Differential Response Family Advocate Sample Clauses

Differential Response Family Advocate 
AutoNDA by SimpleDocs

Related to Differential Response Family Advocate

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Timely and Sustained Response Interconnection Customer shall ensure that the Small Generating Facility’s real power response to sustained frequency deviations outside of the deadband setting is automatically provided and shall begin immediately after frequency deviates outside of the deadband, and to the extent the Small Generating Facility has operating capability in the direction needed to correct the frequency deviation. Interconnection Customer shall not block or otherwise inhibit the ability of the governor or equivalent controls to respond and shall ensure that the response is not inhibited, except under certain operational constraints including, but not limited to, ambient temperature limitations, physical energy limitations, outages of mechanical equipment, or regulatory requirements. The Small Generating Facility shall sustain the real power response at least until system frequency returns to a value within the deadband setting of the governor or equivalent controls. An Applicable Reliability Standard with equivalent or more stringent requirements shall supersede the above requirements.

  • PROFESSIONAL RESPONSIBILITY (APPLIES TO RNS ONLY 19.01 The parties agree that resident care is enhanced if concerns relating to professional practice and workload are resolved in a timely and effective manner, as set out below; In the event that the Home assigns a number of residents or a workload to an individual employee or group of employees, such that she or they have cause to believe that she or they are being asked to perform more work than is consistent with proper resident care, she or they shall:

  • Firm Response The Department should make an award within sixty (60) days after the date of the opening, during which period responses shall remain firm and shall not be withdrawn. If award is not made within sixty (60) days, the response shall remain firm until either the Department awards the Contract or the Department receives from the bidder written notice that the response is withdrawn. Any response that expresses a shorter duration should, in the Department's sole discretion, be accepted or rejected.

  • Professional Responsibility (Article 8.01 applies to employees covered by an Ontario College under the Regulated Health Professions Act only.)

  • REQUIRED PRICE PROPOSAL RESPONSE All pricing must be fixed cost, inclusive of all expenses and fees if this Statement of Work proposal is for a fixed price agreement. (Remove if Time and Materials agreement) For Time and Materials the pricing proposal must include estimated effort hours, hourly rate for proposed personnel, projected timeline, including timing expectations for the State functional and technical resources and be submitted as a separate document from the rest of the proposal. (Remove if not Time and Materials)

  • Incident Response Operator shall have a written incident response plan that reflects best practices and is consistent with industry standards and federal and state law for responding to a data breach, breach of security, privacy incident or unauthorized acquisition or use of any portion of Data, including PII, and agrees to provide LEA, upon request, an executive summary of the written incident response plan.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Personal Responsibility The Participant and his/her parent(s) or legal guardian(s) certify that Participant has no physical or mental condition that precludes him/her from participating in the Activities and that he/she is not participating against medical advice. The Participant and his/her parent(s) or legal guardian(s) understand that Participant’s participation in the Activities is voluntary and further understand that they have the opportunity to inspect the Host’s Equipment and facilities before any participation. The Participant and his/her parent(s) or legal guardian(s) understand that Participant is obligated to follow the rules of the Activities and that he/she can minimize his/her risk of injury by doing so and through the exercise of common sense and by being aware of his/her surroundings. If, while participating in the Activities, the Participant or his/her parent(s) or legal guardian(s) observe any unusual hazard or condition, which they believe jeopardizes Participant’s personal safety or that of others, Participant and/or his/her parent(s) or legal guardian(s) will remove Participant from participation in the Activities and immediately bring said hazard or condition to the attention of the Host. FORM 1512 (0115) General Waiver A – Page 1 To the extent that any portion of this Agreement is deemed to be invalid under the law of the applicable jurisdiction, the remaining portions of the Agreement shall remain binding and available for use by the Host and its counsel in any proceeding. I HAVE READ AND UNDERSTAND THIS AGREEMENT AND I AM AWARE THAT BY SIGNING THIS AGREEMENT I MAY BE WAIVING CERTAIN LEGAL RIGHTS, INCLUDING THE RIGHT TO SUE. Participant’s Name (Printed): Participant’s Signature: Date: Parent/Guardian’s Name (Printed): Parent/Guardian’s Signature: Date:

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

Time is Money Join Law Insider Premium to draft better contracts faster.