DESIGN ANALYSES Sample Clauses

DESIGN ANALYSESThe Contractor shall perform comprehensive analyses and studies which shall demonstrate the integrity of the spacecraft and conformance to its specifications, including interface specifications. The analyses required to be delivered are defined in the CDRL. Xxxxxxx shall be demonstrated and quantified for all modes of operations and environmental exposures from fabrication and tests on the ground through to the end of orbit lifetime. Analyses and studies which have been conducted previously may be provided to cover equipment and subsystems which have been developed and qualified for previous programmes, and which, therefore, do not require requalification for this programme; however, the Contractor shall be responsible for providing an adequate technical rationale to support his claims of prior qualification or qualification by similarity with reference to the Inmarsat technical requirements. Design analyses, drawings and study reports shall be updated by the Contractor as new information becomes available during the contract period, and shall be made available to Inmarsat as issued.

Related to DESIGN ANALYSES

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Quantitative Analysis Quantitative analysts develop and apply financial models designed to enable equity portfolio managers and fundamental analysts to screen potential and current investments, assess relative risk and enhance performance relative to benchmarks and peers. To the extent that such services are to be provided with respect to any Account which is a registered investment company, Categories 3, 4 and 5 above shall be treated as “investment advisory services” for purposes of Section 5(b) of the Agreement.”

  • Risk Analysis The Custodian will provide the Fund with a Risk Analysis with respect to Securities Depositories operating in the countries listed in Appendix B. If the Custodian is unable to provide a Risk Analysis with respect to a particular Securities Depository, it will notify the Fund. If a new Securities Depository commences operation in one of the Appendix B countries, the Custodian will provide the Fund with a Risk Analysis in a reasonably practicable time after such Securities Depository becomes operational. If a new country is added to Appendix B, the Custodian will provide the Fund with a Risk Analysis with respect to each Securities Depository in that country within a reasonably practicable time after the addition of the country to Appendix B.

  • Sampling and Analysis The Seller has sole responsibility for quality control of the coal and shall forward its “as loaded” quality to the Buyer as soon as possible. The sampling and analysis of the coal delivered hereunder shall be performed by Buyer and the results thereof shall be accepted and used for the quality and characteristics of the coal delivered under this Agreement. All analyses shall be made in Buyer’s laboratory at Buyer’s expense in accordance with ASTM standards where applicable, or using standards mutually acceptable to both parties. Samples for analyses shall be taken by any ASTM standards or standards mutually acceptable to both parties, and may be composited and shall be taken with a frequency and regularity sufficient to provide reasonably accurate representative samples of the deliveries made hereunder. Seller represents that it is familiar with Buyer’s sampling and analysis practices, and finds them to be acceptable. Buyer shall notify Seller in writing of any significant changes in Buyer’s sampling and analysis practices. Any such changes in Buyer’s sampling and analysis practices shall, except for ASTM or mutually agreeable changes in practices, provide for no less accuracy than the sampling and analysis practices existing at the time of the execution of this Agreement, unless the Parties otherwise mutually agree. (1) part shall be used for analysis by Buyer; one (l) part shall be used by Buyer as a check sample, if Buyer in its sole judgment determines it is necessary; one (1) part shall be retained by Buyer (LG&E) until the twenty-fifth (25th) of the month following the month of unloading (the “LG&E Disposal Date”) or Buyer (KU) until thirty (30) days after the sample is taken (the “KU Disposal Date”), the LG&E Disposal Date and the KU Disposal Date are collectively the “Disposal Date”), and shall be delivered to Seller for analysis if Seller so requests before the Disposal Date; and one part (“Referee Sample”) shall be retained by Buyer until the Disposal Date. Seller shall be given copies of all analyses made by Buyer by the tenth (10th) business day of the month following the month of unloading. Seller, on reasonable notice to Buyer shall have the right to have a representative present to observe the sampling and analyses performed by Buyer. Unless Seller requests a Referee Sample analysis before the Disposal Date, Buyer’s analysis shall be used to determine the quality of the coal delivered hereunder. The Monthly Weighted Averages shall be determined by utilizing the individual shipment analyses. If any dispute arises before the Disposal Date, the Referee Sample retained by Buyer shall be submitted for analysis to an independent commercial testing laboratory (“Independent Lab”) mutually chosen by Buyer and Seller. For each coal quality specification in question, a dispute shall be deemed not to exist and Buyer’s analysis shall prevail and the analysis of the Independent Lab shall be disregarded if the analysis of the Independent Lab differs from the analysis of Buyer by an amount equal to or less than: (i) 0.50% moisture (ii) 0.50% ash on a dry basis (iii) 100 Btu/lb. on a dry basis (iv) 0.10% sulfur on a dry basis. For each coal quality specification in question, if the analysis of the Independent Lab differs from the analysis of Buyer by an amount more than the amounts listed above, then the analysis of the Independent Lab shall prevail and Buyer’s analysis shall be disregarded. The cost of the analysis made by the Independent Lab shall be borne by Seller to the extent that Buyer’s analysis prevails and by Buyer to the extent that the analysis of the Independent Lab prevails.

