid costs and expenses are chargeable and collectible as Additional Rent and shall be paid by the Tenant to the Landlord within ten (10) days after the rendering of any xxxx or statement to the Tenant therefor. Tenant shall make no alterations or additions to the electric equipment and/or appliances without the prior written consent of Landlord in each instance, which consent shall not be unreasonably withheld, conditioned or delayed. Notwithstanding anything to the contrary herein, should electric service be interrupted for a period of more than five (5) consecutive business days through the sole fault of Landlord so as to prevent Tenant from using at least seventy-five (75%) percent of the Demised Premises, Fixed Rent shall xxxxx until such service resumes and Tenant is able to resume the use of at least seventy-five (75%) percent of the Demised Premises. Should such service interruption prevent Tenant from using at least seventy-five (75%) of the Demised Premises for more than sixty (60) days and be due to the sole fault of Landlord, Tenant shall have the right to terminate this Lease by giving written notice to Landlord no later than the seventieth (70th) consecutive day and vacating no later than the ninetieth (90th) consecutive day. TIME BEING OF THE ESSENCE for Tenant as to both dates.

  • Delivery Location All Goods shall be delivered to the address specified in this Order (the "Delivery Location") during Buyer's normal business hours or as otherwise instructed by Buyer.

  • PRODUCER Provide the producer’s name, address (including country), e-mail address, and telephone number, if different from the certifier or exporter or, if there are multiple producers, state “Various” or provide a list of producers. A person who wishes for this information to remain confidential may state “Available upon request by the importing authorities”. The address of a producer shall be the place of production of the good in a Party’s territory.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.