Door Frame Sample Clauses

Door Frame. The doorframe shall be of at least16 gauge galvanized steel, primed, painted and cast into the wall panel.
AutoNDA by SimpleDocs
Door Frame. To have 100mm x 75mm teack wood door frame and melamine polished to match the shutter . Providing and fixing of factory finish hardwood door frame of size 2150mmx900mm with necessary hardware such as anchor No's 50.00 5990.70 299535.00 fasteners (6 nos) and the back side of the frame shall be painted with black japan paint and the front side of frame finished with melamine polish matching with the shutter laminate as approved by Engineer Incharge etc. complete.
Door Frame. All door frames are warranted for as long as the Original Consumer owns the home in which the product is installed.

Related to Door Frame

  • Doors Exterior doors may not be propped open for safety and security reasons. Students may be referred to the student conduct system if found propping these doors. Doors marked as emergency exits may only be used for emergency purposes other than during University-sanctioned move-in days.

  • Time Frames The discipline process shall be completed within six months from the date of the first notification, or within such other extended period of time as is provided for in this Agreement.

  • Time Frame The bounded Party’s(ies’) duty to hold the Confidential Information in confidence shall remain in effect until such information no longer qualifies as a trade secret or written notice is given releasing such Party from this Agreement.

  • Shiftwork (A) Where the Employee would have received shift loadings had the Employee not been on leave during the relevant period and such loadings would have entitled the Employee to a greater amount than a loading of 17.5% of the payment under clause 23.1(c), then the shift loadings must be added to the payment under clause 23.1(c)(i) instead of the 17.5% loading. (B) Provided further that if the shift allowance would have entitled the Employee to a lesser amount than the loading of 17.5% then such loading of 17.5% shall be used for the purpose of calculating annual leave loading in lieu of the shift allowance.

  • Workloads The parties agree to the following provisions relating to faculty members' workload. (a) The registration limits for all courses currently offered by the Employer in the academic, career and technology areas are 35 unless established by practice as lower, excepting multiple sections where the limit is the correct multiple of the number of sections involved. (b) The registration limits for English are as follows: (i) Writing and Composition Courses - 25 (ii) Writing Skills -17 (iii) Creative Writing - 22

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Overtime Description For Paid Holidays: Holiday pay for all holidays shall be prorated based two hours per day for each day worked in the holiday week, not to exceed 8 hours of holiday pay. For Thanksgiving week, the prorated share shall be 5 1/3 hours of holiday pay for each day worked in Thanksgiving week. Overtime Time and one half the regular rate after an 8 hour day. Time and one half the regular rate for Saturday. Double time the regular rate for Sunday.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Layout a. Estimate and quantity sheet (1) List of all bid items (2) Bid item quantities (3) Specification item number (4) Paid item description and unit of measure b. Basis of estimate sheet (list of materials) c. General notes and specification data. d. Condition diagram (1) Highway and intersection design features (2) Roadside development (3) Traffic control including illumination e. Plan sheet(s) (1) Existing traffic control that will remain (signs and markings) (2) Existing utilities (3) Proposed highway improvements (4) Proposed installation (5) Proposed additional traffic controls (6) Proposed illumination attached to signal poles. (7) Proposed power pole source f. Notes for plan layout g. Phase sequence diagram(s) (1) Signal locations (2) Signal indications (3) Phase diagram (4) Signal sequence table (5) Flashing operation (normal and emergency) (6) Preemption operation (when applicable) (7) Contact responsible Agency to obtain interval timing, cycle length and offset h. Construction detail sheets(s) (1) Poles (State standard sheets) (2) Detectors (3) Pull Box and conduit layout (4) Controller Foundation standard sheet (5) Electrical chart i. Marking details (when applicable)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!