  • Special Analyses It is hereby certified that these regulations will not have a significant economic impact on a substantial number of small entities. This certification is based on the fact that it is unlikely that a substantial number of small entities will hold REMIC residual interests. Therefore, a Regulatory Flexibility Analysis under the Regulatory Flexibility Act (5 U.S.C. chapter 6) is not required. It has been determined that this Treasury decision is not a significant regulatory action as defined in Executive Order 12866. Therefore, a regulatory assessment is not required. It also has been determined that sections 553(b) and 553(d) of the Administrative Procedure Act (5 U.S.C. chapter 5) do not apply to these regulations. The principal author of these regulations is Xxxxxxxx Xxxxxxxxxx. However, other personnel from the IRS and Treasury Department participated in their development. 26 CFR Part 1 Income taxes, Reporting and record keeping requirements.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Design and Drawings (i) Design and Drawings shall be developed in conformity with the Specifications and Standards set forth in Schedule-D. In the event, the Contractor requires any relaxation in design standards due to restricted Right of Way in any section, the alternative design criteria for such section shall be provided for review and approval of the Authority’s Engineer. (ii) The Contractor shall appoint a proof check consultant (the “Proof Consultant”) after proposing to the Authority a panel of three (3) names of qualified and experienced firms from whom the Authority may choose one (1) to be the Proof Consultant. Provided, however, that if the panel is not acceptable to the Authority and the reasons for the same are furnished to the Contractor, the Contractor shall propose to the Authority a revised panel of three (3) names from the firms empanelled as proof consultants by the [Ministry of Road Transport and Highways] for obtaining the consent of the Authority. The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively. The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant. (iii) The Proof Consultant shall: (a) evolve a systems approach with the Design Director so as to minimise the time required for final designs and construction drawings; and (b) proof check the detailed calculations, drawings and designs, which have been approved by the Design Director. (iv) In respect of the Contractor’s obligations with respect to the design and Drawings of the Project Highway as set forth in Schedule-I, the following shall apply: (a) The Contractor shall prepare and submit, with reasonable promptness and in such sequence as is consistent with the Project Completion Schedule, three (3) copies each of the design and Drawings, duly certified by the Proof Consultant, to the Authority’s Engineer for its approval. Provided, however, that in respect of Major Xxxxxxx and Structures, the Authority’s Engineer may require additional drawings for approval in accordance with Good Industry Practice. (b) by submitting the Drawings for review and approval to the Authority’s Engineer, the Contractor shall be deemed to have represented that it has determined and verified that the design and engineering, including field construction criteria related thereto, are in conformity with the Scope of the Project, the Specifications and Standards and the Applicable Laws; (c) within 15 (fifteen) days of the receipt of the Drawings, the Authority’s Engineer shall review the same and convey its approval/observations to the Contractor with particular reference to their conformity or otherwise with the Scope of the Project and the Specifications and Standards. Provided, however that in case of a major bridge or structure, the aforesaid period of 15 (fifteen) days may be extended up to 30 (thirty) days; (d) if the aforesaid observations of the Authority’s Engineer indicate that the Drawings are not in conformity with the Scope of the Project or the Specifications and Standards, such Drawings shall be revised by the Contractor in conformity with the provisions of this Agreement and resubmitted to the Authority’s Engineer for review and approval. The Authority’s Engineer shall give its observations, if any, within 10 (ten) days of receipt of the revised Drawings. In the event the Contractor fails to revise and resubmit such Drawings to the Authority’s Engineer