Demonstration requirements Sample Clauses

Demonstration requirements. A demonstration of the selected devices/equipment/solution for FHSU may be required before final contract approval. FHSU reserves the right to request said devices/equipment/solution fully configured/operational for testing, which shall be furnished at no expense to FHSU within ten (10) days after receipt of request. Devices/equipment will be returned at the bidder’s expense if found to be non-compliant with the specifications as set forth in this RFP.
AutoNDA by SimpleDocs
Demonstration requirements. 11.1. The compliance to the requirements of this annex shall be demonstrated during type-approval by performing: (a) A demonstration of the operator warning system activation; (b) A demonstration of the operator inducement system activation. 11.2. Demonstration of the operator warning system activation. 11.2.1. The compliance of the warning system activation shall be demonstrated by performing two tests: lack of reagent, and one failure category considered in paragraphs 8. to 10. of this annex. 11.2.2. For the purpose of demonstrating the activation of the warning system in case of a wrong reagent quality, a reagent shall be selected with a dilution of the active ingredient at least as dilute as that communicated by the manufacturer (CDmin) according to the requirements of paragraph 8.2. of this annex 11.2.3. For the purpose of demonstrating the activation of the operator warning system, the selection shall be performed on the basis of a list of potential failures provided by the REC manufacturer to the Type Approval Authority, and agreed by the Type Approval Authority. 11.2.4. For the purpose of this demonstration, a separate test shall be performed for each of the failures considered in paragraph 11.2.1. of this annex. 11.2.5. During a test, no failure shall be present other than the one addressed by the test. 11.2.6. Prior to starting a test, all failure messages shall have been erased. 11.2.7. At the request of the manufacturer, and with the agreement of the Type Approval Authority, the failures subject to testing may be simulated. 11.2.8. Demonstration test procedure for failures other than lack of reagent 11.2.8.1. Once the failure has been installed or simulated, the NCD system shall respond to the introduction of a failure within three consecutive hot WHTC or hot NRTC cycles, as applicable. 11.2.8.2. Each individual test cycle in the demonstration test may be separated by an engine shut-off. 11.2.9. Demonstration test procedure in case of lack of reagent 11.2.9.1. The REC system shall be operated over one or more hot WHTC or hot NRTC cycles, as applicable, at the discretion of the REC manufacturer. 11.2.9.2. The demonstration shall start with a level of reagent in the tank to be agreed between the REC manufacturer and the Type Approval Authority but representing not less than 10 per cent of the nominal capacity of the tank. 11.2.10. The demonstration of the warning system activation is deemed to be accomplished if, at the end of each demonstration ...
Demonstration requirements. 6.1. Dual-fuel engines shall be subject to the laboratory tests specified in Table 1. Table 1 Laboratory tests to be performed by a dual-fuel engine Type 1A Type 1B Type 2A Type 2B Type 3B WHTC NMHC; CH4; CO; NOx; PM; PN; NH3 Dual-fuel mode: NMHC; CH4; CO; NOx; PM; PN; XX0 XXX; NMHC; CH4; CO; NOx; PM; PN; NH3 Dual-fuel mode: THC; NMHC; CH4; CO; NOx; PM; PN; XX0 XXX; CO; NOx; PM; PN; NH3 Diesel mode: THC; CO; NOx; PM; PN; NH3 Diesel mode: THC; CO; NOx; PM; PN; XX0 XXXX no test Dual-fuel mode: no test NMHC; CO; NOx; PM; PN; NH3 Dual-fuel mode: NMHC; CO; NOx; PM; PN; XX0 XXX; CO; NOx; PM; PN; NH3 Diesel mode: THC; CO; NOx; PM; PN; NH3 Diesel mode: THC; CO; NOx; PM; PN; XX0 XXXX laboratory test no test Dual-fuel mode: no test [HC]; CO; NOx; PM Dual-fuel mode: [HC]; CO; NOx; PM THC; CO; NOx; PM Diesel mode: THC; CO; NOx; PM Diesel mode: THC; CO; NOx; PM 6.2. Demonstrations in case of installation of type-approved HDDF engines In addition to the requirements of this Regulation related to the installation of an engine that is type-approved as separate technical unit, a demonstration of the correct installation on a vehicle of a dual-fuel engine shall be done on the basis of appropriate elements of design, results of verification tests, etc. It shall address the conformity of the following elements to the requirements of this annex: (a) The dual-fuel indicators and warnings as specified in this annex (pictogram, activation schemes, etc.); (b) The fuel storage system; (c) The performance of the vehicle in service mode. Correct indicator illumination and warning system activation will be checked. But any check shall not force dismounting the engine system (e.g. an electric disconnection may be selected). 6.3. Demonstration requirements in case of a Type 2 engine 1. (for example, through algorithms, functional analyses, calculations, simulations, results of previous tests, etc.). 6.4. Additional demonstration requirements in case of a universal fuel range type- approval On request of the manufacturer and with approval of the Type Approval Authority, a maximum of two times the last 10 minutes of the WHTC may be added to the adaptation run between the demonstration tests. 6.5. Requirements for demonstrating the durability of a dual-fuel engine Provisions of Annex 7 shall apply.
Demonstration requirements. The technical service shall select random load and speed points within the control area for testing. For engines subject to paragraph 5. 6.2.1. up to three points shall be selected. For engines subject to paragraph 5. 6.2.2. one point shall be selected. The technical service shall also determine a random running order of the test points. The test shall be run in accordance with the principal requirements of the NRSC, but each test point shall be evaluated separately.
Demonstration requirements. A demonstration of the selected devices/equipment/solution for the using state agencies may be required before final contract approval. The University of Kansas Medical Center reserves the right to request said devices/equipment/solution fully configured/operational for testing, which shall be furnished at no expense to the University within ten (10) days after receipt of request. Devices/equipment will be returned at the bidder’s expense if found to be non‐compliant with the specifications as set forth in this proposal.
Demonstration requirements. All craftsmen are required to demonstrate their craft while participating in the Harvest Celebration. Demonstration may be a combination of actually Creating an item and talking to guest about how the item is made. This Practice helps increase sales and meets our Guest Excellence expectations.
Demonstration requirements. The Technical Service shall select up to three random load and speed points within the control area for testing. The technical service shall also determine a random running order of the test points. The test shall be run in accordance with the principal requirements of the NRSC, but each test point shall be evaluated separately. Each test point shall meet the limit values defined in paragraph 5.3.5.
AutoNDA by SimpleDocs

Related to Demonstration requirements

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. b) Electric panel schedules must be brought up to date identifying all new circuits added. c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. iii) The Building Engineer will inspect the construction on a periodic basis as well. j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;

  • Information Requirement The successful bidder's shall be required to advise the Office of Management and Budget, Government Support Services of the gross amount of purchases made as a result of the contract.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!