Information Request The Owner Trustee shall provide any information regarding the Issuer in its possession reasonably requested by the Servicer, the Administrator, the Seller or any of their Affiliates, in order to comply with or obtain more favorable treatment under any current or future law, rule, regulation, accounting rule or principle.
Interconnection Request The Interconnection Customer’s request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to materially increase the capacity of, or make a material modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the New York State Transmission System or the Distribution System. For the purposes of this Agreement, this definition of Interconnection Request shall supersede the definition of Interconnection Request set out in Attachment X to the ISO OATT. Interconnection Study – Any study required to be performed under Sections 32.2 or 32.3 of the SGIP. Material Modification – A modification that has a material impact on the cost or timing of any Interconnection Request with a later queue priority date. New York State Transmission System – The entire New York State electric transmission system, which includes: (i) the Transmission Facilities under ISO Operational Control; (ii) the Transmission Facilities Requiring ISO Notification; and (iii) all remaining transmission facilities within the New York Control Area. NYISO Deliverability Interconnection Standard – The standard that must be met, unless otherwise provided for by Attachment S to the ISO OATT, by (i) any generation facility larger than 2MW in order for that facility to obtain XXXX; (ii) any Class Year Transmission Project proposing to interconnect to the New York State Transmission System and receive Unforced Capacity Delivery Rights; (iii) any entity requesting External XXXX Rights, and (iv) any entity requesting a XXXX transfer pursuant to Section 25.9.5 of Attachment S to the ISO OATT. To meet the NYISO Deliverability Interconnection Standard, the Interconnection Customer must, in accordance with the rules in Attachment S to the ISO OATT, fund or commit to fund any System Deliverability Upgrades identified for its project in the Class Year Deliverability Study. NYISO Minimum Interconnection Standard – The reliability standard that must be met by any generation facility or Class Year Transmission Project that is subject to NYISO’s Large Facility Interconnection Procedures in Attachment X to the ISO OATT or the NYISO’s Small Generator Interconnection Procedures in this Attachment Z, that is proposing to connect to the New York State Transmission System or Distribution System, to obtain ERIS. The Minimum Interconnection Standard is designed to ensure reliable access by the proposed project to the New York State Transmission System or to the Distribution System. The Minimum Interconnection Standard does not impose any deliverability test or deliverability requirement on the proposed interconnection. Operating Requirements – Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards. Party or Parties – The NYISO, Connecting Transmission Owner, Interconnection Customer or any combination of the above. Point of Interconnection – The point where the Interconnection Facilities connect with the New York State Transmission System or the Distribution System. Reasonable Efforts – With respect to an action required to be attempted or taken by a Party under this Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer’s facility, no larger than 20 MW for the production and/or storage for later injection of electricity identified in the Interconnection Request if proposing to interconnect to the New York State Transmission System or Distribution System, but shall not include (i) facilities proposing to simply receive power from the New York State Transmission System or the Distribution System; (ii) facilities proposing to interconnect to the New York State Transmission System or the Distribution System made solely for the purpose of generation with no wholesale sale for resale nor to net metering; (iii) facilities proposing to the New York State Transmission System or the Distribution System made solely for the purpose of net metering; (iv) facilities proposing to interconnect to LIPA’s distribution facilities; and (v) the Interconnection Customer’s Interconnection Facilities. A facility will be treated as a single Small Generating Facility if all units within the facility are behind a single facility meter, even if such units are different technology types. System Deliverability Upgrades – The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard for Capacity Resource Interconnection Service. System Upgrade Facilities – The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modification or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff – The NYISO’s Open Access Transmission Tariff, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Interconnection Customer is engaged in on- site test operations and commissioning of the Small Generating Facility prior to Commercial Operation. Upgrades – The required additions and modifications to the Connecting Transmission Owner’s portion of the New York State Transmission System or the Distribution System at or beyond the Point of Interconnection. Upgrades may be System Upgrade Facilities or System Deliverability Upgrades Distribution Upgrades. Upgrades do not include Interconnection Facilities.
Information Requests The parties hereto shall provide any information reasonably requested by the Servicer, the Issuer, the Seller or any of their Affiliates, in order to comply with or obtain more favorable treatment under any current or future law, rule, regulation, accounting rule or principle.
Certification Requirements The applicant will provide Vista Laboratories, Inc. with all product information for the evaluation of the product to be certified and warrant that the information provided is accurate and complete so that Vista Labs may perform the services requested. If the product was tested at an external laboratory, the applicant must provide the complete test report to Vista Labs. If the external testing facility is not ISO 17025 accredited, or does not have the proper scope, Vista Labs must determine if the test report can be used for certification activities. The applicant’s information is used to perform a product review and evaluation to determine the product’s compliance to the specific certification requested. Throughout the process, the client agrees to make claims regarding certification consistent with the scope of certification. The applicant agrees to supply the required number of product samples, to be determined by Vista Labs, to the laboratory for testing, measurement, and evaluation purposes. The client understands that certain tests may damage or destroy the sample and acknowledge that Vista Labs is not responsible for such damages. Samples will be returned only upon request by the applicant and at the applicant’s expense, after the completion of certification. Samples will be disposed of after six months if not requested for return by applicant. The product is ineligible for certification if it has been modified by the client after testing or certification. Changes to the product must be approved by Vista Laboratories. Vista Labs reserves the right to re- evaluate the product as a result of information that raises questions concerning the conformance of the product. Certified products maintain fulfilment of product requirements if the certification applies to ongoing production. If the client provides copies of the certification documents to other parties, the documents are reproduced in their entirety, or as specified in the certification scheme. In making reference to its product certification in media, such as brochures or advertisement, the client complies with the requirements of the Vista Labs or as specified by the certification scheme. The client complies with any requirements that may be prescribed in the certification scheme relating to the use of marks of conformity, and on all product correspondences and product related information. Vista Labs reserves the right to revise or withdraw the requirements as required in order to maintain conformance with FCC rules and regulations governing the product. The product may continue with certification and receive certification upon demonstration of compliance with the revised requirements, to the satisfaction of Vista Laboratories.
Payment Cancellation Requests You may cancel or edit any Scheduled Payment (including recurring payments) by following the directions within the portion of the Site through which the Service is offered. There is no charge for canceling or editing a Scheduled Payment. Once the Service has begun processing a payment it cannot be cancelled or edited, therefore a stop payment request must be submitted.
Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.
Satisfaction Requirement If any agreement, certificate or other writing, or any action taken or to be taken, is by the terms of this Agreement required to be satisfactory to any Purchaser, to any holder of Notes or to the Required Holder(s), the determination of such satisfaction shall be made by such Purchaser, such holder or the Required Holder(s), as the case may be, in the sole and exclusive judgment (exercised in good faith) of the Person or Persons making such determination.
Completion of a Utilisation Request (a) Each Utilisation Request is irrevocable and will not be regarded as having been duly completed unless: (i) the proposed Utilisation Date is a Business Day within the Availability Period; (ii) the currency and amount of the Utilisation comply with Clause 5.3 (Currency and amount); and (iii) the proposed Interest Period complies with Clause 9 (Interest Periods). (b) Only one Loan may be requested in each Utilisation Request.
Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Conversion Request A notice given by the Borrower to the Agent of its election to convert or continue a Loan in accordance with §2.5.