for review/approval as aforesaid, the Authority’s Engineer may withhold the payment for the affected works in accordance with the provisions of Clause 19.5 (iv). If the Contractor disputes any decision, direction or determination of the Authority’s Engineer hereunder, the Dispute shall be resolved in accordance with the Dispute Resolution Procedure; (e) no review/approval and/or observation of the Authority’s Engineer and/or its failure to review/approval and/or convey its observations on any Drawings shall relieve the Contractor of its obligations and liabilities under this Agreement in any manner nor shall the Authority’s Engineer or the Authority be liable for the same in any manner; and if errors, omissions, ambiguities, inconsistencies, inadequacies or other Defects are found in the Drawings, they and the construction works shall be corrected at the Contractor's cost, notwithstanding any approval under this Article 10; (f) the Contractor shall be responsible for delays in submitting the Drawing as set forth in Schedule-I caused by reason of delays in surveys and field investigations, and shall not be entitled to seek any relief in that regard from the Authority; and (g) the Contractor warrants that its designers, including any third parties engaged by it, shall have the required experience and capability in accordance with Good Industry Practice and it shall indemnify the Authority against any damage, expense, liability, loss or claim, which the Authority might incur, sustain or be subject to arising from any breach of the Contractor’s design responsibility and/or warranty set out in this Clause. (h) the Contractor shall ensure that all the designs and drawings shall be approved from the Authority’s Engineer within 90 days (ninety) from the Appointed Date. (v) Any cost or delay in construction arising from review/approval by the Authority’s Engineer shall be borne by the Contractor. (vi) Works shall be executed in accordance with the Drawings provided by the Contractor in accordance with the provisions of this Clause 10.2 and the approval of the Authority’s Engineer thereon as communicated pursuant to the provisions of sub- Clause (c) & (d) of Clause 10.2 (iv). Such Drawings shall not be amended or altered without prior written notice to the Authority’s Engineer. If a Party becomes aware of an error or defect of a technical nature in the design or Drawings, that Party shall promptly give notice to the other Party of such error or defect. (vii) Within 90 (ninety) days of the Project Completion Date, the Contractor shall furnish to the Authority and the Authority’s Engineer a complete set of as- built Drawings, in 2 (two) hard copies and in micro film form or in such other medium as may be acceptable to the Authority, reflecting the Project Highway as actually designed, engineered and constructed, including an as-built survey illustrating the layout of the Project Highway and setback lines, if any, of the buildings and structures forming part of Project Facilities.

  • Design Review ‌ (a) Where so specified in Schedule A (Scope of Goods and Services) or as otherwise instructed by the City, the Supplier shall submit design-related Documentation for review by the City, and shall not proceed with work on the basis of such design Documentation until the City’s approval of such Documentation has been received in writing. (b) None of: (i) the submission of Documentation to the City by the Supplier; (ii) its examination by or on behalf of the City; or (iii) the making of any comment thereon (including any approval thereof) shall in any way relieve the Supplier of any of its obligations under this Agreement or of its duty to take reasonable steps to ensure the accuracy and correctness of such Documentation, and its suitability to the matter to which it relates.

  • Technology Research Analyst Job# 1810 General Characteristics

  • Escrow Analysis If applicable, with respect to each Mortgage Loan, the Seller has within the last twelve months (unless such Mortgage was originated within such twelve month period) analyzed the required Escrow Payments for each Mortgage and adjusted the amount of such payments so that, assuming all required payments are timely made, any deficiency will be eliminated on or before the first anniversary of such analysis, or any overage will be refunded to the Mortgagor, in accordance with RESPA and any other applicable law;