DESIGN STANDARD SELECTION Sample Clauses

DESIGN STANDARD SELECTION. The matrix below shows which design standards are applicable for certain projects based on project type, and if the project involves a state route or not. These design standards when used with an appropriate design speed are the criteria for whether an exception shall be required for a project. There are two levels of exceptions for projects. The first level is an exception to the ODOT specific standards for all projects located on a state highway The second level of exceptions apply to all projects which are federally funded. This would be either an exception to AASHTO Design Standards in the case of certain New/Reconstruction projects, or exceptions to A Policy on Design Standards-Interstate System for 3-R projects. See Section 5.0 for further information concerning design exceptions. TABLE 4-1 DESIGN STANDARDS SELECTION MATRIX Highway Type of Work New/Reconstruction 3-R State Routes Includes Interstate Primary & Secondary ODOT ODOT 3-R Local Agency Routes City County or Other Responsibility AASHTO See Note Below: ODOT 3-R See Note Below:
AutoNDA by SimpleDocs

Related to DESIGN STANDARD SELECTION

  • Design Standards Most recent edition of the “Owner’s Design Standards,” including any partial updates as may be directed by the Owner.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Design Criteria and Standards All PROJECTS/SERVICES shall be performed in accordance with instructions, criteria and standards set forth by the DIRECTOR.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Initial Trunk Forecast Requirements At least ninety (90) days before initiating interconnection in a LATA, Emergency shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Ownership of Drawings and Specifications All Drawings, Specifications and copies thereof furnished by the A/E are to remain A/E’s property. These documents are not to be used on any other project, and with the exception of one contract set for each party to the Contract, are to be returned to the A/E, upon request, following completion of the Work.

  • Maintenance Standards Unless otherwise authorized by the CRC Board, the General Manager shall prepare and submit to the CRC Board proposals (including the Program Maintenance plan submitted pursuant to Section 5(b)) for the performance of such Routine Maintenance and Program Maintenance as is reasonably necessary to keep and maintain the Shared Assets substantially in their condition as of the date of this Agreement. If the CRC Board fails either to approve or disapprove by majority vote any such proposal within 45 days after it was submitted to the CRC Board, the disagreement over the propriety or need for any of the Routine Maintenance or Program Maintenance included in such proposal may be submitted by either Operator for resolution by binding arbitration pursuant to Section 13.

  • Design Guidelines The Owner’s “Design Guidelines” are as published on the Owner’s website (xxxx://xxxxx.xxxxx.xxx/for-vendors/design-guidelines/). In addition to providing a guide to be used in the preparation of design documents for the Owner’s construction projects, the Design Guidelines also contain regulatory code compliance and other Owner requirements. The “Effective Date” (as noted in Section 2.7 of the Design Guidelines), determining which edition will be used for a given project, is set at the beginning of Design Development and will govern the preparation of construction documents for the project unless noted otherwise. Compliance with the Design Guidelines does not relieve the Design Professional from any of its responsibility.